  • 8/14/2019 DT Report.pdf

    1/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page1, Total17

    REVISIONS-1

    Rev. Date Descriptions

    17/NOV/2013 Korangi

    Drive Test Report

    SITE ID: S-KHI-2521

    BSC:KHIBSC32

    BSC Owner: Muhammad Asad Abbas

    Drive Test Date: 7/NOV/2013

    Approval Received

    Huawei RF Manager CMPak RF Planning Manager

  • 8/14/2019 DT Report.pdf

    2/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page2, Total17

    Table of Contents

    2 INTRODUCTION .......................................................... ........................................................... 3

    2.1 SUMMARY OF ISSUES........................................................ ................................................. 3

    2.2 AREA AND SITE INFORMATION:................................................... ...................................... 3

    2.3 DRIVE TEST ROUTE: .................................................................... ...................................... 6

    2.4

    DRIVE

    TEST

    FINDINGS

    ................................................................................................ ....... 8

    2.5 SIGNAL STRENGTH MAP -GSM(RX LEVEL)(IDLE MODE) ......................... ................ 9

    2.6 SIGNAL STRENGTH MAP -GSM(RX LEVEL SUB)(DEDICATED MODE) .............. ...... 10

    2.7 RXQUAL MAPGSM(RXQUAL SUB)[DEDICATED MODE] ................................... ...... 11

    2.8 SQIMAP [DEDICATED MODE] ........................................................................................ 12

    2.9 TIMING ADVANCE MAP [DEDICATED MODE] .............................................................. ... 12

    2.10 C/IMAP [DEDICATED MODE] ........................................................................ ................. 13

    2.11 BCCHMAP[IDLE MODE] .......................................................... .................................... 13

    2.12 CELL IDPLOT [DEDICATED MODE] ......................................................................... ...... 14

    2.13 EVENTS MAP (HANDOVER)[DEDICATED MODE] ........................................................... 14

    3 DRIVE TEST STATISTICS ........................................ .......................................................... 15

    4 GPRS/EDGE TEST ........................................................ ......................................................... 16

    4.1 PDPCONTEXT ACTIVATION.......................................................................... ................. 16

    4.2 GPRS/EDGERLCTHROUGHPUT......................................................... ......................... 16

    4.3 GPRS/EDGECODING SCHEME USAGE (UL) ............................................... ................. 17

    4.4 GPRS/EDGECODING SCHEME USAGE (DL) ............................................... ................. 17

  • 8/14/2019 DT Report.pdf

    3/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page3, Total17

    2 Introduction

    2.1 Summary of Issues

    Sr.

    SITE

    ID Site Name Area

    Planned Actual

    Action Taken Status Responsibility

    LatitudeLongitu

    de

    Latitude Longitude

    01 2521 S-KHI-2521 Korangi 24.83254 67.13471 24.83253 67.13468

    DT was

    conducted on the

    major roads

    around 2521 in

    idle mo6de &

    dedicated mode.

    OKUmair Ahmed

    Khan

    2.2 Area and Site information:

    BTS Name Frequency Configure Longitude Latitude Antenna Height Tower Height

    2521

    1800 000/888 24.83253 67.13468 25,25,25M 30 M

    M/E Down tilt Azimuth

    0 / 4 0 / 4 0 / 4 60 180 300

    Cell Information:

    CELL ID BCCH BSIC LAC HSN MAIO MA LIST

    35214 666 10 72453

    0,1,2,3,

    4688;670;673;678;681;

    35215 764 30 72433

    0,1,2,3,

    4661;664;784;789;795;

    35216 766 50 72413

    0,1,2,3,

    4761;769;777;780;786;

  • 8/14/2019 DT Report.pdf

    4/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page4, Total17

    RND Current and Field DATA:

  • 8/14/2019 DT Report.pdf

    5/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page5, Total17

    Panoramic Pictures for 2521:

    60 180

    300

  • 8/14/2019 DT Report.pdf

    6/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page6, Total17

    2.3 Drive Test route:

  • 8/14/2019 DT Report.pdf

    7/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page7, Total17

    Google Earth snap

  • 8/14/2019 DT Report.pdf

    8/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page8, Total17

    2.4 Drive Test Findings

    Drive Test was conducted on all possible routes around 2521. RF

    parameters were in acceptable ranges.

    RF Indicators

    Foot Print ARFCN (idle mode)

  • 8/14/2019 DT Report.pdf

    9/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page9, Total17

    2.5 Signal Strength Map - GSM (Rx Level) (Idle Mode)

    Chart- RxLevel (Idle mode)

  • 8/14/2019 DT Report.pdf

    10/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page10, Total17

    2.6 Signal Strength Map - GSM (Rx Level Sub) (Dedicated Mode)

    Chart- RxLevel sub (Dedicated mode)

  • 8/14/2019 DT Report.pdf

    11/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page11, Total17

    2.7 RxQual Map GSM (RxQual Sub)[ Dedicated Mode]

    Chart- RxQual Sub

  • 8/14/2019 DT Report.pdf

    12/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page12, Total17

    2.8 SQI Map[DedicatedMode]

    2.9 Timing Advance Map[DedicatedMode]

  • 8/14/2019 DT Report.pdf

    13/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page13, Total17

    2.10 C/I Map [Dedicated Mode]

    2.11 BCCH MAP [Idle Mode]

  • 8/14/2019 DT Report.pdf

    14/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page14, Total17

    2.12 Cell ID Plot [Dedicated Mode]

    2.13 Events Map (Handover) [Dedicated Mode]

  • 8/14/2019 DT Report.pdf

    15/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page15, Total17

    3 Drive Test Statistics

    Call Summary

    Event Count

    Blocked Calls 00

    Call Attempts 34

    Calls Setup 34

    Dropped Calls 00

    Handovers 36

    Handover Failures 00

  • 8/14/2019 DT Report.pdf

    16/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page16, Total17

    4 GPRS/EDGE Test

    4.1 PDP Context Activation

    Activation Failure Success Rate

    3 0 100%

    4.2 GPRS/EDGE RLC Throughput

  • 8/14/2019 DT Report.pdf

    17/17

    Drive Test Report

    11/11/2013 Confidential Information of Huawei.No Spreading without Permission

    Page17, Total17

    4.3 GPRS/EDGE Coding Scheme Usage (UL)

    4.4 GPRS/EDGE Coding Scheme Usage (DL)