Page 1: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Drinking Water Drinking Water Management of Management of

Jaipur CityJaipur City

Presented by Presented by

Dinesh SharmaDinesh Sharma

Superintending Engineer, City CircleSuperintending Engineer, City Circle

Page 2: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Salient FeaturesSalient Features

Population of City as per 2001Population of City as per 2001 23.74 lacs23.74 lacs

Present PopulationPresent Population 31.12 lacs31.12 lacs

Population connected with water Population connected with water supplysupply

27.98 lacs27.98 lacs

Water demandWater demand 4197 lac lit4197 lac lit

Page 3: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Water Water ProductionProduction

From tube wells (1897 From tube wells (1897 nos)nos)

2900 lac lit2900 lac lit

From Bisalpur SystemFrom Bisalpur System 720 lac lit720 lac lit

From single point tube From single point tube wells (117 nos)wells (117 nos)

15 lac lit15 lac lit

TotalTotal 3620 lac lit3620 lac lit

Page 4: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Details of SourcesDetails of Sources

Tube wellsTube wells 18971897

Hand pumpsHand pumps 19831983

PVC tanksPVC tanks 510 510

No of water supply ZonesNo of water supply Zones 112112

No of tanker trips per dayNo of tanker trips per day 10001000

Qty supplied through Qty supplied through tankerstankers

40 lac lit40 lac lit

Page 5: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Description of water Description of water connectionsconnections

Total ConnectionsTotal Connections 363468363468

Working connectionsWorking connections 332435332435

Metered ConnectionsMetered Connections 327704327704

Flat rate connectionsFlat rate connections 47314731

Domestic ConnectionsDomestic Connections 285297285297

Non DomesticNon Domestic 4037640376

Industrial ConnectionsIndustrial Connections 20312031

Public Stand PostPublic Stand Post 11701170

Page 6: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Present ScenarioPresent Scenario

Page 7: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Water supply systemWater supply system Water supply to different distribution zones is being Water supply to different distribution zones is being

done though head works consisting of tube wells, Clear done though head works consisting of tube wells, Clear Water reservoirs, pumping stations, Service Reservoirs. Water reservoirs, pumping stations, Service Reservoirs.

Water is collected from tube wells and collected into Water is collected from tube wells and collected into CWR pumped to SR and supplied during supply hrs. CWR pumped to SR and supplied during supply hrs.

Surplus water is transferred to deficit zones thorough Surplus water is transferred to deficit zones thorough transfer mains as ground water availability is not transfer mains as ground water availability is not uniform thorough out the city.uniform thorough out the city.

Water Supply to walled city is from Amanishah head Water Supply to walled city is from Amanishah head works, Ramniwas head works and Laxman Doongri works, Ramniwas head works and Laxman Doongri Head works.Head works.

The supply in walled city is maintained in Chowkri wise The supply in walled city is maintained in Chowkri wise zoneszones

The total demand of city is maintained from water The total demand of city is maintained from water production from 1897 tube wells yielding 290 mld production from 1897 tube wells yielding 290 mld water and 50 mld from Bisalpur System. water and 50 mld from Bisalpur System.

Page 8: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Month wise water demand from Bisalpur Jaipur ProjectMonth wise water demand from Bisalpur Jaipur Project

S.No.Name of Distribution

CentreJan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11

1 Pratap nagar Sec 17 2.00 2.00 2.00 2.50 2.50 2.50 2.502 Pratap nagar Sec 26 1.50 1.50 1.50 1.50 1.50 1.50 1.503 Shanti Nagar 2.50 2.50 3.00 3.00 3.00 3.00 3.004 Civil lines 1.00 1.00 1.00 1.50 1.50 1.50 1.505 Mahesh Nagar 2.00 2.00 2.50 2.50 2.50 2.50 2.506 Maharani Farm 1.00 1.00 1.00 1.50 1.50 1.50 1.507 Ram Niwas Bagh 7.00 10.00 14.00 20.00 20.00 20.00 20.008 Bapu Nagar 2.00 2.00 2.50 2.50 2.50 2.50 2.509 Himmat Nagar 0.50 0.50 0.50 1.00 1.00 1.00 1.00

10 Jawahar Nagar 5.50 5.50 5.50 6.00 6.00 6.00 6.0011 Adarsh Nagar 5.00 5.00 5.00 6.00 6.00 6.00 6.0012 Sindhi Colony 1.50 1.50 1.50 2.00 2.00 2.00 2.0013 Truck Stand 9.00 9.00 9.00 9.00 9.00 9.00 9.0014 Jagatpura 3.00 3.00 4.00 4.00 4.00 4.00 4.0015 Malviya Nagar 2 6.00 6.00 7.00 8.00 8.00 8.00 8.0016 Malviya Nagar 9 2.00 2.00 2.00 3.00 3.00 3.00 3.0017 Barkat Nagar 1.00 1.00 1.00 2.00 2.00 2.00 2.0018 Jyoti Nagar 2.00 2.00 2.50 2.50 2.50 2.50 2.5019 Jhotwara 4.00 4.00 5.00 5.00 5.00 5.00 5.0020 Murlipura   2.00 2.00 3.00 3.00 3.00 3.0021 Gopalbari 1.00 1.00 1.00 1.00 1.00 1.00 1.0022 Sanganer 1.50 1.50 2.50 2.50 2.50 2.50 2.50

    61.00 66.00 76.00 90.00 90.00 90.00 90.00

1. Water transfer to Jhotwara shall be maintained by discontinueing water transfer 2.4 mld to Amanishah2. Water transfer to Gopalbari shall be made from Shanti Nagar Pumping Station.3. Water transfer to Pratap Nagar Sec 26 shall be made through Pratap Nagar 171. Water transfer to Murlipura shall be maintained by discontinueing water transfer 2 to 3 mld to Amanishah

Page 9: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Design demand from Bisalpur Design demand from Bisalpur SystemSystem

Year Design Demand (mld)

2008 298.65

2009 335.3

2010 373.68

2011 418.02

2016 601.35

Page 10: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Bisalpur SystemBisalpur System

The Bisalpur System consists of two partsThe Bisalpur System consists of two parts Transmission SystemTransmission System Transfer System. Transfer System. Transmission System consists of Transmission System consists of

Raw water from Bisalpur Dam is pumped to Raw water from Bisalpur Dam is pumped to filter plant 400 mld at Surajpurafilter plant 400 mld at Surajpura

Filteration and Chlorination at filter plant Filteration and Chlorination at filter plant Treated water is transferred to rural areas Treated water is transferred to rural areas

and Jaipur City upto Balawala pumping and Jaipur City upto Balawala pumping stationstation

Page 11: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Transmission system contd…..Transmission system contd…..

PipelinesPipelines Central Feeder from Balawala to Central Feeder from Balawala to

Jawahar Circle, Ramniwas Bagh, Jawahar Circle, Ramniwas Bagh, Amanishah, Shastri Nagar, Amanishah, Shastri Nagar, Vidhyadhar Nagar, VKI area. Jawahar Vidhyadhar Nagar, VKI area. Jawahar Circle to Mahesh Nagar, Triveni Circle to Mahesh Nagar, Triveni Nagar, Barkat Nagar. Rambagh to Nagar, Barkat Nagar. Rambagh to Jypti Nagar, Civil Lines, Shanti Nagar.Jypti Nagar, Civil Lines, Shanti Nagar.

Western feeder from Balawala to Western feeder from Balawala to Mansarovar, Shyam Nagar, Vidhyut Mansarovar, Shyam Nagar, Vidhyut Nagar, Khatipura, JhotwaraNagar, Khatipura, Jhotwara

Page 12: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Tanker transportation of waterTanker transportation of water Tanker transportation of water is being done in Tanker transportation of water is being done in

connected as well as unconnected areas of city connected as well as unconnected areas of city throughout the year.throughout the year.

Tanker transportation of water is being done mainly in Tanker transportation of water is being done mainly in areas along Agra Road, Jagatpura, along Delhi By Pass areas along Agra Road, Jagatpura, along Delhi By Pass road where there is no distribution system. In addition road where there is no distribution system. In addition to this tail end areas of distribution system of walled to this tail end areas of distribution system of walled city, Murlipura, Jhotwara, Shastri Nagar, Jawahar city, Murlipura, Jhotwara, Shastri Nagar, Jawahar Nagar Kachhi Basti, Jhalana, Pratap Nagar, Khatipura, Nagar Kachhi Basti, Jhalana, Pratap Nagar, Khatipura, Hasanpura, 22 godam kachhi basti, Barkat Nagar etc.Hasanpura, 22 godam kachhi basti, Barkat Nagar etc.

Improvement in distribution system is being done for Improvement in distribution system is being done for ex. Top Khanna Hazauri, Mandi Khitikan, Kanwar ex. Top Khanna Hazauri, Mandi Khitikan, Kanwar Nagar, Kamela Ki gali, Jagatpura etc.Nagar, Kamela Ki gali, Jagatpura etc.

Nos of tanker trips during summers was about 2800. Nos of tanker trips during summers was about 2800. The present no of trips is about 1000. Out this about The present no of trips is about 1000. Out this about 300 are running in outer unconnected areas and 300 are running in outer unconnected areas and balance in the connected areas. balance in the connected areas.

Page 13: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Tanker transportation contd..Tanker transportation contd..

The sanction for water transportation in previous The sanction for water transportation in previous years has been issued by department, during the years has been issued by department, during the year 2009-10 and upto 15.08.10 was issued year 2009-10 and upto 15.08.10 was issued under Central Relief Fund.under Central Relief Fund.

Sanction of water transportation from Sanction of water transportation from 16.08.2010 is still pending proposals for sanction 16.08.2010 is still pending proposals for sanction has already been submitted. Sanction of water has already been submitted. Sanction of water transportation is urgently required so that the transportation is urgently required so that the work is regularised and payment is made to the work is regularised and payment is made to the contractors, the contractors are pressing hard contractors, the contractors are pressing hard for payment who may stop the work due to non for payment who may stop the work due to non payment.payment.

Proposals for sanction of water transportation Proposals for sanction of water transportation from April 2011 to July 2011, has also been from April 2011 to July 2011, has also been submitted for sanction.submitted for sanction.

Page 14: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Details of Contingency schemes Details of Contingency schemes sanctionedsanctioned

Contingency Scheme Summer 2009 Ph I Contingency Scheme Summer 2009 Ph I estimated cost Rs 340 lacsestimated cost Rs 340 lacs 40 tube wells drilled and commissioned40 tube wells drilled and commissioned 10 hand pumps drilled and commissioned10 hand pumps drilled and commissioned Contingency Scheme Summer 2009 Ph II Contingency Scheme Summer 2009 Ph II

estimated cost Rs 880.50 lacsestimated cost Rs 880.50 lacs 85 tube wells sanctioned 85 drilled 78 commissioned85 tube wells sanctioned 85 drilled 78 commissioned 50 single point tubewells 49 drilled & commissioined50 single point tubewells 49 drilled & commissioined 30 hand pumps 26 drilled and commissioned30 hand pumps 26 drilled and commissioned During the current financial year there is no During the current financial year there is no

contingency scheme. All the works are to be contingency scheme. All the works are to be executed under planexecuted under plan

Page 15: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Pollution Mitigation worksPollution Mitigation worksName of Scheme Year Estimated

CostSanctioned length

Physical Progress

Walled City I 2004-05

116.05 27.40 27.40

Kamela Area 2005-06

222.24 11.50 11.50

Walled City II 2005-06

498.25 24.80 24.80

Pollution Mitigation walled city

2007-08

3596.09 45.10 45.10

Replacement of pipelines in outer areas

2008-09

2313.16 68.57 58.21

Total 6746.14 177.37 167.21

Page 16: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Water Quality Assurance and Water Quality Assurance and MonitoringMonitoring

Regular chlorination of water is done by Regular chlorination of water is done by bleaching powder at pumping stations.bleaching powder at pumping stations.

Pumping stations under Bisalpur Project Pumping stations under Bisalpur Project are provided with gas chlorination.are provided with gas chlorination.

100 online chlorination plants has been 100 online chlorination plants has been installed on tube wells.installed on tube wells.

12 Electro-chlorinators are working in 12 Electro-chlorinators are working in pump houses.pump houses.

Daily water samplings are done for Daily water samplings are done for residual chlorine and bacteriological residual chlorine and bacteriological examination.examination.

Page 17: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

24 X 7 water supply in pilot 24 X 7 water supply in pilot areasareas

A MOU was signed among Ranhill Co Malaysia A MOU was signed among Ranhill Co Malaysia MJP and Govt. of RajasthanMJP and Govt. of Rajasthan

Pilot project for 24 hrs water supply has been Pilot project for 24 hrs water supply has been started in 4 zones of Jaipur City.started in 4 zones of Jaipur City. Mansarovar Sec 1Mansarovar Sec 1 Mansarovar Sec 3Mansarovar Sec 3 Mansarovar Sec 9Mansarovar Sec 9 Malviya Nagar Sec 9Malviya Nagar Sec 9

These zones are provided with separate pipe lines These zones are provided with separate pipe lines from Service Reservoir, along with bulk meter from Service Reservoir, along with bulk meter for metering. Non functional consumer meters for metering. Non functional consumer meters are also replaced. Daily meter reading are taken are also replaced. Daily meter reading are taken of consumer meter readings and bulk meters.of consumer meter readings and bulk meters.

Page 18: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

24x7 contd..24x7 contd..

The sector wise number of consumers are Mansarovar Sec The sector wise number of consumers are Mansarovar Sec 1 – 139, Sec3 -295, Sec 9 – 135 and Malviya Nagar Sec 9 – 1 – 139, Sec3 -295, Sec 9 – 135 and Malviya Nagar Sec 9 – 140 .140 .

During the execution of work IEC activities were done to During the execution of work IEC activities were done to educate the consumers for water conservation and check educate the consumers for water conservation and check all possible leakages in side the property. It was observed all possible leakages in side the property. It was observed that there were leakages from the under ground water that there were leakages from the under ground water storage tanks.storage tanks.

The results of pilot study are encouraging, in general the The results of pilot study are encouraging, in general the water demand has been slightly higher than intermittent water demand has been slightly higher than intermittent supply.supply.

Leakage levels has come down both in the distribution Leakage levels has come down both in the distribution system and at the consumer end.system and at the consumer end.

It is proposed to extent the coverage in the adjoining It is proposed to extent the coverage in the adjoining areas.areas.

It has been proposed to start the project in other It has been proposed to start the project in other distribution centers such as Kanwar Nagar, Jawahar distribution centers such as Kanwar Nagar, Jawahar Nagar, Nehru Nagar etc.Nagar, Nehru Nagar etc.

Page 19: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Improvement of existing Improvement of existing distribution centersdistribution centers

Bas badanpura:- Sanction for laying of pipeline Bas badanpura:- Sanction for laying of pipeline and rehabiliation of CWR at Laxman Doongri and rehabiliation of CWR at Laxman Doongri and RWR at Intermediate pumping station for and RWR at Intermediate pumping station for Rs 171.70 lacs was issued by Finance Rs 171.70 lacs was issued by Finance Committee in its 607 Committee in its 607 th th meeting held on meeting held on 12.11.2010. Pipes has been received. The work 12.11.2010. Pipes has been received. The work of laying of pipe lines has been started.of laying of pipe lines has been started.

Shastri Nagar:- Sanction for laying of pipeline, Shastri Nagar:- Sanction for laying of pipeline, construction of tubewells, construction of construction of tubewells, construction of Service Reservoir and Clear Water Reservoir Service Reservoir and Clear Water Reservoir along with pumping machinery was accorded by along with pumping machinery was accorded by Finance Committee in its 607 Finance Committee in its 607 th th meeting held on meeting held on 12.11.2010. Work order has been placed and is 12.11.2010. Work order has been placed and is likely to start by I week of April.likely to start by I week of April.

Page 20: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Assessment of water Assessment of water Metering is an important tool for water Metering is an important tool for water

management. Thing which is not measured is not management. Thing which is not measured is not managed.managed.

There are 327704 metered connections in Jaipur There are 327704 metered connections in Jaipur Water Supply Scheme.Water Supply Scheme.

In general about 60 % meters are functional. In general about 60 % meters are functional. Replacement of water meters is not been done Replacement of water meters is not been done due to shortage of staff, low meter repair rate. due to shortage of staff, low meter repair rate. During the current financial year 31000 During the current financial year 31000 consumer meters has been replaced.consumer meters has been replaced.

To over come above situation it is proposed to To over come above situation it is proposed to out source the work of installation of water out source the work of installation of water meters for 7 years including O&M. Tenders for Rs meters for 7 years including O&M. Tenders for Rs 700 lacs has been invited.700 lacs has been invited.

Page 21: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Water Assessment Contd…Water Assessment Contd…

In addition to this out of 1897 tube wells In addition to this out of 1897 tube wells bulk water meters are provided on 1276 bulk water meters are provided on 1276 tube wells.tube wells.

Water inflow to CWR from tube wells is Water inflow to CWR from tube wells is also measured by Bulk Water meters also measured by Bulk Water meters installed under Bisalpur Project and installed under Bisalpur Project and monitored by SCADA.monitored by SCADA.

It is also proposed to install bulk water It is also proposed to install bulk water meters on all inflows to CWRs.meters on all inflows to CWRs.

Bulk Meters are also proposed to install at Bulk Meters are also proposed to install at distribution centers for measurement of distribution centers for measurement of supply qty.supply qty.

Page 22: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Present Scenario of Ground WaterPresent Scenario of Ground Water As per design 418 mld water was to be supplied from As per design 418 mld water was to be supplied from

Bisalpur Project and 100 mld water from tube wells, Bisalpur Project and 100 mld water from tube wells, where as the present situation is almost reverse. This has where as the present situation is almost reverse. This has put immense pressure on ground water.put immense pressure on ground water.

Increased rate of tube well failure due to drop in water Increased rate of tube well failure due to drop in water table.table.

Reduced yield of new tube wells being constructed in Reduced yield of new tube wells being constructed in recent years.recent years.

In addition to tube wells drilled by department for In addition to tube wells drilled by department for drinking water there are large number of tube wells drinking water there are large number of tube wells drilled by private owners, using water indiscriminately.drilled by private owners, using water indiscriminately.

As per studies there is an over drawl of more than 600% As per studies there is an over drawl of more than 600% of ground water in Jaipur City.of ground water in Jaipur City.

Areas such as Jhotwara, Murlipura, Jagatpura, Malviya Areas such as Jhotwara, Murlipura, Jagatpura, Malviya Nagar, part of Mansarovar, Bapu Nagar, C Scheme, Nagar, part of Mansarovar, Bapu Nagar, C Scheme, Jawahar Nagar etc are almost dry. Jawahar Nagar etc are almost dry.

Page 23: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Remedial MeasuresRemedial Measures Rain water harvesting structures should be made Rain water harvesting structures should be made

mandatory for all houses, existing as wells as new. mandatory for all houses, existing as wells as new. Presently, it is mandatory for houses with more than 300 Presently, it is mandatory for houses with more than 300 sqm.sqm.

Roof top artificial recharge structure should be Roof top artificial recharge structure should be constructed in all govt. buildings and private properties.constructed in all govt. buildings and private properties.

There are three big industrial areas in town, VKIA, There are three big industrial areas in town, VKIA, Jhotwara and Sitapura, there are big plots with huge open Jhotwara and Sitapura, there are big plots with huge open areas. The industrialist should be persuaded to construct areas. The industrialist should be persuaded to construct rain water harvesting structures and artificial recharge rain water harvesting structures and artificial recharge structures for recharging the aquifer.structures for recharging the aquifer.

Artificial recharge structures should be constructed at Artificial recharge structures should be constructed at road side depressions where water is accumulated for road side depressions where water is accumulated for small duration during rainy season.small duration during rainy season.

To initiate the process, department has decided to To initiate the process, department has decided to construct 100 artificial recharge structures on abandoned construct 100 artificial recharge structures on abandoned tube wells before on coming rainy season.tube wells before on coming rainy season.

Page 24: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

ProblemsProblems

Illegal connections.Illegal connections. Long distance connections.Long distance connections. Equitable distribution of water in Equitable distribution of water in

distribution zonesdistribution zones Increasing demand, reduced availability of Increasing demand, reduced availability of

waterwater Low pressure, short supply and tail end Low pressure, short supply and tail end

problemsproblems Pollution problems in drinking waterPollution problems in drinking water Choking and over flowing of sewers, seepage Choking and over flowing of sewers, seepage

from manhole chambersfrom manhole chambers

Page 25: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

ProblemsProblems

Depleting ground water resources and poor Depleting ground water resources and poor storage of water in Bisalpur Dam.storage of water in Bisalpur Dam.

Increasing multi story buildings in developed Increasing multi story buildings in developed areasareas

Water supply to areas developed by colonisers Water supply to areas developed by colonisers in outer areas of city.in outer areas of city.

Water supply to unconnected areas Water supply to unconnected areas Tanker transportationTanker transportation Extensive use of online boosters during water Extensive use of online boosters during water

supply hours. supply hours. Energy efficiency of the systemEnergy efficiency of the system

Page 26: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Departments planning for water Departments planning for water managementmanagement

Recently department has started the work of Water Recently department has started the work of Water Audit, under which accounting of entire quantity of Audit, under which accounting of entire quantity of water right from source to consumer end shall be water right from source to consumer end shall be done. This will help in reduction of water loss.done. This will help in reduction of water loss.

To achieve equitable distribution of water to To achieve equitable distribution of water to consumers department has initiated the work of consumers department has initiated the work of installation of orifice flow equaliser.installation of orifice flow equaliser.

For monitoring daily water supply bulk meters are For monitoring daily water supply bulk meters are installed on nearly two third tube wells. Bulk installed on nearly two third tube wells. Bulk meters are provided at the inlet of CWR under meters are provided at the inlet of CWR under Bisalpur Project to measure water transferred from Bisalpur Project to measure water transferred from the Dam to distribution system. This is being the Dam to distribution system. This is being monitored under central SCADA system.monitored under central SCADA system.

It is further planned to provide bulk meters on all It is further planned to provide bulk meters on all tube wells and out lets on all head works. tube wells and out lets on all head works.

Page 27: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Departments planning for water Departments planning for water managementmanagement

For improvement of system following works are For improvement of system following works are sanctioned:sanctioned:

Replacement of old inefficient pumping Replacement of old inefficient pumping machinery of pump housesmachinery of pump houses

Replacement of old inefficient submersible Replacement of old inefficient submersible pumping sets of tube wells work has been pumping sets of tube wells work has been started in Malviya Nagar and Jagatpura.started in Malviya Nagar and Jagatpura.

Replacement of these leaky valves of pump Replacement of these leaky valves of pump houses and Service Reservoirs by soft seated houses and Service Reservoirs by soft seated valves and butterfly valves. valves and butterfly valves.

Installation of electro chlorinator at 28 pumping Installation of electro chlorinator at 28 pumping stations of Jaipur city on BOOT is under process. stations of Jaipur city on BOOT is under process.

Commissioning of Kanwar Nagar Water Supply Commissioning of Kanwar Nagar Water Supply Scheme is under progress, the work is likely to Scheme is under progress, the work is likely to be completed by mid of April 2011.be completed by mid of April 2011.

Page 28: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Ongoing and proposed worksOngoing and proposed works Work of laying 600 mm pipeline in Ghat Bazar is Work of laying 600 mm pipeline in Ghat Bazar is

complete, testing of pipeline is under progress. This complete, testing of pipeline is under progress. This pipe line shall improve pressures in Choukri Ghat, pipe line shall improve pressures in Choukri Ghat, Ramchanderji, Top Khanna Hazauri, Modi Khanna, Ramchanderji, Top Khanna Hazauri, Modi Khanna, Vishwarji.Vishwarji.

The Service Reservoir at Malviya Nagar Sec 2 has The Service Reservoir at Malviya Nagar Sec 2 has been commissioned , this has improved water supply been commissioned , this has improved water supply in the area.in the area.

Pipe line in Top Khanna Desh has been Pipe line in Top Khanna Desh has been commissioned, tail end pressures has been increased commissioned, tail end pressures has been increased by 3m.by 3m.

The work of interconnections of pipeline is under The work of interconnections of pipeline is under progress in Gangapole area. progress in Gangapole area.

The work of developing new distribution zone of Kho The work of developing new distribution zone of Kho Nagorian already sanctioned under Bisalpur Project Nagorian already sanctioned under Bisalpur Project is under consideration for taking up under state plan.is under consideration for taking up under state plan.

Page 29: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Ongoing and proposed worksOngoing and proposed works Overall water supply in Malviya Nagar Sec 9 Overall water supply in Malviya Nagar Sec 9

distribution zone has been improved.distribution zone has been improved. The overall scenario of water supply of Jaipur City was The overall scenario of water supply of Jaipur City was

reviewed by the Addl. Chief Engineer, 85 works for reviewed by the Addl. Chief Engineer, 85 works for improvement of water supply were identified of improvement of water supply were identified of estimated cost Rs 59 crores. These works shall be estimated cost Rs 59 crores. These works shall be executed during financial year 2011-12 after getting executed during financial year 2011-12 after getting necessary sanctions.necessary sanctions.

To mitigate problem of water pollution in walled city, To mitigate problem of water pollution in walled city, pipe lines identified as pollution prone has been pipe lines identified as pollution prone has been replaced. It is further planned to execute the work of replaced. It is further planned to execute the work of replacement of remaining pipe lines in Ghat Choukri, replacement of remaining pipe lines in Ghat Choukri, Choukri Ramchander ji, Top Khanna Desh and Top Choukri Ramchander ji, Top Khanna Desh and Top Khanna Hazauri including consumer service Khanna Hazauri including consumer service connections.connections.

Page 30: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

Interventions requiredInterventions required

Increased allocation of water from Bisalpur Project Increased allocation of water from Bisalpur Project 124 tube wells has been identified yielding very low 124 tube wells has been identified yielding very low

discharge or gone dry. Proposals has been submitted discharge or gone dry. Proposals has been submitted for A & F sanction.for A & F sanction.

Sanction for water transportation.Sanction for water transportation. There 4 Executive Engineers, 24 Assistant Engineers There 4 Executive Engineers, 24 Assistant Engineers

and 51 Junior Engineers under city circle Jaipur. There and 51 Junior Engineers under city circle Jaipur. There are only 7 vehicles to provide vehicular support to are only 7 vehicles to provide vehicular support to these officers. There are no sanctions of vehicles for these officers. There are no sanctions of vehicles for urban water supply schemes. Necessary sanctions may urban water supply schemes. Necessary sanctions may be accorded for sanction of 23 vehicles along with be accorded for sanction of 23 vehicles along with revised monthly rent of Rs 20000.00 against Rs revised monthly rent of Rs 20000.00 against Rs 13500.00 sanctioned by finance deptt. As vehicles are 13500.00 sanctioned by finance deptt. As vehicles are not available at these rated considering the present not available at these rated considering the present POL rates.POL rates.

Page 31: Drinking Water Management of Jaipur City Presented by Dinesh Sharma Superintending Engineer, City Circle

ThanksThanks