drillingfluid-111127063103-phpapp01

22
DRILLING FLUIDS The key to making the rotary drilling system work is the ability to circulate a fluid continuously down through the drill pipe, out through the bit nozzles and back to the surface. The drilling fluid can be air, foam (a combination of air and liquid or a liquid. Liquid drilling fluids are commonly called drilling mud. All drilling fluids, especially drilling mud, can have a wide range of chemical and physical properties. These properties are specifically designed for drilling conditions and the special problems that must be handled in drilling a well. 1

Upload: benjamin-hagan

Post on 18-May-2017

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: drillingfluid-111127063103-phpapp01

DRILLING FLUIDS

The key to making the rotary drilling system work is the ability to circulate a fluid continuously down through the drill pipe, out through the bit nozzles and back to the surface.

The drilling fluid can be air, foam (a combination of air and liquid or a liquid.

Liquid drilling fluids are commonly called drilling mud.

All drilling fluids, especially drilling mud, can have a wide range of chemical and physical properties. These properties are specifically designed for drilling conditions and the special problems that must be handled in drilling a well.

Purpose of Drilling Fluids

1

Page 2: drillingfluid-111127063103-phpapp01

1. Cooling and lubrication. As the bit drills into the rock formation, the friction caused by the rotating bit against the rock generate heat. The heat is dissipated by the circulating drilling fluid. The fluid also lubricates the bit.

2. Cuttings removal. An important function of the drilling fluid is to carry rock cuttings removed by the bit to the surface. The drilling flows through treating equipment where the cuttings are removed and the clean fluid is again pumped down through the drill pipe string.

3. Suspend cuttings. There are times when circulation has to be stopped. The drilling fluid must have that gelling characteristics that will prevent drill cuttings from settling down at the bit. This may caused the drill pipe to be stuck.

4. Pressure control. The drilling mud can be the first line of defense against a blowout or

2

Page 3: drillingfluid-111127063103-phpapp01

loss of well control caused by formation pressures.

The hydrostatic head produced by the mud in psi is = 0.052 x G x H

where G = density of mud in ppgH = depth of the hole in feet.

This hydrostatic head will counter the formation pressure in order to avoid a blowout while drilling.

For example, Lets say a well is being drilled in a salt-water basin (pressure gradient of 0.465 psi/ft), the pressure in the formation at 10,000 feet would be expected to be:

10,000 x 0.465 = 4,650 psi

The weight of mud required to counter this pressure is calculated as follows.

P = 0.052GH4,650 = 0.052 x G x 10,000G = 8.94 ppg

5. Data source . The cuttings that the drilling mud brings to the surface can tell the geologist the type of formation being drilled.

3

Page 4: drillingfluid-111127063103-phpapp01

6. To wall the hole with impermeable filter cake. This will give a temporary support to the wall of the borehole from collapsing during drilling.

Drilling fluid can solve problems

Many drilling problems are due to conditions or situations that occur after drilling begins and for which the drilling fluid was not designed.

Some of these problems can be solved by adding materials to the drilling fluid to adjust its properties.

Other cases, it may be necessary to replace the drilling fluid being used with another fluid system.

The most common changes is the mud weight or density. Weighting material is added when high-pressure formations are expected.

Some of the problems are:

4

Page 5: drillingfluid-111127063103-phpapp01

1. Lost circulation

Lost circulation can occur in several types of formations, including high permeable formations, fractured formations and cavernous zones.

Lost circulation materials can be added to the mud to bridge or deposit a mat where the drilling fluid being lost to the formation. These materials include cane and wood fibres, cellophane flakes and even padi husks were used in oil drilling in Sumatra.

2. Stuck pipe

Stuck pipe can occur after drilling has been halted for a rig breakdown, while running a directional survey or when conducting other nondrilling operation.

The drill pipe may stick to the wall of the hole due to the formation of filter cake or a layer of

5

Page 6: drillingfluid-111127063103-phpapp01

wet mud solids on the wall of the hole in the formation.

3. Heaving or sloughing hole

This occurs when shales enter the well bore after the section has been penetrated by the bit. To solve this problem, drilling is suspended the hole is conditioned (by letting the mud in circulation for a period of time)

Types of drilling fluids

1. Water-base mudThis fluid is the mud in which water is the continuous phase. This is the most common drilling mud used in oil drilling.

2. Oil-based mudThis drilling mud is made up of oil as the continuous phase. Diesel oil is widely used to provide the oil phase. This type of mud is commonly used in swelling shale formation.

6

Page 7: drillingfluid-111127063103-phpapp01

With water-based mud the shale will absorb the water and it swells that may cause stuck pipe.

3. Air and foamThere are drilling conditions under which a liquid drilling fluid is not eh most desirable circulating medium. Air or foam is used in drilling some wells when these special conditions exist.

Mud Properties

1. Mud density or mud weight

Mud weight is measured by means of a mud balance. The weight of water is 8.33 ppg. The mud weight can be increased by adding barite (barium sulphate). Barite has a specific gravity of between 4.2 – 4.3.

Other materials can be used to increase mud weight such as ilmenite (S.G of 4.58)

2. Mud viscosity

7

Page 8: drillingfluid-111127063103-phpapp01

Mud viscosity is difficult to measure but in the field the Marsh funnel and the Fann V-G meter is commonly used.

The Marsh Funnel is filled with mud, the operator then notes the time, removes his finger from the discharge and measures the time for one quart (946 cm3) to flow out. Marsh funnels are manufactured to precise dimensional standards and may be calibrated with water which has a funnel viscosity of 26 0.5 sec.

In using Fann V-G (Viscosity-gel) meter, readings are taken at 600 rpm and 300 rpm.

The viscosities are defined as follows:

p = 600 - 300

aF = ½ 600

Yb = 300 - p

Where p = plastic viscosity, cpaF = apparent viscosity, cpYb = Bingham yield point, lb/100

ft2

8

Page 9: drillingfluid-111127063103-phpapp01

= Torque readings from instrument dial at 600 and 300 rpm.

From these relationships:Yb = 2(aF - p)aF = p + ½ Yb

True yield point: Yt = ¾ Yb

Yield point is influenced by the concentration of solids, their electrical charge, and other factors. If not at the proper value, it can also reduce drilling efficiency by cutting penetration rate, increasing circulating pressure, and posing the danger of lost circulation.

3. Gel strength

The gel strength of a mud is a measure of the shearing stress necessary to initiate a finite rate of shear.

With proper gel strength can help suspend solids in the hole and allow them to settle out on the

9

Page 10: drillingfluid-111127063103-phpapp01

surface, excessive gel strength can cause a number drilling problems.

4. Filtration

The filtration, water loss or wall building test is conducted with a filter press.

The rate at which filtrate will invade permeable zone and the thickness of the filter cake that will be deposited on the wall of the hole as filtration takes place are important keys to trouble-free drilling

Drilling Fluid treating and monitoring equipment

In addition to the main mud pumps, several items of mud treating equipment are found on most rigs. Much of this equipment is aimed at solids removal, including shale shakers, desanders, desilters and centrifuges.

Shale shakers remove larger particles from the mud stream as it returns from the bottom of the

10

Page 11: drillingfluid-111127063103-phpapp01

hole. Shakers are equipped with screens of various sizes, depending on the type of solids to be removed.

Finer particles in the mud stream are removed with desanders, desilters and centrifuges. Each of these items of solids-control equipment is applicable only over a certain range of particle sizes.

In addition to removing solids, mud handling equipment may also include a mud degasser to remove entrained gas from the mud stream. Degassing the drilling fluid is sometimes necessary when small volumes of gas flow into the well bore during drilling.

Additional equipment include mixers to agitate mud in the tanks, smaller pumps to various duties and equipment for adding chemicals and solid materials to the mud system.

11

Page 12: drillingfluid-111127063103-phpapp01

Drilling hazards

The following are some of the most common hazards in drilling and can be overcome by proper control of the mud properties.

1. Salt section hole enlargement

Salt section can be eroded by the drilling fluid and causes hole enlargement. These enlargement will require larger mud volume to fill the system and in case of casing the hole, larger cement volume is required. To avoid these problems a salt saturated mud system is prepared prior to drilling the salt bed.

2. Heaving shale problems

Areas with shale sections containing bentonite or other hydratable clays will continually absorb water, swell and slough into the hole.

12

Page 13: drillingfluid-111127063103-phpapp01

Such beds are referred to as heaving shales and constitute a severe drilling hazard when encountered.

Pipe sticking, excessive solid buildup in the mud and hole bridging are typical problems.

Various treatments of the mud are sometimes successful, such as

Changing mud system to high calcium content by adding lime, gypsum etc which reduces the tendency of the mud to hydrate water sensitive clays.

Increasing circulation rate for more rapid removal of particles.

Increasing mud density for greater wall support

Decreasing water loss mud Changing to oil emulsion mud Changing to oil-based mud.

3. Blowouts

13

Page 14: drillingfluid-111127063103-phpapp01

Blowout is the most spectacular, expensive and highly feared hazard of drilling.

This occurs when encountered formation pressure exceed the mud column pressure which allows the formation fluids to blow out of the hole.

Mud density or the mud weight is the principal factor in controlling this hazard.

In drilling a blow out preventer (BOP) stack is always attached at the top of the conductor pipe. In case of a gas kick (a sign that may lead to a blow out) the BOP stack can close the annular space between the drilling pipe and the conductor pipe or casing or shut the whole hole (with a blind ram of the BOP).

4. Lost Circulation

Lost circulation means the loss of substantial amount of drilling mud to an encountered formation.

14

Page 15: drillingfluid-111127063103-phpapp01

Lost circulation materials are commonly circulated in the mud system both as a cure and a continuous preventive.

These materials are the fibrous materials such as the hay, sawdust or padi husk and lamellated (flat and platy) materials such as mica, cellophane.

Drilling Mud Calculations

The most common mud engineering calculations are those concerned with the changes of mud volume and density caused by the addition of various solids or liquids to the system.

The first step is to compute the system volume, which is the sum of the mud in the hole and surface pits.

Consider then the volume and density change of a mud (or water) resulting from the addition of solids.Two basic assumptions must be made:

15

Page 16: drillingfluid-111127063103-phpapp01

1. The volumes of each material are additive.2. The weights of each material are additive.

Expressions for these assumptions:Vs + Vm1 = Vm2

sVs + m1Vm1 = m2Vm2

where Vs = volume of solidVm1 = volume of initial mudVm2 = final volume of mixtures = density of solidm1 = density of initial mudm2 = density of final mud

Solving for Vs :

sVs + m1Vm1 = m2Vm2

sVs = m2Vm2 m1Vm1

= m2Vm2 m1(Vm2 Vs)sVs m1Vs = m2Vm2 m1Vm2

Vs(s m1) = Vm2(m2 m1)

As to units, the densities may be in any consistent set.

The corresponding weight to add is

16

Page 17: drillingfluid-111127063103-phpapp01

Example:A 9.5 lb/gal mud contains clay (S.G.=2.5) and fresh water. Compute (a) the volume % and (b) the weight % clay in this.

Solution:(a) From the equation

17