dumont d’urville

36
Dumont d’Urville Concordia Station Dome C Mario Zucchelli Station Baia Terra Nova McMurdo Mid Point D-85 D-10 C-3 Concordia Station

Upload: ogden

Post on 03-Feb-2016

67 views

Category:

Documents


0 download

DESCRIPTION

Concordia Station. McMurdo. Concordia Station Dome C. Mid Point. D-85. Mario Zucchelli Station Baia Terra Nova. C-3. D-10. Dumont d’Urville. A Typical Calendar for Expeditions. 30/11-03/12. 31/12-03/01. 29/01-31/01. Personnel transportation. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Dumont d’Urville

Dumont d’Urville

Concordia StationDome C

Mario ZucchelliStation

Baia Terra Nova

McMurdo

Mid Point

D-85

D-10C-3

Concordia Station

Page 2: Dumont d’Urville

A Typical Calendarfor Expeditions

30/11-03/12 31/12-03/01 29/01-31/01

Page 3: Dumont d’Urville

Personnel transportation

Personnel is transferred to Dome C by Twin Otter flights.Only special materials and equipments which couldn’t stand low temperature or vibrations are allowed to be send to CHCH by commercial ship (there are 3 scheduled ships departing from August to October) and in connection with Hercules flights or Italica Ship to be delivered to MZS and, then, to DomeC by Twin Otter. Each special delivery should be authorized by each polar Institute, enquiring with weight and boxes dimensions.

Page 4: Dumont d’Urville

• From DDU, situated on an island (in Figure), materials are transferred to CAP Prud' Homme Station (CPH), site on the Antarctic continent from which the French Traverse (RAID) departs.

• Because of site shape, the Astrolabe ship can’t arrive directly to CPH, so that materials have to be transferred from DDU to CPH:

• - during the summer by helicopter; • - in January there is the possibility to

use a barge, but such opportunity remains function of the marine ice and meteorological condition;

• - during the winter it is hauled on ice.• The accessibility to DDU is function of

weather conditions too.• Each RAID is made up of a certain

number of tractors and trailers, to transport packed into container or unpacked materials (RAID composition type in Figure).

MATERIAL TRANSPORTATION

DDU

CPH

30/11-03/12

31/12-03/0129/01-31/01

Page 5: Dumont d’Urville

Last Summer CampaignPersonnel during Summer

Page 6: Dumont d’Urville

Last Summer Campaign

Page 7: Dumont d’Urville

Clean Area

Concordia

Summer camp

Obs. Geomagnetism

Vaisala weather station

Seismology

Astroconcordia

Dome C

1.050m

Glaciology

Shelter HF

Page 8: Dumont d’Urville

The Camp

Epica lab.

33 m (83mq) disassembled

Page 9: Dumont d’Urville

Summer Camp

Power Generator: 1.400 sq buildings 57 beds max

Garage tent

Storages tents

Main building

Dormitory tents

Drilling tent

Labs

Page 10: Dumont d’Urville

Concordia Station

Page 11: Dumont d’Urville

workshops

Storages sport room

Kitchen dining room

Medical

Bedrooms

Laboratories radio room

Main Buildings

Noisy

Calm

Concordia Station

Page 12: Dumont d’Urville

Inside the buildings

workshops

Storages sports room

Kitchen

dining room

Medical

Bedrooms

Laboratories radio room

Noisy

Calm

Page 13: Dumont d’Urville

Atmospheric chemmistry lab

Glaciology lab Sismology lab

Astronomy lab

Page 14: Dumont d’Urville

Medical Bedrooms

Page 15: Dumont d’Urville

Leaving room

Page 16: Dumont d’Urville

Kitchen Video room

Sport roomWorkshop

Page 17: Dumont d’Urville

Power station

The main parameter for the power station was efficiency to reduce the fuel consumption, aimed both to minimize environmental impact and costs.

It is made up of 3 Diesel generators adapted to the particular conditions of the air in DomeC.

Each Generator can deliver 125 kW at full load and the system is a co generator one that lets the recovering of waste heat both from exhaust air and from the cooling jacket water (for a total amount of around 80%).

For safety reasons, there is also an emergency diesel generator inside the noisy building.

Power supplyed in kW

Hours gen. N 1 400Hours gen. N 2 486Hours gen. N 3 1474Hours emergency gen. 15

Average KW Max KW Min KW85 135 60

Lit/week Lit/day4257 608

The Power station

during the last summer campaign

Fuel consumption

Page 18: Dumont d’Urville

During the last summer campaign the total ammount of power supplyed outside the station for research activities was 37 kW; it was delivered by sylicon cables on wooden pylons.

Activity Sect.

Page 19: Dumont d’Urville

To collect grey and black water the station is equipped with a vacuum system that lets a reduction of 80% of water consumption referred to traditional ones.Wastewaters are later treated by a reverse osmosis system developed in cooperation with ESA (EUROPEAN SPACE AGENCY).

Waste water treatment

Page 20: Dumont d’Urville

Water production and water recycling

Page 21: Dumont d’Urville

Glaciology

Geomagnetism

Weather station

Refuelling

Geomagnetism

Snow drawing

Gray water mud

Astronomic site

32 m

Tower

Atmospheric chemistry:

Research activities Seismology

Page 22: Dumont d’Urville

Glaciology

Geomagnetism

Weather station

Refuelling

Geomagnetism

Snow drawing

Gray water mud

Astronomic site

32 m

Tower

Clean air area

Atmospheric chemistry:

The idea for the futureSeismology

Astronomic sector

Page 23: Dumont d’Urville

Astronomic site

Page 24: Dumont d’Urville
Page 25: Dumont d’Urville
Page 26: Dumont d’Urville

COCHISE

3,5 m4,2 m

20 m

Page 27: Dumont d’Urville
Page 28: Dumont d’Urville

Some laboratoryes were disassembled in order to use the modular panels to built a structure to support the research acrtivities.

Page 29: Dumont d’Urville

Telecommunications

-2 Inmarsat Standard B-2 Inmarsat Fleet77-4 fax-2 Iridium -2 Iridium (mobile)-2 Standard C-1 SAE IPX 300 Full (with 6 wifi access point)

-1 HF Rode&Swartz, 150 W-2 marine VHF;-2 avio VHF -1 HF Motorola Micom2,125 W;-1 VHF marine Motorola MC900

Outside the Station:1 Inmarsat Standard B 1 Inmarsat Fleet

Alessandro
questa andrebbe aggiornata .... la sistemiamo dopo???
Page 30: Dumont d’Urville

Inside the Station 1 Inmarsat Standard B 1 Inmarsat Fleet

Page 31: Dumont d’Urville

Radio RoomInside the station the local area network is made up by a pysical part (the plugs in each room connected to a rack for each level) and an Active part (a switch at each level connected by fibber optic to the Main Switch, that is the center of the system, settled in the radio room).The connection runs at 1 Gbps

Fibber optic cable

Switch Ethernet -Enterasys 24 plugs Rj45 10/100 Mb/s

Center switch

Page 32: Dumont d’Urville

Emergency Radio room

- 1 inmarsat Standard C- 1 Iridium- 1 WiFi connection

Page 33: Dumont d’Urville

Glaciology

Geomagnetism

Weather station

Refuelling

Geomagnetism

Snow drawing

Gray water mud

Astronomic site

32 m

Tower

Atmospheric chemistry:

Data connection Seismology

fibber optic;1WiFi (bakeup connection) 54Mbit/sec

1WiFi 54Mbit/sec

1WiFi 54Mbit/sec

1 WiFi 54Mbit/sec1 WiFi 54Mbit/sec

1 Cable connection;1 Radiomodem

1WiFi 54Mbit/sec

1WiFi 54Mbit/sec

- fibber Optic

Page 34: Dumont d’Urville

ASTROCONCORDIA:

Page 35: Dumont d’Urville

BRAIN:

Page 36: Dumont d’Urville

Thanks for attention

[email protected]