swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-full-credentials.pdf · during...

29

Upload: others

Post on 25-Apr-2020

5 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 2: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 3: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 4: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 5: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 6: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 7: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 8: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 9: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 10: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 11: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 12: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 13: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 14: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,

1

Chittela, Venkatarakesh

From: Chittela, Venkatarakesh

Sent: Tuesday, August 06, 2013 2:43 PM

To: qubaisir

Cc: Alaa Bitar; Altamura Domenico; Paulo Mena; Kamath, Ganesh; 'Pednekar R.G. (Mumbai- Infrastructure) <[email protected]>

([email protected])'; Perciante Luigi; Tariq Ibrahim

Subject: Approval for Sub contractor of 11kV and 33kV cable works - sWITCHGEAR eLECTROMECHANICAL.

Greetings,

Please be informed that the sub contractor for 11kV and 33kV cable works – M/s Switchgear Electromechanical is approved based on ADWEA contractor list.

During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval, he informed GOPA to follow the ADWEA contractor list. As part

ADWEA contractor list M/s Switchgear electromechanical is listed and it is approved.

FYI and Necessary action.

Mit freundlichem Gruss / Best Regards ����وا ���ول ���ق ا���رام وا���د�ر Venkatarakesh Chittela Consultant Engineer (Electrical)

intec

GOPA - International Energy Consultants GmbH LLC (formerly GOPA DECON Intl. Co. LLC) Branch Middle East

Global Ascent Business Center PO Box 93820, Abu Dhabi / Mussafah United Arab Emirates Tel +971 2 5550013| Fax +971 2 5550017 | Mobile +971-55-5865301 E-mail: [email protected] Internet: www.gopa-intl.com www.gopa-intec.de www.gopa.de www.gopa-group.org Registered at Abu Dhabi, Commercial Reg. no. 1005605

ISO 9001:2008 TUV NORD certified The information contained in this e-mail message, including any attachments, is intended only for the personal and confidential use of the recipient (s) named above. This message may be an attorney-client communication and is privileged and confidential. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately by telephone or e-mail, and delete the original message.

� Think of the environment before printing this email - We do

Page 15: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 16: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 17: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 18: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 19: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 20: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 21: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 22: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 23: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 24: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 25: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 26: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 27: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 28: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,
Page 29: swgrelmech.comswgrelmech.com/wp-content/uploads/2015/11/00-Full-credentials.pdf · During discussion with ADDC engineer in Assets today regarding the submittal of Subcontractor approval,