draft: 1/18/2005 1 naesb request r04016: standard energy day a problem statement discussion naesb...

34
1 Draft: 1/18/2005 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

Upload: molly-reid

Post on 26-Mar-2015

219 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

1

Draft: 1/18/2005

NAESB Request R04016: Standard Energy Day

A Problem Statement Discussion

NAESB WEQ/WGQ

Business Practices Subcommittee

Jan 24-25 2005

Page 2: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

2

Draft: 1/18/2005

Current Processes Converted toCentral Prevailing Time (CPT)

12am 12am12am12pm 12pm6am 6pm 6am 6pm

Mountain Electric Firm Daily Transmission

Pacific Electric Firm Daily Transmission

Central Electric Firm Daily Transmission

Eastern Electric Firm Daily Transmission

Start of existing Gas Day

ElectricTransmissionMarkets

Day Ahead Operating Day

Reserving electric transmission service and scheduling electric energy is essentially a continuous process. Deadlines exist for reserving some transmission products. These are established in existing tariffs and standards and are summarized (for several providers) in the attached supplementary information.

Beginning of the daily transmission product period - also represents beginning of the “flow day” for that time zone

End of the daily transmission product period - also represents end of the “flow day” for that time zone

Page 3: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

3

Draft: 1/18/2005

Current Processes -CPT

12am 12am12am12pm 12pm

CAISO

MISO

ISONE

PJM

NYISO

6am 6pm 6am 6pm

Start of existing Gas Day

Day Ahead Operating Day

Organized(i.e. RTO)Markets

Neither ERCOT nor SPP currently have Day Ahead markets

Market Closes (i.e. bids are due) Market Results are

posted

Beginning of the RTO Flow Day

End of the RTO Flow Day

Page 4: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

4

Draft: 1/18/2005

Open Trading

Current Processes - CPT

12am 12am12am12pm 12pm

ICE Elec Index Trading

NYMEX

On Peak Product – Eastern IC

On Peak Product – Western IC

6am 6pm 6am 6pm

All Gas Index Trading

Start of existing Gas Day

Platts Elec Index Trading

Open Trading:Bi-lateral trading for RTO and Non-RTO Electric as well as Gas

Day Ahead Operating Day

Bi-lateral trading is essentially continuous, particularly on the electric side, where hourly trading occurs 24/7

Day Ahead Trades that are included in published indices

Financial trading

Beginning of the On Peak Electric Product – also represents the beginning of the flow associated with that product

End of the On Peak Electric Product – also represents the end of the flow associated with that product

Page 5: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

5

Draft: 1/18/2005

Current Processes - CPT

12am 12am12am12pm 12pm

ND Nom 1 ND Nom 2ID Nom 1

ID Nom 2

6am 6pm 6am 6pm

Start of existing Gas Day

GasScheduling

Day Ahead Operating Day

Beginning of nomination period – i.e. nominations are due

End of nomination period – i.e. schedules are posted

“Timely” Nomination Cycle

“Evening” Nomination Cycle

“IntraDay 1” Nomination Cycle

“IntraDay 2” Nomination Cycle

Beginning of Gas Flow Day

Implementation of intraday cycles 1 and 2

Page 6: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

6

Draft: 1/18/2005

Open Trading

Current Processes - CPT

12am 12am12am12pm 12pm

CAISO

MISO

ISONE

PJM

NYISO

ICE Index Trading

NYMEX

ND Nom 1 ND Nom 2ID Nom 1

ID Nom 2

On Peak Product – Eastern IC

On Peak Product – Western IC

6am 6pm 6am 6pm

Gas Index Trading

Mountain Electric Firm Daily Transmission

Pacific Electric Firm Daily Transmission

Central Electric Firm Daily Transmission

Eastern Electric Firm Daily Transmission

Start of existing Gas Day

Platts Index Trading

GasScheduling

OpenTrading

Organized(i.e. RTO)Markets

ElectricTransmissionMarkets

Day Ahead Operating Day

Page 7: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

7

Draft: 1/18/2005

Typical Summer Load Profile

0.5

0.55

0.6

0.65

0.7

0.75

0.8

0.85

0.9

0.95

1

1.05

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Per Unit of Daily Peak Load

Ho

ur

of

Day

Start of existing Gas Day

On Peak Product

Page 8: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

8

Draft: 1/18/2005

Typical Winter Load Profile

0.75

0.8

0.85

0.9

0.95

1

1.05

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hour of Day

Per

Un

it o

f D

aily

Pea

k L

oad

Start of existing Gas Day

On Peak Product

Page 9: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

9

Draft: 1/18/2005

Impacts of Current Market Conditions

• For some industry participants, the existence of a substantive problem has not been well established. Additionally, the impact of a problem associated with the status quo may be more significant for some industry participants than for others.

• The following describes the impacts some industry participants may be experiencing with the status quo– Market risk associated with gas supply and nomination– Price uncertainty when market participants have two gas prices for one

electric flow period– Pipeline imbalances if market participants choose to “lean” on the

pipeline for the few hours just prior to the start of the Gas Day– Electric reliability concerns if generators needed to meet electric supply

are forced to shut down due to pipeline Operational Flow Orders (OFOs)

Page 10: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

10

Draft: 1/18/2005

Problem Statement• The following problem statement for Request R04016 is

derived based upon those impacts– The current “Gas Day” divides all of the following…

• The “electric flow day” for all 4 North American time zones and all RTOs with established next day markets

• Daily Firm transmission products for all transmission providers• The most liquidly traded “On Peak” electric trading products for both

the Eastern and Western Interconnections• The “on peak” period for Summer and (especially) Winter load

profiles– Nomination cycles are not well coordinated with RTO market

timelines– Intraday nomination cycles provide limited benefit for intraday

usage – especially with respect to committing peaking units– Transmission product seams issues exist when scheduling

electricity between time zones

Page 11: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

11

Draft: 1/18/2005

Gas Electric Coordination Discussion of Issues

Issue: Is a Standard Energy Day (SED) necessary to resolve the stated problem?Response:

– Price and supply risks for gas are being managed today through storage, pipeline management, and other risk mitigation strategies

– Many in the industry feel that the SED is not an appropriate solution

Issue: Should existing RTOs timelines be standardized? Response:

– RTO timelines are reasonably consistent when converted to CPT• The exception, NYISO, was intentionally established by its own stakeholders to clear prior to the

beginning of the PJM market period– Other “timeline” issues are irrelevant to the SED discussion

Issue: Should existing transmission reservation and scheduling timelines be standardized?

Response:– Electricity essentially has a continuous transmission reservation and scheduling process.– Incremental improvements to reservation and scheduling timelines may be possible

(R04020)

Page 12: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

12

Draft: 1/18/2005

Discussion of Issues - Con’t

Issue: Should RTO Markets clear in time to nominate gas?Response:

– RTOs clear prior to the 6pm evening nomination cycle, but not prior to the timely nomination cycle

• RTO Participants only have 1 shot at gas nomination– RTO market participants have a choice of risks

• Buy gas early for price certainty and risk the possibility of having excess supply if not selected in the market

• Buy gas after the close of the market and risk the volatility associated with the lack of liquidity in the afternoon market

• Interruptible gas transportation is only a risk management strategy and therefore not specifically addressed as part of the problem to be solved

Issue: Should the electric quadrant change its product definitions to coincide with the existing Gas Day?

Response:– Products reflect demand profiles, not fuel scheduling limitations. – Current product definitions represent the regional demand profiles in the east

and west.– This would be an unacceptable change to the electric industry creating

significant problems without adding benefit

Page 13: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

13

Draft: 1/18/2005

Discussion of Issues - Con’t

Issue: Will moving the Gas Day create significant safety issues? Response:

– Gas Standard 1.3.4 says that the Gas Industry is a 24 hour business• “All parties should support a seven-days-a-week, twenty-four-hours-a-day

nominations process.”– Existing Intraday Nomination Cycle #2 is implemented at 9pm– Pipeline’s gas control is a 7x24 operation designed to balance and maintain

pipeline activity (receipts, deliveries, compressors, storage, and line-pack)• Most producers very rarely change gas flow due to pipeline nomination

cycle (produce maximum levels consistent with good reservoir operating requirements)

• Although “trouble” call outs and flow plate replacements are more frequent during times of significant changes flow, changes in flow can usually occur without human intervention regardless of the time of day.

Issue: Should gas nomination cycles be changed?Response: Gas Principle 1.1.2

• “There should be a standard for the nominations and confirmation process. Agreement notwithstanding, it is recognized that this is an interim step to continuous and contiguous scheduling.”

Page 14: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

14

Draft: 1/18/2005

Conclusion• A Standard Energy Day (SED) is not a complete, stand-alone

solution for ensuring proper coordination between the gas and electric industries.

• A SED will require change by all parties in the industry.• A SED may provide benefit by

– Mitigating supply risks associated with the Gas Day splitting the electric flow days and the “On Peak” electric trading products

– Mitigating price risks associated with the Gas Day splitting the electric flow days and the “On Peak” electric trading products

– Reducing the potential reliability risks associated with OFOs that could result from imbalance

– Eliminating seams issues associated with scheduling electricity across time zones by having the same “flow days”

– Increasing next day nomination flexibility for RTO participants– Increasing intraday nomination flexibility for responding to

unexpected changes in gas requirements associated with changes in electric demand

Page 15: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

15

Draft: 1/18/2005

Criteria for a Successful SED

• Appropriately balance cost and benefit• Synchronize gas and electric flow days

for all market participants• Encompass (as opposed to split) the “On

Peak” electric demand period and trading product

• Maintain safety and reliability for all market participants

Page 16: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

16

Draft: 1/18/2005

Given the problem statement and stated criteria, how could the “requested” Standard Energy Day be implemented and what would

be its impacts on the industry?

Page 17: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

17

Draft: 1/18/2005

Open Trading

“As Requested” Standard Energy DayWith Other Processes as They Exist Today

12am 12am12am12pm 12pm

CAISO

MISO

ISONE

PJM

NYISO

ICE Index Trading

NYMEX

ND Nom 1 ND Nom 2ID Nom 1

ID Nom 2

On Peak Product – Eastern IC

On Peak Product – Western IC

6am 6pm 6am 6pm

Gas Index Trading

Mountain Electric Firm Daily Transmission

Pacific Electric Firm Daily Transmission

Central Electric Firm Daily Transmission

Eastern Electric Firm Daily Transmission

Platts Index Trading

GasScheduling

OpenTrading

Organized(i.e. RTO)Markets

ElectricTransmissionMarkets

Day Ahead Operating Day

Start of SED

Transmission Days don’t

align

Market Days don’t align

Nomination Cycle is

disjointedNo Intraday Nomination

Benefit

Reserve & Schedule transmission service

Page 18: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

18

Draft: 1/18/2005

Open Trading

“As Requested” Standard Energy Day With “Straw-Man” Nomination Cycles

12am 12am12am12pm 12pm

CAISO

MISO

ISONE

PJM

NYISO

ND 1 ND 2ID 1

ID 2

On Peak Product – Eastern IC

On Peak Product – Western IC

6am 6pm 6am 6pm

Mountain Electric Firm Daily Transmission

Pacific Electric Firm Daily Transmission

Central Electric Firm Daily Transmission

Eastern Electric Firm Daily Transmission

NYMEX

Gas Index Trading

ND 3

ICE Index Trading

Platts Index Trading

Day Ahead Operating Day

Reserve & Schedule transmission service

Page 19: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

19

Draft: 1/18/2005

Impact of non-Midnight proposals on the WEQ

Page 20: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

20

Draft: 1/18/2005

Alternative SEDs

Typical Summer Load Profile

0.5

0.55

0.6

0.65

0.7

0.75

0.8

0.85

0.9

0.95

1

1.05

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Per Unit of Daily Peak Load

Ho

ur

of

Day

On Peak Product

Page 21: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

21

Draft: 1/18/2005

Typical Winter Load Profile

0.75

0.8

0.85

0.9

0.95

1

1.05

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hour of Day

Per

Un

it o

f D

aily

Pea

k L

oad

Alternative SEDs

On Peak Product

Page 22: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

22

Draft: 1/18/2005

Questions?

Page 23: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

23

Draft: 1/18/2005

Supplemental Information

Page 24: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

24

Draft: 1/18/2005

“As Requested” SED for WEQ

1. All Transmission Providers shall be required to offer products that are consistent with the SED– Reservation timetables may need to be modified to be consistent with the SED

• This should be a follow-up activity via R04020– Eastern time zone TPs must offer a 1am-1am Daily Firm product– Mountain time zone TPs must offer an 11pm-11pm Daily Firm product– Pacific time zone TPs must offer a 10pm-10pm Daily Firm product

2. All RTOs shall settle next day markets and schedules based on the SED– Timing of market clearing can remain unmodified or be standardized if appropriate

• This should be a follow-up decision/activity via R04020

3. Products for Eastern and Western Interconnect remain unchanged, but are restated in terms of the SED– Eastern

• On Peak: 6am-10pm (i.e. HE7-22) CPT• Off Peak: 12am-6am and 10pm-12am CPT

– Western• On Peak: 8am-12am CPT (i.e. 6am-10pm PPT)• Off Peak: 12am-8am CPT

Page 25: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

25

Draft: 1/18/2005

“As Requested” SED for WGQ

1. All suppliers and pipelines shall change flows based on the SED– Old: 9am, 5pm, 9pm – New: 12am, 12pm, and 6pm

2. “Straw Man” Gas Nominations as follows:• Old:

– ND 1 (11:30am-5pm)– ND 2 (6pm-10pm)– ID 1 (10am-2pm) effective at 5pm– ID 2 (5pm-9pm) effective at 9pm

• New: – ND 1 (12pm-2:30pm)– ND 2 (4pm-6:30pm)– ND 3 (7:30pm-10pm)– ID 1 (9:30am-12pm) effective at 12pm– ID 2 (3:30pm-6pm) effective at 6pm

Page 26: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

26

Draft: 1/18/2005

“As Requested” SED Converted to “Real Time” for Eastern Time Zone

Open Trading

12am 12am12am12pm 12pm

MISO

ISONE

PJM

NYISO

On Peak Product – Eastern IC

6am 6pm 6am 6pm

Eastern Electric Firm Daily Transmission

NYMEX

Gas Index Trading

ICE Index Trading

Platts Index Trading

Day Ahead Operating Day

ND 1 ND 2ID 1

ID 2

ND 3

Reserve & Schedule transmission service

Page 27: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

27

Draft: 1/18/2005

“As Requested” SED Converted to “Real Time” for Mountain Time Zone

Open Trading

12am 12am12am12pm 12pm

On Peak Product – Western IC

6am 6pm 6am 6pm

Mountain Electric Firm Daily Transmission

NYMEX

Gas Index Trading

ICE Index Trading

Platts Index Trading

Day Ahead Operating Day

ND 1 ND 2ID 1

ID 2

ND 3

Reserve & Schedule transmission service

Page 28: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

28

Draft: 1/18/2005

“As Requested” SED Converted to “Real Time” for Pacific Time Zone

Open Trading

12am 12am12am12pm 12pm

CAISO

On Peak Product – Western IC

6am 6pm 6am 6pm

Pacific Electric Firm Daily Transmission

NYMEX

Gas Index Trading

ICE Index Trading

Platts Index Trading

Day Ahead Operating Day

ND 1 ND 2ID 1

ID 2

ND 3

Reserve & Schedule transmission service

Page 29: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

29

Draft: 1/18/2005

Impacts for WEQ

• TPs must adjust OASIS postings to reflect the SED– Changes to product offerings will be necessary– Programmatic changes to OASIS should not be necessary– Billing changes should be minimal

• RTOs must settle next day markets based on the SED– Some programmatic changes to the market clearing will be

necessary to account for the new definition of “next day”– Market participants will be required to adjust Schedules, bids,

and offers based on the new definition of “next day”– Billing changes should be minimal

Page 30: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

30

Draft: 1/18/2005

Impacts for WEQ – Con’t

• Balancing Authorities will have to accept schedules based on the new definition of “next day”– Some configuration changes may be necessary, but

programmatic changes should be minimal

• Trading Product definitions will have to be restated in terms of the new SED, but the impact should be negligible

• Other Impacts?

Page 31: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

31

Draft: 1/18/2005

Impacts for WGQ

• Suppliers and pipelines must adjust flows at new times– Operational and possibly programmatic changes to

accommodate new flow times– Potential for increased callouts during non-business

(e.g. night-time) hours

• Pipelines must change nomination cycles– Nomination cycles shortened to 2.5 hours to avoid

significant increases in scheduler workday – requires programmatic changes

– Addition of a 3rd Day Ahead nomination cycle

Page 32: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

32

Draft: 1/18/2005

Impacts for WGQ – Con’t

• Intraday volume flexibility has been altered– Proposal increases flexibility for intraday increases in nomination

• Old: Intraday cycles effective at 5pm and 9pm• New: Intraday cycles effective at 12pm and 6pm

– Proposal reduces flexibility for intraday decreases in nomination• Old:

– ID 1 can reduce by 2/3 daily volume – ID 2 can reduce by 1/2 daily volume

• New: – ID 1 can reduce by 1/2 daily volume– ID 2 can reduce by 1/4 daily volume

• Other Impacts?

Page 33: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

33

Draft: 1/18/2005

Day-Ahead Firm Transmission Timing AnalysisDaily Firm P/P

CST/CPT 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400

CPL (1)DUK (2)EES (3)MISOPJM (4) 2 Business days prior to commencement of serviceSOCO (5)SPPTVAVAP (6)

Reservation timingSchedule timingNext Day Firm not available

CPL (1) within negotiated time frame

In order to implement interchange schedules, tags must be accurate, complete, and time-stamped no later than 20 minutes prior to the start of the schedule.

DUK (2) In order to implement interchange schedules, tags must be accurate, complete, and time-stamped no later than 20 minutes prior to the start of the schedule.

New schedules or schedule changes must be submitted no later than 20 minutes prior to start. New schedules or schedule changes received after the twenty

EES (3) minute deadline will be deemed LATE and will be denied for anything other than emergency reliability reasons

no later than noon, 2 PJM business days prior to the commencement of service

PJM (4) Pre-Scheduled Real-Time Transactions, (i.e. those transactions that will receive the Real-time LMP), must be submitted to the PJM OI by 1400 EPT

(1200 on non-business days) of the day before the Operating Day Pre-Scheduled Real-time with Price Transactions, must be submitted to the PJM OI by

1200 noon EPT of the day before the Operating Day. These transactions are analyzed identically to unit-specific resources. For this reason, they are not

permitted to change after 1200 noon EPT of the day before operations

Reservations for the Transmission Customers Firm Point-To-Point Transmission Service must be submitted to the Transmission Provider no later than 12 noon

SOCO (5) of the day prior to commencement of such service. Reservations submitted after 12 noon will be accommodated if practicable

In order to implement interchange schedules, tags must be accurate, complete, and time-stamped no later than 20 minutes prior to the start of the schedule.

not later than day ahead by 10:00

VAP (6) Schedules for the Transmission Customers Firm Point-To-Point Transmission Service must be submitted to the Transmission Provider no later than 10:00 a.m.

of the day prior to commencement of such service. Schedules submitted after 10:00 a.m. will be accommodated if practicable

Disclaimer: This document is for comparative purposes only. The information herein is the interpretation of Tariff filings and actual business practices,

and is not intended to be an official representation of service timings.

Page 34: Draft: 1/18/2005 1 NAESB Request R04016: Standard Energy Day A Problem Statement Discussion NAESB WEQ/WGQ Business Practices Subcommittee Jan 24-25 2005

34

Draft: 1/18/2005

Follow on Considerations

• Can nominations occur continuously?• Should MISO timeline be changed?• Should NYISO timeline be changed?• Should transmission reservation timelines

be standardized to be consistent with the SED?

• Should schedule implementation times be standardized to be compatible across regions?

Most of these are R04020 considerations…