DSA Inspectors Arcadia USD Arcadia HS Campus Enrichment Inspection Report Apr 2014 Architect LPA Architects DSA Application No. A03-111889 33 Narcissa Drive, Rancho Palos Verdes, CA 90275 | (626) 786-4331 | [email protected]

Upload: others

Post on 16-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

DSA Inspectors

Arcadia USD

Arcadia HSCampus Enrichment

Inspection ReportApr 2014

ArchitectLPA Architects

DSA Application No. A03-111889

33 Narcissa Drive, Rancho Palos Verdes, CA 90275 | (626) 786-4331 | [email protected]

Page 2: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Issued 03/21/13 Page 1 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

This form shall be completed by the Project Inspector, in accordance with California Code of Regulations, Title 24, Part 1, Section 4-337and submitted to the DSA.

PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD: (Continues on Page 2)

STATUS OF CONSTRUCTION WORK:

Bldg B Electrical and plumbing rough in has begun

Bldg P (East Portion - Cafeteria) Demo and abatement is ongoing

Bldg O oranamental fencing is being installed

Bldg U framing, electrical, HVAC and Plumbing is ongoing

Site-work site utilities are ongoing, Main walkway canopy north half is complete

OUTSTANDING DEVIATION NOTICES: (List “Notice Numbers” used on forms DSA 154.)

Notice issued for storefront window system being installed without approval from DSA on the deferred approval

RESOLVED DEVIATION NOTICES: (List the “Notice Numbers” used on forms DSA 154.)

None.

School District/Owner: Arcadia Unified School District DSA File #: 19 - H32

Project Name/School: Arcadia High School – Campus Enrichment DSA App. #: 03 - 111889

From: Building #(s)

(As identified on the plans): C, D, E, F, G, H, K, O, P, W, and Rally Court (site)

Kenneth Burr

DSA Project Inspector Certification #: Cert 5654, Class 1

Report #: 43 Page 1 of 2 Date of Report: 5/5/2014 DSA 152 Card #(s):

N/A

(List above all building numbers and inspection card numbers for which this report applies.)

REPORTING PERIOD DATES

From: 4/1/14 To: 4/15/14

Construction project is estimated to be 78 % complete at this time.

Page 3: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

DSA 155

PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13

Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

Report #: 43 Page 2 of 2 Date of Report: 5/5/2014 DSA App. #: 03 - 111889

PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD (Continued from Page 1)

QUESTIONS OR UNUSUAL CONDITIONS: (List any questions or unusual conditions encountered.)

None

PROBLEMS OR NON-COMPLYING CONDITIONS:

(List any problems or non-complying conditions and how they were resolved.)

[1] All Addenda are approved

[2] Storefront Deferred Approval Submittal not DSA-Approved. A/E review comments returned to GC and sub-contractor 4.18.13.

INSTRUCTIONS RECEIVED FROM THE ARCHITECT OR REGISTERED ENGINEER: (List any.)

None.

OFFICIAL SITE VISITORS: (List any and whom they represent. May include, architects, registered engineers, school district representatives, DSA field representative, etc.) .

Weekly Owner/Architect/Contractor meetings. Owner’s Rep and Architect in attendance.

Submit completed form electronically to the DSA Regional Office with construction oversight authority for the project:

DSA OAKLAND

[email protected]

DSA SACRAMENTO

[email protected]

DSA LOS ANGELES

[email protected]

DSA SAN DIEGO

[email protected]

Page 4: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Issued 03/21/13 Page 1 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

This form shall be completed by the Project Inspector, in accordance with California Code of Regulations, Title 24, Part 1, Section 4-337and submitted to the DSA.

PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD: (Continues on Page 2)

STATUS OF CONSTRUCTION WORK:

Bldg B Electrical and plumbing rough in has begun

Bldg P (East Portion - Cafeteria) Demo and abatement is ongoing

Bldg O oranamental fencing is being installed

Bldg U framing, electrical, HVAC and Plumbing is ongoing

Site-work site utilities are ongoing, Main walkway canopy north half is complete

OUTSTANDING DEVIATION NOTICES: (List “Notice Numbers” used on forms DSA 154.)

Notice issued for storefront window system being installed without approval from DSA on the deferred approval

RESOLVED DEVIATION NOTICES: (List the “Notice Numbers” used on forms DSA 154.)

None.

School District/Owner: Arcadia Unified School District DSA File #: 19 - H32

Project Name/School: Arcadia High School – Campus Enrichment DSA App. #: 03 - 111889

From: Building #(s)

(As identified on the plans): C, D, E, F, G, H, K, O, P, W, and Rally Court (site)

Kenneth Burr

DSA Project Inspector Certification #: Cert 5654, Class 1

Report #: 44 Page 1 of 2 Date of Report: 4/18/2014 DSA 152 Card #(s):

N/A

(List above all building numbers and inspection card numbers for which this report applies.)

REPORTING PERIOD DATES

From: 4/16/14 To: 4/30/14

Construction project is estimated to be 78 % complete at this time.

Page 5: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

DSA 155

PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13

Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

Report #: 44 Page 2 of 2 Date of Report: 4/18/2014 DSA App. #: 03 - 111889

PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD (Continued from Page 1)

QUESTIONS OR UNUSUAL CONDITIONS: (List any questions or unusual conditions encountered.)

None

PROBLEMS OR NON-COMPLYING CONDITIONS:

(List any problems or non-complying conditions and how they were resolved.)

[1] All Addenda are approved

[2] Storefront Deferred Approval Submittal not DSA-Approved. A/E review comments returned to GC and sub-contractor 4.18.13.

INSTRUCTIONS RECEIVED FROM THE ARCHITECT OR REGISTERED ENGINEER: (List any.)

None.

OFFICIAL SITE VISITORS: (List any and whom they represent. May include, architects, registered engineers, school district representatives, DSA field representative, etc.) .

Weekly Owner/Architect/Contractor meetings. Owner’s Rep and Architect in attendance.

Submit completed form electronically to the DSA Regional Office with construction oversight authority for the project:

DSA OAKLAND

[email protected]

DSA SACRAMENTO

[email protected]

DSA LOS ANGELES

[email protected]

DSA SAN DIEGO

[email protected]

Page 6: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Arcadia High SchoolWeek of April 04, 2014

Top right termite damage to header in the cafeteriaTop left Ductwork delivery to the libraryBottom Right laying out for circle soffitBottom left framing block for circle soffit

Page 7: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Arcadia high SchoolWeek of April 11, 2014

Top Right duct being installed in the libraryTop Left framing the circle soffitBottom Right framing the circle soffitBottom Left trenching for the storm drain at the library

Page 8: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Arcadia High SchoolWeek of April 18, 2014

Top Right waste and vent lines in the restrooms by student storeTop Left site demo south side of JBottom Right circle soffit framing in the libraryBottom Left restroom walls in the library

Page 9: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Arcadia High SchoolWeek of April 30, 2014

Top Right site water valves south side of JTop Left water valves and gas linne under storm drainBottom Right ductwork installed with flexes attachedBottom Left circle soffit framing with recessed lighting

Page 10: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107

Campus Enrichment Project Daily Report

Daniel Alberico Phone: none

DSA #4269 Fax: none

Cell: (818) 402-7163

Email: [email protected]

April 1, 2014 Overcast, 65

Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32

180 Campus Dr, Arcadia, Ca 91007

Architect: LPA Architects Construction Manager: McCarthy Building Companies Testing Laboratory: Nino and Moore General Contractor: McCarthy Building Companies WORK COMPLETED: 7-Carpenters on framing crew at the library installing steel beams for the Hvac roof units, forming for bathroom curbs and epoxing allrthread bolts. 2- Miller Demolition workers at building P continue demolition at the restrooms in building P and start demolition of shear wall on west side of building. 2-Murry company Plumbers continue roof drain installation. 3- Insulation workers installing wall insulation at building B. 4- TSI steel workers installing steel beams at roof for Hvac units. SPECIAL INSPECTION: Nino and Moore Steel Inspector on site at building U repair to existing beams Per RFI #83. MEETINGS: none DEVIATIONS: none REMARKS: DSA field Engineer-Natu Patel on site and issued Field Note #9 and jobwalk.

Page 11: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107

Campus Enrichment Project Daily Report

Daniel Alberico Phone: none

DSA #4269 Fax: none

Cell: (818) 402-7163

Email: [email protected]

April 2, 2014 Clear, 65

Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32

180 Campus Dr, Arcadia, Ca 91007

Architect: LPA Architects Construction Manager: McCarthy Building Companies Testing Laboratory: Nino and Moore General Contractor: McCarthy Building Companies WORK COMPLETED: 5-Carpenters on framing crew at the library installing roof blocking, misc, forming for bathroom curbs. 2- Miller Demolition workers continue demolition of building U masonry screen wall on the north-west corner of building. 2-Murry company Plumbers installing gas line, and roof drain strubs on the north side of building U. 3- Drywall workers start installing drywall at building P. 4- TSI steel workers installing steel beams at roof for Hvac units.

SPECIAL INSPECTION: none

MEETINGS: none DEVIATIONS: none REMARKS: none

Page 12: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107

Campus Enrichment Project Daily Report

Daniel Alberico Phone: none

DSA #4269 Fax: none

Cell: (818) 402-7163

Email: [email protected]

April 3, 2014 Clear, 65

Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32

180 Campus Dr, Arcadia, Ca 91007

Architect: LPA Architects Construction Manager: McCarthy Building Companies Testing Laboratory: Nino and Moore General Contractor: McCarthy Building Companies WORK COMPLETED: 5-Carpenters on framing crew at the library installing roof blocking, misc, forming for bathroom curbs, rebar. 2- Miller Demolition workers completed demolition of building U masonry screen wall on the north-west corner of building. 2-Murry company Plumbers installing gas line, and roof drain strubs on the north side of building U. 3- Drywall workers continue installing drywall at building P. 4- TSI steel workers installing steel beams at roof for Hvac units.

SPECIAL INSPECTION: none

MEETINGS: none DEVIATIONS: none REMARKS: none

Page 13: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107

Campus Enrichment Project Daily Report

Daniel Alberico Phone: none

DSA #4269 Fax: none

Cell: (818) 402-7163

Email: [email protected]

April 4, 2014 Clear, 65

Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32

180 Campus Dr, Arcadia, Ca 91007

Architect: LPA Architects Construction Manager: McCarthy Building Companies Testing Laboratory: Nino and Moore General Contractor: McCarthy Building Companies WORK COMPLETED: 5-Carpenters on framing crew at the library installing soffits, misc, forming for bathroom curbs, rebar. 2- Miller Demolition workers removing demolition of building U masonry screen wall on the north-west corner of building. 2-Murry company Plumbers installing roof drain lines at building U. 3- Drywall workers continue installing drywall at building P. 4- TSI steel workers installing steel beams at roof for Hvac units.

SPECIAL INSPECTION: none

MEETINGS: none DEVIATIONS: none REMARKS: none

Page 14: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/7/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

6 Framers framing soffits and wall sin building U

7 Electrical roughing in conduits in building B and conduits in the walls at U

3 Plumbers roughing in waste and vent lines in the student store

5 Demo demoing walls in the cafeteria

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 15: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/8/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

6 Framers framing soffits and wall sin building U

7 Electrical roughing in conduits in building B and conduits in the walls at U

3 Plumbers roughing in waste and vent lines in the student store

5 Demo demoing walls in the cafeteria

4 Painters painting canopy east side of the finger buildings

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 16: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/9/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

6 Framers framing soffits and wall sin building U

7 Electrical roughing in conduits in building B and conduits in the walls at U

3 Plumbers roughing in waste and vent lines in the student store

5 Demo demoing walls in the cafeteria

4 Painters painting canopy east side of the finger buildings

3 SS erecting the supports on the underside of library roof for hvac supports

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 17: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/10/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

6 Framers framing soffits and wall sin building U

5 Plumbers roughing in waste and vent lines in the student store

5 Demo demoing walls in the cafeteria

4 Painters painting canopy east side of the finger buildings

2 Glazers installing blackout windows in the finger buildings

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 18: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/11/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

5 Framers framing soffits and wall sin building U

5 Demo demoing walls in the cafeteria

4 Painters painting canopy east side of the finger buildings

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 19: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/14/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

5 Framers framing soffits and walls in building U

5 Demo demoing walls in the cafeteria

4 Painters painting canopy east side of the finger buildings

1 Lather placing expanded metal in plaster patch areas

3 Plumbers waste and vent in the student store, welding gas line for U

6 Electrical conduits and boxes rough in the library

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 20: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/15/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

5 Framers framing soffits and walls in building U

4 Demo demoing walls in the cafeteria

4 Painters painting canopy east side of the finger buildings

1 Lather placing expanded metal in plaster patch areas

4 Plumbers waste and vent in the student store, welding gas line for U

8 Electrical conduits and boxes rough in the library

2 HVAC setting controls on the rooftop units

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 21: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/16/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

5 Framers framing soffits and walls in building U

2 Concrete floating bottoms of windows in U to level the aluminum frames

4 Painters painting canopy east side of the finger buildings

4 Plumbers waste and vent in the student store, welding gas line for U

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 22: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/17/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

5 Framers framing soffits and walls in building U

2 Concrete floating bottoms of windows in U to level the aluminum frames

4 Plumbers waste and vent in the student store, welding gas line for U

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 23: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/17/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

5 Framers framing soffits and walls in building U

3 Concrete floating bottoms of windows in U to level the aluminum frames

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 24: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/21/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

4 Graders grading the restroom and the student store

4 SS erecting the equipment screen on the roof of the library

6 Framers framing soffits, walls and window infills in the library

3 Utility trenching for gas and water on the south side of building J

7 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 25: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/22/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

4 Graders grading the restroom and the student store

3 SS erecting the equipment screen on the roof of the library

7 Framers framing soffits, walls and window infills in the library

3 Utility trenching for gas and water on the south side of building J

7 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P

5 Paint painting classrooms in building B

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 26: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/23/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

4 Graders grading the restroom and the student store

3 SS erecting the equipment screen on the roof of the library

9 Framers framing soffits, walls and window infills in the library

3 Utility trenching for gas and water on the south side of building J

8 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P

5 Paint painting classrooms in building B

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 27: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/24/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

4 SS erecting the equipment screen on the roof of the library

9 Framers framing soffits, walls and window infills in the library

8 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 28: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/25/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

4 SS erecting the equipment screen on the roof of the library

9 Framers framing soffits, walls and window infills in the library

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 29: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/28/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

4 SS erecting the equipment screen on the roof of the library

6 Framers framing soffits, walls and window infills in the library

4 Demo sealing columns in the library with exposed mastic

3 Plumbers sewer and water tie in at student store

5 Electrical rough in at U and P

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 30: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/29/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

4 SS erecting the equipment screen on the roof of the library

6 Framers framing soffits, walls and window infills in the library

4 Demo sealing columns in the library with exposed mastic

3 Plumbers sewer and water tie in at student store

5 Electrical rough in at U and P

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None

Page 31: DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT

Knowland Construction

33 Narcissa Dr. Palos Verdes, CA. 90275

KNOWLAND CONSTRUCTION SERVICES

Daily Report

Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654

Date: 4/30/2014

Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE

4 SS erecting the equipment screen on the roof of the library

6 Framers framing soffits, walls and window infills in the library

4 Demo sealing columns in the library with exposed mastic

4 Plaster scrath coat at the patches and breezeway in building B

5 Electrical rough in at U and P

SPECIAL INSPECTIONS

None DEVIATIONS:

None REMARKS

None