DESCRIPTION

This item shall consist of furnishing, placing and compacting an aggregate subbase course on a prepared subgrade in accordance with this Specification and the lines, grades and cross-sections shown on the Plans, or as directed bythe Engineer.

Page 3: Dpwh standard specifications
Page 4: Dpwh standard specifications

MATERIALS

*hard, durable particles or fragments of 1.crushed stone 2. crushed slag 3. crushed or natural gravel 4. filler of natural or crushed sand or

other finely divided mineral matter. The composite material shall be free from

vegetable matter and lumps or balls of clay, and shall be of such nature that it can be compacted readily to form a firm, stable subbase

Page 5: Dpwh standard specifications

ITEM 200 (SUB BASE)

Sieve DesignationStandard Alternate US Standards

Mass Percent Passing

50 2” 100

25 1” 55-85

10 3/8” 40-75

0.75 No. 200

0-12

GRADING REQUIREMENTS

Page 6: Dpwh standard specifications

Conditions:1. The fraction passing the 0.75 mm

(200) sieve should not be greater than 2/3 of the fraction passing the 0.425 mm No. 40 sieve

2. The fraction passing the 0.425mm sieve should have a liquid limit not greater than 25 and plastic index not more than 12.

3. The coarse portion retained on a 3mm sieve should have a mass percent of wear not to exceed 5o by the Los Angeles Abrasion Tests.

Page 7: Dpwh standard specifications

CONSTRUCTION REQUIREMENTS

1. Preparation of existing Surface2. Placing 3. Spreading and Compacting4. Trial Sections5. Tolerances

Page 8: Dpwh standard specifications

Preparation of existing Surface

Before placing the sub-base materials, the existing surface must be graded and finished

Page 9: Dpwh standard specifications

Placing

The aggregate sub base material shall be placed at a uniform mixture on a prepared sub grade in a quantity in which it will provide the desired compacted thickness.

Page 10: Dpwh standard specifications

Spreading and Compacting

When uniformly mixed, the mixture shall be spread to the plan thickness, for compaction

Page 11: Dpwh standard specifications

Trial Sections

Before the subbase construction is started , spreading and compacting trial is done , in order to ensure suitability of materials and equipment to be used.

Page 12: Dpwh standard specifications

Tolerances

ALLOWABLE TOLERANCES

Permitted Variation from Design THICKNESS OF LAYER

± 20 mm

Permitted Variation from Design LEVEL OF SURFACE

+10 mm-20 mm

Permitted Surface IrregularityMeasured by 3-m straight- edge

20mm

Permitted Variation from Design CROSSFALL OR CAMBER

± 0.3%

Permitted Variation from Design LONGITUDINAL GRADE over25m in length

± 0.1%

Page 13: Dpwh standard specifications