dpw sidewalk repair plan update 07/30/2013
DESCRIPTION
TRANSCRIPT
![Page 1: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/1.jpg)
Citywide Sidewalk Maintenance Forum
City of Atlanta
Department of Public Works
Richard Mendoza, Commissioner
July 30, 2013 1
![Page 2: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/2.jpg)
Walkable Communities
Sidewalks can
improve pedestrian
safety, encourage
walkability, and
enhance the quality
of life in our
neighborhoods.
2
![Page 3: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/3.jpg)
Citywide Sidewalk Maintenance & Repair Program Objectives
• Develop efficient and effective protocols for inspecting and repairingsidewalks currently in disrepair.
• List sidewalk conditions that should be identified for further investigation andpossible improvements.
• Manage needed sidewalk repairswithin current budgetary constraints.
• Develop priority list of candidate sidewalk repair projects for future funding.
3
![Page 4: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/4.jpg)
Current Backlog of Sidewalk and Curb Repairs
Sidewalks $119,913,000
Curbs $32,274,000
Total $152,187,000
These figures were derived from the 2010 State of the Infrastructure Report
4
![Page 5: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/5.jpg)
Educate Property Owners:
Sec. 138-14. Maintenance of sidewalk area.
(b) Whenever a sidewalk is paved …the owner of the abutting property shall be responsible for maintenance of that space and for keeping it free of holes and weeds, level with the sidewalk and sodded with grass and for watering, pruning and maintaining the planted materials, …
(Code 1977, §§ 9-3016, 9-3087, 9-3086; Ord. No. 2001-22, § 1, 3-14-01)
Sidewalk Maintenance Per City Code
5
![Page 6: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/6.jpg)
Sidewalk Maintenance Per City Code
Educate Property Owners:
Sec. 138-14. Maintenance of sidewalk area.
(d) Damaged sidewalk abutting the right-of-way. When the sidewalk abutting the right-of-way is damaged, it is the obligation of the abutting property owner to repair such sidewalk upon notice from the Department of Public Works. If after receiving such notice, the abutting property owner fails to repair the sidewalk within a reasonable time, the department of public works is authorized to make such repairs and assess the abutting property owner for costs incurred.
(Code 1977, §§ 9-3016, 9-3087, 9-3086; Ord. No. 2001-22, § 1, 3-14-01)
6
![Page 7: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/7.jpg)
Incident Reporting
Sidewalk complaints are recorded
and logged by the DPW
Customer Service Center.
(404) 330-6333
Email:
7
![Page 8: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/8.jpg)
Inspections
Samples of damaged sidewalk
All sidewalks containing elements of disrepair such as dipping, cracking, chipping or shifting that cause the sidewalk segment to be raised, missing, deteriorated or broken will be evaluated by the Engineering Division
8
![Page 9: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/9.jpg)
Repairs
• City responsible repairs
will be done within 30
days
• Property owner
responsible repairs will
be noticed with cost
estimate and repair
alternatives
• Property owner may use
city contractors or own
contractors, Reply within
15 days of receipt of
notice
City Crews complete sidewalk repairs along Peachtree Street, NE
9
![Page 10: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/10.jpg)
Sidewalk Condition Assessments
� Georgia Tech Study
$400K Grant Study Underway
� DPW Full Time Program Manager / Inspector
- Repair Alternatives- Full Excavation / Replacement- Sidewalk Leveling / Shaving- Sidewalk Injection
10
![Page 11: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/11.jpg)
Sidewalk Repair Management
11
![Page 12: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/12.jpg)
Process Moving Forward
� Red Tape Recommendations Completed
� DOJ Agreement in Process
� Future Bond List
12
![Page 13: DPW sidewalk repair plan update 07/30/2013](https://reader034.vdocuments.us/reader034/viewer/2022051323/547e95a05806b5ea5e8b46ec/html5/thumbnails/13.jpg)
Citywide Sidewalk Maintenance & Repair Program
City of Atlanta
Department of Public Works
Richard Mendoza, Commissioner
July 30, 2013
Thank You!
13