drilling innovations and advanced technologies

23
1 INGEOS.RU DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES JSC Investgeoservis 10a, 60-letiya Oktyabrya ave., Moscow Tel.: +7 ( 499 ) 750 01 13 www.ingeos.ru GROUP OF COMPANIES

Upload: others

Post on 04-Nov-2021

19 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

1INGEOS.RU

DRILLING INNOVATIONS ANDADVANCED TECHNOLOGIES

JSC Investgeoservis

10a, 60-letiya Oktyabrya ave., Moscow

Tel.: +7 ( 499 ) 750 01 13

www.ingeos.ru

GROUP OFCOMPANIES

Page 2: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES2 3INGEOS.RU

ИННОВАЦИИ И ПЕРЕДОВЫЕ ТЕХНОЛОГИИ В БУРЕНИИ2

"FROM QUALITYPREPARATION TOSUCCESSFUL DRILLING

Page 3: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES4 5INGEOS.RU

About Company Investgeoservis Group Structure Project Management Structure Equipment HSE Our Geography Operations Support Bases Our ProjectsClients Contacts

06 08 09 10 12 14 15 16 40 41

TABLE OF CONTENT

GROUP OFCOMPANIES

Page 4: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES6 7INGEOS.RU

1. Borehole casing /cementing 2. Drilling mud mixing and related support services 3. Well putting on stream and production testing

Management of onshore and offshore well construction. The scope of project management services is individually tailored based on the Client's requirements. Project management services include, without limitation: participation in project documentation development, management and control of all types of well activities and processes, cost control and optimization, engineering, technology, supervising, logistics, procurement, HSE consulting.

EPC (“turnkey Projects”)

Separate Service

INVESTGEOSERVICEGroup of Companies performs a full cycle of construction of oil and gas wells of any complexity, design and purpose (appraisal, exploration, production), including extended-reach wells (hereinafter – ERD), and multilateral wells in accordance with the Client's requirements.

CORE BUSINESS

PROJECT MANAGEMENT

DAILY RATE DRILLING

TECHNOLOGICAL SUPPORT OF DRILLING

ABOUT COMPANY

The scope includes design documentation development, construction of access roads and drilling/cluster pads, rigging operations, drilling, service support of drilling, well suspension/abandonment, land reclamation and hand-over to supervisory authorities.

Provision of drilling crews and/or drilling rigs of various capacities, including rigging operations.

2

3

4

1

6 7DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 5: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES8 9INGEOS.RU

INVESTGEOSERVIS GROUP STRUCTURE PROJECT MANAGEMENT STRUCTURE

JSC INVESTGEOSERVISWell Construction Contractor

CLIENT (Office)

PROJECT COORDINATOR

IGS PROJECT MANAGER

DRILLING SITE CONTRACTOR (Office)

IGS MOBILEDRILLINGDrilling with mobile rigs

IGS-TECHNOLOGYEngineering

support of drilling

IGS-AUTOProvision

of vehiclesand special equipment

Day-to-day clientaccount management

/ reporting

FacilityManager / Supervisor

Project Manager atdrilling site

Logistics Manager

Turnover and warehouse

management

Geologist

Control of geological

parameters

HSE

HSE compliance

control

Legal Counsel

Legal support of contracts with clients

Economist

Project cost control

Chief Engineer

Technical support

of the project

Engineering Group

24/7 engineering

support

Process

Control of drilling

technology

IGS-NEUDeep oil and gas

well drilling

Page 6: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES10 11INGEOS.RU

DRILLING RIG CAPACITY, T DRAWWORKS CAPACITY, HP MUD PUMPS TDS SERIAL NUMBER

10000-600 EK 600 2500 2 Х UNBT-1180L TESCO 750-HSI 18-00026500-450 ECHRKBM 450 2500 3 X UNBT-1180L TESCO 500-ESI-1350 147316500-450 ECHRKBM 450 2500 1 X UNBT, 2 Х 1600F VARCO TDS-11SA 147326000-400 EKBMCH 400 2000 2 Х UNBT-1180L TESCO 500-ESI-1350 147276000-400 EKBMCH 400 2000 2 Х UNBT-1180L TESCO 500-ESI-1350 147286000-400 EKBMCH 400 2000 2 Х UNBT-1180L TESCO 500-ESI-1350 147296000-400 EKBMCH 400 2000 2 Х UNBT-1180L TESCO 750-ESI-1205 147596000-400 D POLYARIS 400 1500 F1600 DQ 500Z 35000-320 EKBMCH 320 1500 2 Х UNBT-1180L TESCO 500-ESI-1350 148955000-320 EKBMCH 320 1500 2 Х UNBT-1180L TESCO 500-ESI-1350 14907ZJ-50DBS 315 1500 2 Х 3NB-1600F TDS 11 SA15R573 2007-52FZJ-50DBS 315 1500 2 Х 3NB-1600F TDS-9SJ25P87 2007-63FZJ-50DBS 315 1500 2 Х 3NB-1600F TDS11 5J08P525 2007-75FZJ-50DBS 315 1500 2 Х 3NB-1600F TDS 9 SB1 6 R111 2007-82FZJ-50DBS 315 1500 2 Х 3NB-1600F TDS 9 SB1 6 R111 2008-054FZJ-50DBS 315 1500 2 Х 3NB-1600F TDS 9 SB1 6 R111 2008-003FZJ-50DBS 315 1500 2 Х 3NB-1600F TDS 9 SB1 6 R111 2008-051F4500-270 EKBM 270 1500 2 Х UNBT-1180L TESCO 750 HCI(S)1205 14637МБУ-280 MEDVED 280 1200 2 Х 3NB-1600F TESCO 250EMI-450 1ZJ-40Т 225 1000 2 Х RGF-1600F TESCO 250EMI 400 RG11081ZJ-40Т 225 1000 2 Х 3NB-1600F - 2011-029EZJ-40Т 225 1000 2 Х 3NB-1600F TESCO 250EMI 450 2011-032EZJ-40Т 225 1000 2 Х 3NB-1600F TESCO 250EMI 450 2011-033EМБУ-125 125 470 - - 31TZJ-20 RG 158 615 8Т-650 - 045MBU-140 IDEL 140 600 8Т-650 - 002MBU-140 KUNGUR 140 600 NBT-600 - 56MBK-140 140 450 UNBT 950 - 0253000EUK 225 1000 2 Х UNB-600 DQ-50LHTY4-JQ 126983000EUK 225 1000 2 Х UNB-600 DQ-50LHTY4-JQ 151103D-76 320 1200 2 Х 3NB-1600F - 2833D-76 320 1200 2 Х UNB-600 - 13

EQU

IPM

ENT

Page 7: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES12 13INGEOS.RU

HSE

In 2014, our drilling crews have undergone training in well control as per International Well Control Forum Standard.

During work on projects we use Personal Protective Equipment manufactured by world leading PPE companies.

INVESTGEOSERVIS GROUP has the necessary certificates to carry out its activities.

ISO 9001:2015 ISO 14001:2015 ISO 45001:2018 IADC Certificate Association of Drilling Contractors Certificate Euro Standard Certificate of Conformity

INVESTGEOSERVIS GROUP OF COMPANIES IS AN ENVIRONMENTALLY

ORIENTED COMPANY, WHOSE IMAGE IS BASED ON THE TRUST OF

CUSTOMERS, PARTNERS, CLIENTS AND POPULATION IN THE REGIONS OF

OUR OPERATIONS.

12 13DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 8: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES14 15INGEOS.RU

OUR GEOGRAPHY OPERATIONS SUPPORT BASE

MOSCOW, 1 962 sq.m.• HQ

INVESTGEOSERVIS GROUP

TARKO-SALE, 25 413 sq.m.• Administration Building• Repair Shop• (BOP shop, drilling equipment, drill

pipes)• Repair Shop (for electric equipment)• Road Transport Shops 1-2• Warehouses• Outdoor Storage Area• Hangars• Living Quarters

KOMI REPUBLIC,, 18 000 sq.m.• Administration Building• Warehouses• Repair Shops

TARKO-SALE• Central Operations Support Base• Maintenance & Repair Shops• Warehouses

OPERATIONS SUPPORT

SABETTA, 31 799 sq.m. • Administration Building• Repair Shop• (BOP shop, drilling equipment, drill

pipes )

NOVY URENGOY, 31 851 sq.m.• Warehouses 1-5• Heated parking for vehicles and

equipment• Hangars• Living Quarters

GYDAN PENINSULA

NOVY URENGOY

YAMAL PENINSULA

15

MOSCOW

YAMA

NENETS

KOMI REPUBLICGYDA N PENINSULA

YAMAL PENIN SULA

INGEOS.RU

Page 9: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES16 17INGEOS.RU

OUR PROJECTS

16

YAMAL LNGLong-term contract until 2021: over 150 production wells.

Unique drilling rigs 6000/400 EK-BMCh ARKTIKA (2000 HP) are used.

Proprietary technology developed jointly with Uralmash NGO Holding LLC.

Continuous and fully self-reliant operations in arctic conditions at temperatures to -600C with wind speed of 20 m/s.

Complex logistics of cargo delivery by different types of transport - road, rail, water, with 25,000 tons of cargo delivered annually.

over 150 production wells Ph

oto:

Sou

th-T

ambe

y Fi

eld

/ 600

0/40

0 EK

-BM

Ch

ARKT

IKA

Rig

INGEOS.RU17 17DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 10: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES18 19INGEOS.RU

ARCTIC LNG 2GYDAN PENINSULA

Long-term contract for EPC of 60 production wells, effective till 2025.

Fully self-reliant operations in arctic conditions at temperatures to -60°C with wind speed of 20 m/s.

Complex logistics of cargo delivery by different types of transport - road, rail, water.

Application of past experience of well construction project management in execution of the similar Yamal LNG project.

OUR PROJECTS

Phot

o: U

trenn

eye

(Sal

man

ovsk

oye)

Fie

ld /

6000

/400

EK-

BMC

h AR

KTIK

A Ri

g

over 60 production wells

18 19DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 11: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES20 21INGEOS.RU

OBSKY LNGYAMAL PENINSULA

Long-term contract for EPC of 57 exploration and production wells, effective till 2024.

Fully self-reliant operations in arctic conditions at temperatures to -60°C with wind speed of 20 m/s.

Complex logistics of cargo delivery by different types of transport - rail, water, winter roads.

Application of past experience of well construction project management in execution of the similar Yamal LNG project.

over 57 production wells

OUR PROJECTS

Phot

o: W

est-

Seya

khin

skoy

e Fi

eld

/ 600

0/40

0 EK

-BM

Ch

ARKT

IKA

Rig

20 21DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 12: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES22 23INGEOS.RU

NOVATEK-YURKHAROVNEFTEGAZIn 2011-2014, seven ultradeep wells were successfully drilled in the YNAO with MD ranging from 6,500 to 8,500 meters.

The most extended ERD well in mainland Russia: 8,497 m long with 7,059 m reach.

Before ERD, a pre-drilling geomechanical model with wellbore stability calculations was made and regularly updated while drilling in real time thus facilitating risk minimization in harsh geological conditions, reduction of process time, and successful well completion.

The following technologies were used in construction:• Latest generation rotary steerable

systems• LWD• Real-time geomechanical monitoring• Casing running with constant

rotation and circulation• Hydraulic reaming shoe for the

casing• Hydrocarbon mud lubricant• Casing centralizer to reduce friction

coefficient• Equipment enabling the rotation of

the conveying string independently from the liner

MD 8,5 km

OUR PROJECTS

Pho

to: Y

urkh

arov

skoy

e Fi

eld

/ 10

000/

600

EK

22 23DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 13: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES24 25INGEOS.RU

2-FOLD REDUCTION OF CONSTRUCTION TIME

Project implementation since 2009.

2-fold reduction of well construction time achieved in three years

270-320 ton (1500 HP) drilling rigs (echelon type)

15 wells per year with horizontal toe of 800 - 1300 meters Wells with complicated trajectories and large doglegs The following high end services were used:

• Round-the-clock well construction management from the engineering center• Geosteering• Rotary steerable systems• Boundary mapper• Neutron density logging• Using oil-base mud

24

NOVATEK-TARKOSALENEFTEGAZ

OUR PROJECTS

Phot

o: E

ast-T

arko

salin

skoy

e Fi

eld

/ 500

0/32

0 EK

BMC

h Ri

g

25DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 14: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES26 27INGEOS.RU

ARKTIKGAZFIRST SUBHORIZONTAL WELL IN THE ACHIMOV DEPOSITS

Project implementation since 2012.

In 2013, the first subhorizontal well in the Achimov deposits was successfully constructed, and in 2017, the well with measured depth of over 5,900 meters and a 1,400 m horizontal toe was completed.

Drilling rigs with the capacity of up to 320 tons were used in the project.

Use of OBM (both oil- and diesel-based).

Drilling wells with anomaly ratio of 2.1.

Sonic logging while drilling

26 27

OUR PROJECTS

Phot

o: U

reng

oy F

ield

/ ZJ

-50

DBS

Rig

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 15: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES28 29INGEOS.RU

GAZPROM

28 29

OUR PROJECTS

Pho

to: M

edve

zhye

Fie

ld /

6500

/450

EC

hRKB

M

EXPLORATION WELL CONSTRUCTION

Contracts for the construction of exploration and appraisal well in the Medvezhye Field and Padinskaya area in Yamalo-Nenetsk Autonomous Okrug.

Well construction: 2021-2022

Drilling rigs with the capacity of up to 450 tons were used in the project.

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 16: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES30 31INGEOS.RU

GAZPROM NEFTPRODUCTION AND EXPLORATION WELL CONSTRUCTION

GAZPROMNEFT- YAMAL Engagement in a production well construction project at the Tazovskoye Field during 2017-2019. Construction of wells with measured depth of over 5,000 m in 28.6 days. Record breaking well construction rate was achieved – 1,000 meters in 5.46 days. The longest horizontal section in the perimeter of Gazpromneft companies has been drilled, reaching 2070 m. The wells had the highest level of complexity, i.e. level IV: The Directional Difficulty Index (DDI) made 7.04.

GAZPROMNEFT - GEO EPC contract for the construction of exploration wells at the Leskinskoye license block during 2019-2022. Vertical exploration wells up to 4500 m A drilling rig with the capacity of 400 t was used for project implementation.

30 31

OUR PROJECTS

Pho

to: T

azov

skoy

e Fi

eld

/ 650

0/45

0 EC

hRKB

M

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 17: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES32 33INGEOS.RU

GAZPROMNEFT - SAKHALINOFFSHORE OPERATIONS

Consultancy support of the client in the field of contracting.

Qualified personnel certified to BOSIET, IWCF, H2S standards. Audit of a leased jackup rig in Tunisia, including equipment, systems and personnel qualification.

Organization of a tender for the selection of various service providers.

Development of drilling programs.

Assessment and selection of equipment and material providers.

Round-the-clock control of well drilling operations in line with the drilling program.

Cost engineering Drill engineering

32

OUR PROJECTS

33

Phot

o: D

olgi

nsko

ye F

ield

/ Sa

turn

Jac

kup

Rig

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 18: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES34 35INGEOS.RU

SLAVNEFT-KRASNOYARSKNEFTEGAZ

DRILLING IN NO RETURNS CONDITIONS

Engagement in a project at the Kyumbinskoye Field in Krasnodar Territory during 2014-2020.

Drilling rigs with the capacity of up to 400 tons were used in the project.

Drilling gear was mobilized within shortest possible time at the distance of 4,500 km in absence of good roads and with complicated logistics.

Drilling of a conductor section using an in-house technology of air blowing.

A well with a design MD of 3723 m and a horizontal toe has been drilled 12% faster compared to competitors.

4 500 КМ

10 000 ТН

34

OUR PROJECTS

35

Phot

o: K

uyum

bins

koye

Fie

ld /

6000

/400

EK-

BMC

h AR

KTIK

A Ri

g

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 19: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES36 37INGEOS.RU

ROSNEFTCONSTRUCTION OF VARIOUS TYPES OF WELLS

RN-VANKOR: participation in the Vankor Field project in the role of EPC contractor during 2014-2016.

Construction of multilateral wells and side tracks with the total depth of up to 2200 m MD and a horizontal toe of up to 1400 m.

Over 50 wells in total reconstructed by side-tracking.

In 2015, a 4400 m vertical exploration well was drilled.

VOSTSIBNEFTEGAZ: contract for production well drilling for VOSTSIBNEFTEGAZ project during 2016-2018.

36

OUR PROJECTS

37

Pho

to: Y

urub

chen

o-To

khom

skoy

e Fi

eld

/ ZJ-

50 D

BS

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 20: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES38 39INGEOS.RU

JURASSIC DEPOSITSDIFFICULT WELLS

14 production wells and 11 exploration wells have been successfully drilled in Jurassic horizons and handed over to the customer.

Heavy drilling rigs with the capacity of 320-600 tons were used.

An exploration well with 1,412 m horizontal toe and measured depth of 5,545 m was drilled for the first time in the Jurassic deposits. Experience of managed pressure drilling (MPD) of Jurassic wells to minimize the risks of gas, oil and water kicks, hydraulic fracturing, and mud loss.

Jurassic Well Parameters

TVD 4,000-5,000 m and more

Formation pressure 100 MPa (1000 Atm) and more

Temperature 100-120 оС

Formation pressure anomaly ratio 2,1 and more

38

OUR PROJECTS

39DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES INGEOS.RU

Page 21: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES40 41INGEOS.RU40

CLIENTS

JSC INVESTGEOSERVISAddress: 10a, 60-letiya Oktyabrya ave., Moscow 117036 Tel.: (499) 750-0113 Fax: (499) 750-0114 E-mail: [email protected] Website: www.ingeos.ru

INGEOS.RU 41

CONTACTS

YAMAL LNG

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

Page 22: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES42 43INGEOS.RU

Page 23: DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES

DRILLING INNOVATIONS AND ADVANCED TECHNOLOGIES44

АО «Инвестгеосервис»

г. Москва, проспект 60-летия Октября, 10а

Телефон: +7 (499) 750 01 13

www.ingeos.ru