Driving Status of N*Grid Project in Korea
August 27, 2003
Jongsuk Ruth Lee
KISTI Supercomputing Center
Table of Contents
Definition of Grid Status of Resources & Grid Necessity N*Grid Project Plans for Activating N*Grid Project
Implementation of Grid Testbed Development of Grid System Research on Grid Applications Strategy for N*Grid Project Milestones
Summary
Definition of Grid
Definition of Grid Research Infrastructure for dynamically collecting & integrated sharing Research Resources connected by high-speed network
Large Scale Data
Scientific Research Instrument
Experts Problem Solving
GRIDGRID
Supercomputer
Status of Resources&
Grid Necessity
Status of Research Resources (1/2)
Status of Supercomputer usage (KSCA, 2003. 3)
Organization
Utilization
KISTI
80%
KMA
80%
SNU
70%
DIU
30%
CNU
40%
POSTECH
60%
PNU
70%
K-JIST
60%
Name Organization
High Voltage Transmission Electron Microscopy KBSI
NMR Spectroscopy KBSI
Hanbit Plasma Equipment KBSI
Electron Linear Accelerator POSTECH
Research Reactor Hanaro KAERI
Wind tunnel KARI
Flight Simulator KARI
Status of the only Research Instruments Holding
Status of Research Resources (2/2)
Status of Research Networks Domestic
KOREN : 30Gbps/1GbPS KREONET2 : 10Gbps/1Gbps
International APII Testbed (Korea – Japan) : 1Gbps etc TEIN : ~ 30Mbps STAR TAP LINK : ~155Mbps
Campus/Industry Network : Gbps
Necessity of Introducing Grid (1/2)
Demand of Domestic Computing Resources
0
20
40
60
80
100
120
140
160
1996 1997 1998 1999 2000 2001 2002
Rmax
(TFl
ops)
USA KOREA Domestic Demand
148.7
12.4
2.6
Necessity of Introducing Grid (2/2)
Necessity of Research Infrastructure Implementation
Necessity of investing fund to implement Grid infrastructure for 6T researches to access any computing resources and data any time and any where
* Status of 6T Research Fund ( IT News : 23. 7. 2002)
Areas IT
Research
Fund
1241.7
billion
BT
374.2
billion
ET
219.3
billion
ST
157.2
billion
NT
81.9
billion
CT
32.3
billion
Total
2106.5
billion
N*Grid Project
11
N*Grid includes National Computational Grid National Data Grid National Access Grid National Application Grid (Ex: Bio Grid, CFD Grid, Meteo Grid etc) including application testbed and portals
N*Grid is planned at the government level by MIC(Ministry of Information and Communication)
5 year project (2002-2006) Total budget : ~ 32M USD
N*Grid Project (1/6)
History of N*Grid with KISTI 1998-1999: Preceding research
Development of metacomputing technology on heterogeneous supercomputing resources(The result is published at PDPTA2000 conference)
Development of a portable computational steering package: CSP
2000: Initiation of Globus-related research and activity Building of Globus-based metacomputing test-bed Satoshi Sekiguchi(TACC, Japan) proposed Korea to join APGrid(Jun., Dec.)
2001: N*Grid start KISTI Supercomputing Center suggest at MIC to carry out N*Grid(Feb.) MIC announced to start N*Grid as a 5 year(2002-2006) national project(May.) Korea Gird Forum will be launched in Oct., 2001.
N*Grid Project (2/6)
Major Contents of N*Grid (2002-2006)
Building and operation of Grid Network (using KOREN, APII Testbed, KREONet2, HPCNet, etc.)
Grid application project survey and support (Bio, CFD, Meteo, etc.)
Grid related R&D and standardization (Grid middleware & Grid browser, etc.)
Promotion for sharing of high performance computers and large-scaled research instruments (Supercomputer, Storage, etc.)
Construction of Grid Forum Korea (Include gov., univ., research inst., etc.)
N*Grid Project (3/6)
14
Grid Middleware
Internet 1 & 2
High Speed Network/ATM
Supercomputers
Large capacity Storages
Research Instruments
Creative Experts
GRID Project
Survey & Support
(NGI Killer Appl.)
Increase Research Power for fundamental Science and Industry Application → Activation of NGI Business Application
Leap for World Top 5 Country in Knowledge Infrastructure
(Enhancement of National Competitiveness)
Execution of Grid Application Project
Emerging Industry: IT, BT, NT, ET, etc. Industry: Semiconductor, Car, Steel, Machinery, etc.
N*Grid
N*Grid Project (4/6)
N*Grid Project (5/6)
KISTI is the leading edge institution
Selected research partners from academia, industry, and government lab through a public competition 13 partners in constructing Grid infrastructure (e.g., Constructio
n of national supercomputer Grid) 8 partners in Grid middleware researches (e.g., Grid technology
for high-end Grid environment) 10 partners in Grid applications R&D (e.g., Virtual Wind Tunnel
using Grid) 2 partners in Grid standardization of Grid middleware technology
(e.g., GridIR WG, DAIS WG)
N*Grid Project (6/6) GFK (Grid Forum Korea)
The Grid organization in Korea (878 members from 254 organizations & 25 WGs as of Aug. 2003)
Its support is included in the N*Grid project GFK 2002 Summer Workshop (July 11-12, 2002, 280 participants) GFK 2002 Winter Workshop (Dec. 10-11, 2002, 200 participants) GFK 2003 Summer Workshop (Aug. 19-21, 2003, 220 participants)
Working Groups Application Area : 10 WGs Middleware Area : 6 WGs Network Area : 2 WGs Etc.: 7 WGs
Participating Individuals Government Institution :41 University : 95 Research Institute : 475 Industry : 267
Plans for Activating N*Grid
Plans – Implementation of Grid Testbed (1/2)
Implementation of Computing Grid Testbed Public supercomputer: 8 HPC PC Cluster: 8
KMA
KOREN, APII, TEIN, STARTAP
KREONET2, HPCNET
KAIST
POSTECH
KISTI
CNU
KJISTDIU
SNU
KIAS
SAIT
KIST
KISTI
UOS
PNU
Supercomputer
Cluster
CNU
SAIT
Plans – Implementation of Grid Testbed (2/2)
Implementation of Access Grid Testbed Large Scale Storage: 8 VR System: 3 Access Grid System: 3
KOREN, APII, TEIN, STARTAP
KREONET2, HPCNET
Grid Middleware
SNU
KMA
KISTI
EVL
KISTI
KJIST
KNUPNU
KMA
KRIBB
KIST
NCSA
KISTI
Storage
VR System
Access GridSystem
Plans – Development of Grid System (1/4)
Development of N*Grid Portal System Providing Grid log-in, distributed file transfer, collection and
integration of results, monitoring of Grid resources & jobs, etc
Plans – Development of Grid System (2/4) Development of Grid Advanced Information Service System
Providing the integration function of multiple resources query interfaces, dynamic state information, dynamic virtual organization information, etc
Request Distributor
Grid Advanced Information Service(GAIS)
VO Manager
Missing Info. Processing
AgentParticipation
Manager
VO K
GridServiceResource
Resource
ResourceGridService
GridService
QueryProcessor
VO 1
GridServiceResource
Resource
ResourceGridService
GridService
Service RegistryManager
Service Data
ManagerResource manager
ResourceInfo.
Manager
VO info Resource info
Service data info
Service Desc.
GAIS backend
Plans – Development of Grid System (3/4) Development of MoreDream Resource Management
Supporting the functions of the Resource discovery, co-allocation, job submission, job monitoring, etc.
Plans – Development of Grid System(4/4)
Development of N*Grid CA System Supporting the functions of the Web-interface, PKI, key
automatic generation/management/search, etc.
Plans – Research on Grid Applications
Application Researches on IT+IT, IT+BT, IT+NT, … based on Grid Applications for the large-volume and repeated computation Applications for massively parallel environment which are can divided
and analyzed Bio, new drug, ST, NT, ET, Computer Graphic (Rendering), etc.
Construction of bio-informatics portal grid Computational chemistry and Nano materials Molecule simulation of Bio/Nano materials Electronic structure computational Grid Nano materials computational Grid Comprehensive environmental flow model Large-scale finite element analysis technique on GRID environment Design shape optimization technology using virtual wind tunnel based
on Grid Realization of virtual design & development Grid system Heat exchanger design under the Grid environment
Examples
Plans – Implementation of Grid NOC
Construction of Logical Grid Network and Technical Support using National & International Network
A : Requirement of common use of national/international R&D network / Support of scientific technology application resources
B : Requirement of scientific technology application resources / support & sharing of R&D network resources
C: Control of user connection (providing connection channel between domestic R&D network)
MIC
Supercomputer/Cluster, Visualization System (SeeMore) Science Technology Information DB
User Group
Resources
Establish PoliciesImplementation & Operation
GRIDForum
- Korea-Japan, Korea-Singapore Link- Korea-USA Link(via Japan)
- National Size (Backbone over 15 areas)- Joining Institute: about 300 R&D Institutes- R&D Exclusive Korea-Japan and Korea-USA Links
- Backbone over 5 areas- Joining Institute: 32 R&D Institutes
KREONet/HPCNet/KREONet2 KORENAPII-Testbed
- Bandwidth Allocation- User Connecting Control/Management- Network Facility Management/Operation- Network Security/Engineering
GRID-NOC
InterconnectionInterconnection
B A A B
User Group User Group
Domestic R&D Research Network
CC
Plans – Strategy for N*Grid Project (1/2)
Phased implementation of N*Grid infrastructure Exhibitory implementation from computing Grid
Phased plans Year 2002-2004
Implementation of Computing Grid Implementation of Grid mobile access environment Research on exhibitory applications
Year 2005-2006 Implementation of Data Grid Implementation of Virtual Realization Grid Research on specific applications
Year 2007-2011 Implementation of scientific research equipment Grid Implementation of open Grid
Virtual wind tunnel equipment
Integration of Data Grid
Integration of Access Grid
Supporting mobile Grid
III (2007-2011)
Electron liner accelerator
DB centricVirtual realization
system centricIncluding medium and small size computer
II (2005-2006)
Electron microscopyStorage centricAccess Grid system
centricMedium and large size
computing centricI
(2002-2004)
Scientific ResearchEquipment Grid
Data GridAccess GridComputing GridPhase
Phase III(2007-2011)
Phase II(2005-2006)
Phase I(2002-2004)
Computing GridComputing Grid
Access Grid
Data GridData Grid
Access Grid Computing Grid
Scientific Research Scientific Research Equipment GridEquipment Grid
Computing Grid Access Grid
Data Grid
Plans – Strategy for N*Grid Project (2/2)
Plans – Milestones
Main ContentsPhase 1
2002 - 2004
Phase 2
2005 - 2006
Phase 3
2007 - 2011
- Computing Grid Testbed . Medium and large size computer centric . Medium and small size computer inclusion . Supporting mobile Grid - Latest Access Grid Testbed . VR Grid . Access Grid . Data Grid - Scientific Research Equipment Grid Testbed . Electron microscopy . Liner accelerator . Virtual wind tunnel equipment
Testbed
- Research on Grid Applications . Research on exhibitory applications . Research on specific applications - Development of Grid System . Grid Portal . GNOC system . Collaborative VR System . Mobile Grid Access System
Applications and
System Developmen
t
Summary
The goal of the N*Grid project is to build a national Grid infra as a high performance research cyber infra.
The N*Grid project is to enhance research productivity in the fields of science and technology.
The future direction of N*Grid project will be emphasized on the activation of Grid technology research
- by participating in GGF WG/RGs for the international Grid technology standardization, - by implementing international standard Grid testbeds, and - by developing of Grid Middleware and applications.
Thank you for your kind attention.