7/27/2019 DPR 15-8-13
1/94
Designation/
Contact No.Remark
Name of
TownStatus as on today
Cummulative S
D
Erection work Baghpat
No work done
,because 4 no. of
manpower so work
stopped by me
3 nos of 250 kva T
with chemical ear
Reconducting we
conductor
Erection workBaraut 1st
divisionpit digging
31 nos of SP-33 po
55,5 nos of DP for
Erection workBaraut 2nd
division
7 nos, of SP-33 pole
are erected at site
11 kv line 300 mtr
SP-33,23 nos DP f
Erection work Khekra
250 Kva T/f are
insttalation at site,no
load charging
11kv line 2.5 km,1
KVAT/F & 1 nos
charging at no load
BaghpatBhanu Partap
Singh
Khekra
Restructured Accelerated Power Development and Reforms Progra
DAILY PROGRESS REPORT OF DATE-23/7/13
Name of
Circle
Name of Circle
Engineer
Name of
Town/Site
visited
DISCOM Activities Contractor Activities
Name of
Person
interacted with
Activity
-
7/27/2019 DPR 15-8-13
2/94
Restructured Accel
Name of Circle
Name of
Circle
Engineer
Name of
Town/Site
visited
Name of Person interacted
with
Baghpat
Bhanu
Partap
Singh
Baghpat&Baraut DK GARG
-
7/27/2019 DPR 15-8-13
3/94
Designation/Contact
No.Remark
Erection
work
Erection
work
Erection
work
Erection
work
rated Power Development and Reforms ProgrDAILY PROGRESS REPORT OF DATE-24/7/13
DISCOM Activities
Activity
SE/94127-49205
To meet SE sir, discuss the Progressive Month
target & july or August month target.Transformerlocation with serial No. &11kv line new or
reconducting both which area progress,A
summrised copy send or discuss with Executive
engg.
-
7/27/2019 DPR 15-8-13
4/94
Name of
TownStatus as on today
Cummulative Status of work
till DateRemark
Baghpat3 span of 11kv line& 2 nos of
SP_55 pole are erected
3 nos of 250 kva T/F
insttalation with chemical
earthing,300 mtr.
Reconducting weasel to Dog
conductor. SP-55 pole 2nos.
Baraut
1stdivision
4 nos of SP-33 pole are erected
35 nos of SP-33 pole, 5 nos of
SP-55,5 nos of DP for 100 kvaT/F
Baraut
2nd
division
no work because labour holiday
11 kv line 300 mtr.,103 nos of
pole SP-33,23 nos DP for 100
KVA T/F.
Khekra8 Span of Reconducting i.e. 300
mtr.
11kv line 2.5 km,1 nos of 250
KVAT/F & 1 nos 100 KVA
T/F charging at noload.Reconducting ACSR Dog
conductor 300 mtr.
am Part -B,PVVNL
Contractor Activities Name of Contractor- VVIPL
-
7/27/2019 DPR 15-8-13
5/94
Name of CircleName of Circle
Engineer
Name of Town/Site
visitedName of
Baghpat Bhanu Partap Singh Baraut
-
7/27/2019 DPR 15-8-13
6/94
Designation/Contact No. Remark
Restructured Accelerated Power DevelopmDAILY PROGRESS RE
DISCOM Activities
erson interacted
with
-
7/27/2019 DPR 15-8-13
7/94
Name of Town
Erection work Baghpat
Erection work Baraut 1st division
Erection work Baraut 2nd division
Erection work Khekra
ent and Reforms Program Part -BORT OF DATE-25/7/13
Contractor Activities
Activity
-
7/27/2019 DPR 15-8-13
8/94
Status as on today Cummulative Status of work till Date
3 span of 11kv line
3 nos of 250 kva T/F insttalation with
chemical earthing, mtr. Reconducting
weasel to Dog conductor. SP-55 pole
2nos.
4 nos of SP-33 pole are erected39 nos of SP-33 pole, 5 nos of SP-55,5
nos of DP for 100 kva T/F
5 nos. of SP-55 pole are erected11 kv line 300 mtr.,108 nos of pole SP-
33,23 nos DP for 100 KVA T/F.
10 Span of Reconducting i.e. 500mtr.
11kv line 2.5 km,1 nos of 250 KVAT/F
& 1 nos 100 KVA T/F charging at noload.Reconducting ACSR Dog
conductor 800 mtr.
PVVNL
Name of Contra
-
7/27/2019 DPR 15-8-13
9/94
Remark
tor- VVIPL
-
7/27/2019 DPR 15-8-13
10/94
Designat
ion/Cont
act No.
Remark
Restructu
Name of Circle
Name of
Circle
Engineer
Name of
Town/Sit
e visited
DISCOM Activities
Name of Person
interacted with
Baghpat
Bhanu
Partap
Singh
Khekra
-
7/27/2019 DPR 15-8-13
11/94
Name of Town
Erection work Baghpat
Erection work Baraut 1st division
Erection work Baraut 2nd division
Erection work Khekra
ed Accelerated Power Development andDAILY PROGRESS REPORT OF
Contractor Activities
Activity
-
7/27/2019 DPR 15-8-13
12/94
Status as on today
7 span of 11kv line i.e. 385 mtr.
5 nos of SP-33 pole are erected
Pit digging
4 Span of Reconducting i.e. 240 mtr.
Reforms Program ParATE-26/7/13
-
7/27/2019 DPR 15-8-13
13/94
Cummulative Status of work till Date
3 nos of 250 kva T/F insttalation with chemical
earthing,835 mtr. Reconducting weasel to Dog
conductor. SP-55 pole 2nos.
43 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP for 100
kva T/F
11 kv line 300 mtr.,108 nos of pole SP-33,23 nos DP for
100 KVA T/F.
11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100
KVA T/F charging at no load.Reconducting ACSR Dog
conductor 1040mtr.
t -B,PVVNL
Name of Contracto
-
7/27/2019 DPR 15-8-13
14/94
Remark
- VVIPL
-
7/27/2019 DPR 15-8-13
15/94
Baghpat Bhanu Partap Singh Baraut
Restructured A
Name of CircleName of Circle
Engineer
Name of Town/Site
visitedName of Person
interacted with
-
7/27/2019 DPR 15-8-13
16/94
Designation/Contact No. Remark
Erection work
Erection work
Erection work
Erection work
ccelerated Power Development and ReformsDAILY PROGRESS REPORT OF DATE-27/7/13
DISCOM Activities C
Activity
-
7/27/2019 DPR 15-8-13
17/94
Name of
TownStatus as on today
Cummulative Status of work till
Date
BaghpatPit digging for Replacement
pole
3 nos of 250 kva T/F insttalation
with chemical earthing,835 mtr.
Reconducting weasel to Dog
conductor. SP-55 pole 2nos.
Baraut 1st
divisionno work because no laboure
43 nos of SP-33 pole, 5 nos of SP-55,5
nos of DP for 100 kva T/F
Baraut 2nddivision
4 nos . of SP-33 pole are erected 11 kv line 300 mtr.,112 nos of pole SP-33,23 nos DP for 100 KVA T/F.
Khekra7 Span of Reconducting i.e. 400
mtr.
11kv line 2.5 km,1 nos of 250
KVAT/F & 1 nos 100 KVA T/F
charging at no load.Reconducting
ACSR Dog conductor 1440mtr.
Program Part -B,PVVNL
ntractor Activities Name of Contracto
-
7/27/2019 DPR 15-8-13
18/94
Remark
- VVIPL
-
7/27/2019 DPR 15-8-13
19/94
Designation/Cont
act No.
Baghpat BhanuPartap
Singh
Baghpat Rvinder Singh JE/9412749600
Restru
Name of Circle
Name of
Circle
Engineer
Name of
Town/Sit
e visited
DISC
Name of Person
interacted with
-
7/27/2019 DPR 15-8-13
20/94
Remark
Erection work
Erection work
Erection work
Erection work
to meet sir at the site,site check pole areerected & some other location where pole are
replaced
ctured Accelerated Power Development aDAILY PROGRESS REPORT
M Activities
Activity
-
7/27/2019 DPR 15-8-13
21/94
Name of Town Status as on today
Baghpat 6 nos. of SP-55 pole arected
Baraut 1st division no work because no laboure
Baraut 2nd division no work because no laboure
Khekrano work because laboure
Sunday holiday
nd Reforms Program Part -B,PF DATE-28/7/13Contractor Activities
-
7/27/2019 DPR 15-8-13
22/94
Cummulative Status of work till Date Remark
3 nos of 250 kva T/F insttalation with
chemical earthing,835 mtr. Reconducting
weasel to Dog conductor. SP-55 pole 8nos.
43 nos of SP-33 pole, 5 nos of SP-55,5 nos
of DP for 100 kva T/F
11 kv line 300 mtr.,108 nos of pole SP-33,23
nos DP for 100 KVA T/F.
11kv line 2.5 km,1 nos of 250 KVAT/F & 1
nos 100 KVA T/F charging at no
load.Reconducting ACSR Dog conductor1040mtr.
VVNL
Name of Contractor- VVIPL
-
7/27/2019 DPR 15-8-13
23/94
Name of Circle Name of Circle Engineer Name of Town/Site visitedNam
Baghpat Bhanu Partap SinghBaghpat
Khekra
-
7/27/2019 DPR 15-8-13
24/94
Designation/Contact No.
Restructured Accelerate
DISCOM Activities
e of Person interacted with
-
7/27/2019 DPR 15-8-13
25/94
Remark
Erection work
Erection work
Erection work
Erection work
d Power Development and Reforms ProgrDAILY PROGRESS REPORT OF DATE-30/7/13
Con
Activity
-
7/27/2019 DPR 15-8-13
26/94
Name of Town Status as on today Cummulative Status of work till Date
Baghpat5 nos of span are
conducting i.e. 250 mtr.
3 nos of 250 kva T/F insttalation with
chemical earthing,1085 mtr.
Reconducting weasel to Dog
conductor. SP-55 pole 14nos.
Baraut 1st division6 nos SP-33 of pole are
erected
49 nos of SP-33 pole, 5 nos of SP-55,5
nos of DP for 100 kva T/F
Baraut 2nd division3 SP-33 pole are erected at
site
11 kv line 300 mtr.,114 nos of pole SP-
33,23 nos DP for 100 KVA T/F.
Khekra
6 span ACSR Dog atre string
i.e. 300 mtr. 1 nos
of SP_55 are erected
11kv line 2.5 km,1 nos of 250 KVAT/F
& 1 nos 100 KVA T/F charging at no
load.Reconducting ACSR Dog
conductor 1540mtr.
m Part -B,PVVNL
tractor Activities Name
-
7/27/2019 DPR 15-8-13
27/94
Remark
of Contractor- VVIPL
-
7/27/2019 DPR 15-8-13
28/94
Designation/Contact
No.
R
Name of Circle
Name of
Circle
Engineer
Name of
Town/Sit
e visited
DISCOM
Name of Person
interacted with
Baghpat
Bhanu
Partap
Singh
Baghpat
KhekraPooshp Dev G JE/9412749592
-
7/27/2019 DPR 15-8-13
29/94
Remark Name of Town
Erection work Baghpat
Erection work Baraut 1st division
Erection work Baraut 2nd division
Erection work Khekra
structured Accelerated Power Development andDAILY PROGRESS REPORT OF D
ctivities Contractor Activitie
Activity
to meet sir, discuss the AB cable laying
process & populated , thief area are most
pariority
-
7/27/2019 DPR 15-8-13
30/94
Status as on today Cummulative Status of work till Date
5 nos of span are conducting i.e.
280 mtr.
3 nos of 250 kva T/F insttalation with chemical
earthing,1365 mtr. Reconducting weasel to Dog
conductor. SP-55 pole 14nos.
2 nos SP-33 of pole are erected
51 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP for 100
kva T/F
5 SP-33 pole are erected at site11 kv line 300 mtr.,119 nos of pole SP-33,23 nos DP for
100 KVA T/F.
no work because shutdown
problem,Roushting time change
11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100
KVA T/F charging at no load.Reconducting ACSR Dog
conductor 1540mtr.
Reforms Program Part -B,PVVNLTE-31/7/13
s Name of Co
-
7/27/2019 DPR 15-8-13
31/94
Remark
tractor- VVIPL
-
7/27/2019 DPR 15-8-13
32/94
Name of CircleName of Circle
Engineer
Name of Town/Site
visited Name of Person interacted
Baghpat Bhanu Partap Singh Baghpat Ravinder kr.
-
7/27/2019 DPR 15-8-13
33/94
Designation/Contact No. Remark
Restructured Accelerated PowDAIL
DISCOM Activities
JE/9412749600
to meet sir, check the site where
pole are erected at site,some
other location mid span pole are
required
-
7/27/2019 DPR 15-8-13
34/94
Name of Town
Erection work Baghpat
Erection work Baraut 1st division
Erection work Baraut 2nd division
Erection work Khekra
r Development and Reforms ProgramY PROGRESS REPORT OF DATE-1/8/13
Contractor Activities
Activity
-
7/27/2019 DPR 15-8-13
35/94
Status as on today Cummulative Status of work till Date
2 SP-55 pole are erected & 1 SP-33 pole are
erected
3 nos of 250 kva T/F insttalation with chemical
earthing,1365 mtr. Reconducting weasel to Dog
conductor. SP-55 pole 16nos.
2 nos SP-33 of pole are erected ,6 span of
Reconducting of 11 KV line i.e. 350 mtr.
53 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP
for 100 kva T/F,
Reconducting of 11 kv line 350 mtr.
3 SP-33 pole are erected at site11 kv line 300 mtr.,122 nos of pole SP-33,23 nos
DP for 100 KVA T/F.
no work because labour holiday
11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos
100 KVA T/F charging at no load.Reconducting
ACSR Dog conductor 1540mtr.
art -B,PVVNL
Name of Con
-
7/27/2019 DPR 15-8-13
36/94
Remark
ractor- VVIPL
-
7/27/2019 DPR 15-8-13
37/94
Baghpat Bhanu Partap Singh Baghpat
Name of CircleName of Circle
Engineer
Name of Town/Site
visited Name of Person
-
7/27/2019 DPR 15-8-13
38/94
Designation/Contact No. Remark
Restructured Accelerated PowerDAILY PR
DISCOM Activities
-
7/27/2019 DPR 15-8-13
39/94
Name of Town
Erection work Baghpat
Erection work Baraut 1st division
Erection work Baraut 2nd division
Erection work Khekra
evelopment and Reforms PrograOGRESS REPORT OF DATE-2/8/13
Contractor Activities
Activity
-
7/27/2019 DPR 15-8-13
40/94
Status as on today Cummulative Status of work till Date
Reconducting of 11 KV line work
on progress.
Pit Digging for SP-55 pole
3 nos of 250 kva T/F insttalation with
chemical earthing,1365 mtr. Reconducting
weasel to Dog conductor. SP-55 pole 16nos.
Pit digging for LT line
53 nos of SP-33 pole, 5 nos of SP-55,5 nos of
DP for 100 kva T/F,
Reconducting of 11 kv line 350 mtr.
AB cable laying 12 Span i.e. 440 mtr.
11 kv line 300 mtr.,122 nos of pole SP-33,23
nos DP for 100 KVA T/F. AB
cable laying 1140 mtr.
no work because labour holiday
11kv line 2.5 km,1 nos of 250 KVAT/F & 1
nos 100 KVA T/F charging at no
load.Reconducting ACSR Dog conductor
1540mtr.
Part -B,PVVNL
Name of
-
7/27/2019 DPR 15-8-13
41/94
Remark
ontractor- VVIPL
-
7/27/2019 DPR 15-8-13
42/94
Designat
ion/Cont
act No.
Remark
Restructured Accelerated Power DeveloDAILY PROGRESS REPO
Name of Circle
Name of
CircleEngineer
Name of
Town/Site visited
DISCOM Activities
Name of Personinteracted with
Acti
Bhanu
-
7/27/2019 DPR 15-8-13
43/94
Singh
-
7/27/2019 DPR 15-8-13
44/94
Name ofTown
Status as on today
Cummul
ative
Status of
work till
Date
Remark
Erection
workBaghpat
Reconducting of 11 KV line work on
progress.
2 nos. SP-55 pole are erected at site
3 nos of
250 kva
T/F
insttalati
on with
chemical
earthing,1365
mtr.
Recondu
cting
weasel to
Dog
conducto
r. SP-55
pole
16nos.
Erection
work
Baraut
1st
division
Reconducting of 11 KV line work on
progress.
400 mtr. ACSR conductor
53 nos of
SP-33
pole, 5
nos of SP-
55,5 nos
of DP for
100 kva
T/F,
Reconducting of
11 kv
line 350
mtr.
ment and Reforms Program Part -RT OF DATE-3/8/13
Contractor Activities Name of
vity
-
7/27/2019 DPR 15-8-13
45/94
Erectionwork
Baraut
2nd
division
AB cable laying 6 Span i.e. 230 mtr.
11 kv
line 300
mtr.,122
nos of
pole SP-
33,23 nosDP for
100 KVA
T/F.
AB cable
laying
1370 mtr.
Erection
workKhekra no work because labour holiday
11kv line
2.5 km,1nos of
250
KVAT/F
& 1 nos
100 KVA
T/F
charging
at no
load.Rec
onductin
g ACSR
Dog
conducto
r
1540mtr.
-
7/27/2019 DPR 15-8-13
46/94
Designat
ion/Cont
act No.
Remark
Restructured Accelerated Power DeveDAILY PROGR
Name of Circle
Name of
Circle
Engineer
Name of
Town/Sit
e visited
DISCOM Activities
Name of Person
interacted with
Acti
Baghpat
Bhanu
Partap
Singh
Baghpat
-
7/27/2019 DPR 15-8-13
47/94
Name of
Town
Status as on today
Erection
workBaghpat
Reconducting of 11 KV line work on progress.
7 nos span of reconducting i.e. 370 mtr.
Erectionwork
Baraut
1st
division
no work labour holiday
Erection
work
Baraut
2nd
division
AB cable work on progress
pit digging for SP-33 pole
Erection
workKhekra no work because labour holiday
opment and Reforms Program Part -SS REPORT OF DATE-4/8/13
Contractor Activities
vity
-
7/27/2019 DPR 15-8-13
48/94
Cummulative Status of
work till Date
Remark
3 nos of 250 kva T/F
insttalation with
chemical earthing,1735
mtr. Reconducting
weasel to Dog
conductor. SP-55 pole
16nos.
53 nos of SP-33 pole, 5
nos of SP-55,5 nos of DP
for 100 kva T/F,
Reconducting of 11 kv
line 350 mtr.
11 kv line 300 mtr.,122
nos of pole SP-33,23 nos
DP for 100 KVA T/F.
AB cable laying 1140
mtr.
11kv line 2.5 km,1 nosof 250 KVAT/F & 1 nos
100 KVA T/F charging at
no load.Reconducting
ACSR Dog conductor
1540mtr.
B,PVVNL
Name of Contractor- VVIPL
-
7/27/2019 DPR 15-8-13
49/94
Designat
ion/Cont
act No.
Remark
Baghpat
Bhanu
Partap
Singh
BARAUT
Restructured Accelerated
Name of Circle
Name of
Circle
Engineer
Name of
Town/Site
visited
DISCOM Activities
Name of Person
interacted with
Acti
-
7/27/2019 DPR 15-8-13
50/94
Name of
Town
Status as on today
Erection
workBaghpat
Reconducting of 11 KV line work on
progress.
No work because labour holiday
Erectionwork
Baraut
1stdivision
LT line work on progress12 nos. of SP-33 pole are erected at site
Erection
work
Baraut
2nd
division
pit digging
Erection
workKhekra no work because labour holiday
ower Development and RefDAILY PROGRESS REPORT OF DATE-
Contractor Activities
vity
-
7/27/2019 DPR 15-8-13
51/94
Cummulative Status of work till Date
3 nos of 250 kva T/F insttalation with chemical
earthing,1735 mtr. Reconducting weasel to Dog
conductor. SP-55 pole 16nos.
65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP for
100 kva T/F,Reconducting of 11 kv line 350 mtr.
11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP
for 100 KVA T/F. AB cable laying
1140 mtr.
11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100
KVA T/F charging at no load.Reconducting ACSR
Dog conductor 1540mtr.
rms Program Part -B,PV/8/13
Name of Contr
-
7/27/2019 DPR 15-8-13
52/94
Remark
NL
actor- VVIPL
-
7/27/2019 DPR 15-8-13
53/94
Designat
ion/Cont
act No.
Remark
Restructured Acc
Name of Circle
Name of
Circle
Engineer
Name of
Town/Sit
e visited
DISCOM Activities
Name of Person
interacted with
Acti
Baghpat
Bhanu
Partap
Singh
BARAUT
-
7/27/2019 DPR 15-8-13
54/94
Name of
Town
Status as on today
Erection
workBaghpat
Reconducting of 11 KV line work on progress.
No work because labour holiday
Erection
work
Baraut
1stdivision
LT line work on progress
No work because rain day
Erection
work
Baraut
2nd
division
No work because labour holiday
Erection
workKhekra no work because labour holiday
lerated Power Development and RefoDAILY PROGRESS REPORT OF DATE-6
Contractor Activities
vity
-
7/27/2019 DPR 15-8-13
55/94
Cummulative Status of work till Date
3 nos of 250 kva T/F insttalation with chemical
earthing,1735 mtr. Reconducting weasel to Dog
conductor. SP-55 pole 16nos.
65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP for 100
kva T/F,Reconducting of 11 kv line 350 mtr.
11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP for
100 KVA T/F. AB cable laying 1140 mtr.
11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100
KVA T/F charging at no load.Reconducting ACSR Dog
conductor 1540mtr.
ms Program Part -B,PVV8/13
Name of Con
-
7/27/2019 DPR 15-8-13
56/94
Remark
L
ractor- VVIPL
-
7/27/2019 DPR 15-8-13
57/94
Restructured Accelerated Power DDAILY PRO
Name of Circle
Name of
Circle
Engineer
Name of
Town/Site
visited
DISCOM
Name of Person interacted
with
BaghpatBhanu Partap
SinghBARAUT
-
7/27/2019 DPR 15-8-13
58/94
Designation/C
ontact No. Remark
Name of
Town
Status as on
today
Erection
workBaghpat
Reconducting
of 11 KV line
work on
progress.
No work
because
labour
holida
Erection
work
Baraut 1st
division
ew o
KV line work
on progress.
6 Span of
Erection
work
Baraut 2nd
division
No work
because labour
holiday
Erection
workKhekra
Abcable are
stringing i.e.
500 mtr.
velopment and Reforms Program Part -B,PGRESS REPORT OF DATE-7/8/13Activities Contractor Activities
Activity
-
7/27/2019 DPR 15-8-13
59/94
Cummulative
Status ofwork till Date
Remark
3 nos of 250
kva T/F
insttalation
with chemical
earthing,1735
mtr.
Reconducting
weasel to Donos o -
33 pole, 5 nos
of SP-55,5 nos
of DP for 100
11 v ne 300
mtr.,122 nos of
pole SP-33,23
nos DP for 100
KVA T/F.
AB cable .
km,1 nos of250 KVAT/F
& 1 nos 100
KVA T/F
charging at no
VNL
Name of Contractor- VVIPL
-
7/27/2019 DPR 15-8-13
60/94
Designat
ion/Cont
act No.
Remark
Baghpat
Bhanu
Partap
Singh
Restructured Acceler
Name of Circle
Name of
Circle
Engineer
Name of
Town/Site
visited
DISCOM Activities
Name of Person
interacted with
Acti
-
7/27/2019 DPR 15-8-13
61/94
Name of
Town
Status as on today
Erection
workBaghpat
Reconducting of 11 KV line work on progress.
No work because labour holiday
Erectionwork
Baraut
1st
division
New of 11 KV line work on progress.No work due to raining day.
Erection
work
Baraut
2nd
division
No work because labour holiday
Erection
workKhekra No work due to raining day
ted Power Development and ReformsDAILY PROGRESS REPORT OF DATE-8/8/13
Contractor Activities
vity
-
7/27/2019 DPR 15-8-13
62/94
Cummulative Status of work till Date
3 nos of 250 kva T/F insttalation with chemical
earthing,1735 mtr. Reconducting weasel to Dog
conductor. SP-55 pole 16nos.
65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP
for 100 kva T/F,
Reconducting of 11 kv line 350 mtr.
11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP
for 100 KVA T/F. AB cable laying
1140 mtr.
11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100KVA T/F charging at no load.Reconducting ACSR
Dog conductor 1540mtr.
Program Part -B,PVVN
Name of Con
-
7/27/2019 DPR 15-8-13
63/94
Remark
tractor- VVIPL
-
7/27/2019 DPR 15-8-13
64/94
Designat
ion/Cont
act No.
Remark
Baghpat
Bhanu
Partap
Singh
Restructured Accele
Name of Circle
Name of
Circle
Engineer
Name of
Town/Sit
e visited
DISCOM Activities
Name of Person
interacted with
Acti
-
7/27/2019 DPR 15-8-13
65/94
Name of
Town
Status as on today
Erection
workBaghpat
Reconducting of 11 KV line work on progress.
No work because labour holiday
Eid festival
Erectionwork
Baraut
1st
division
No work because Eid festival
Erection
work
Baraut
2nd
division
No work because Eid festival
Erection
workKhekra No work because Eid festival
ated Power Development and ReforDAILY PROGRESS REPORT OF DATE-9/8/1
Contractor Activities
vity
-
7/27/2019 DPR 15-8-13
66/94
Cummulative Status of work till Date
3 nos of 250 kva T/F insttalation with chemical
earthing,1735 mtr. Reconducting weasel to Dog
conductor. SP-55 pole 16nos.
65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP
for 100 kva T/F,
Reconducting of 11 kv line 350 mtr.
11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP
for 100 KVA T/F. AB cable laying
1140 mtr.
11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100KVA T/F charging at no load.Reconducting ACSR
Dog conductor 1540mtr.
s Program Part -B,PVV3
Name of Con
-
7/27/2019 DPR 15-8-13
67/94
Remark
L
tractor- VVIPL
-
7/27/2019 DPR 15-8-13
68/94
Designat
ion/Cont
act No.
Remark
Baghpat
Bhanu
Partap
Singh
BARAUT
Restructured Accel
Name of Circle
Name of
Circle
Engineer
Name of Town/Site
visited
DISCOM Activities
Name of Person
interacted with
-
7/27/2019 DPR 15-8-13
69/94
Name of
Town
Status as on today
Erection
workBaghpat
Reconducting of 11 KV line work on progress.
No work because labour holiday
Erectionwork
Baraut
1st
division
LT line work on progress.10 span of AB cable 95 sq mm i.e. 400 mtr.
Erection
work
Baraut
2nd
division
No work because labour holiday
Erection
workKhekra Abcable are stringing i.e. 350 mtr.
erated Power Development and Reforms PDAILY PROGRESS REPORT OF DATE-10/8/13
Contractor Activities
Activity
-
7/27/2019 DPR 15-8-13
70/94
Cummulative Status of work till Date
3 nos of 250 kva T/F insttalation with chemical
earthing,1735 mtr. Reconducting weasel to Dog
conductor. SP-55 pole 16nos.
65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP
for 100 kva T/F,Reconducting of 11 kv line 350 mtr.
95 sq mm AB cable 400 mtr.
11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP
for 100 KVA T/F. AB cable laying
1140 mtr.
11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100KVA T/F charging at no load.Reconducting ACSR
Dog conductor 1540mtr.
95 sq mm AB cable stringing 850 mtr.
ogram Part -B,PVVNL
Name of Con
-
7/27/2019 DPR 15-8-13
71/94
Remark
tractor- VVIPL
-
7/27/2019 DPR 15-8-13
72/94
Designat
ion/Cont
act No.
Remark
Baghpat
Bhanu
Partap
Singh
Restructured Accelera
Name of Circle
Name of
Circle
Engineer
Name of
Town/Site visited
DISCOM Activities
Name of Person
interacted with
Acti
-
7/27/2019 DPR 15-8-13
73/94
Name of
Town
Status as on today
Erection
workBaghpat
Reconducting of 11 KV line work on progress.
No work because labour holiday
Erectionwork
Baraut
1st
division
New of 11 KV line work on progress.Material shifted to main store Baghpat
Erection
work
Baraut
2nd
division
No work because labour holiday
Erection
workKhekra 4 nos of SP-33 9 mtr. Pole are erected at site.
ed Power Development and ReformsDAILY PROGRESS REPORT OF DATE-11/8/13
Contractor Activities
vity
-
7/27/2019 DPR 15-8-13
74/94
Cummulative Status of work till Date
3 nos of 250 kva T/F insttalation with chemical
earthing,1735 mtr. Reconducting weasel to Dog
conductor. SP-55 pole 16nos.
65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP
for 100 kva T/F,
Reconducting of 11 kv line 350 mtr.
11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP
for 100 KVA T/F. AB cable laying
1140 mtr.
11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100KVA T/F charging at no load.Reconducting ACSR
Dog conductor 1540mtr.
SP=33 pole:-14
rogram Part -B,PVVNL
Name of Con
-
7/27/2019 DPR 15-8-13
75/94
Remark
tractor- VVIPL
-
7/27/2019 DPR 15-8-13
76/94
Name of CircleName of Circle
Engineer
Name of Town/Site
visited Name
Baghpat Bhanu Partap Singh KhekraBaghpat
-
7/27/2019 DPR 15-8-13
77/94
Designation/Contact No.
Restruct
DISCOM Activit
of Person interacted with
Mr. DK Garg SE/9412749205
-
7/27/2019 DPR 15-8-13
78/94
Remark
Erection work
Erection work
Erection work
Erection work
red Accelerated Power Development and ReDAILY PROGRESS REPORT OF DAT
es
Activity
to meet sir,Discuss the status of R-APDRP work.
& Photo copy of invoice Bill but the accountant Mr. Rajive
are goes to meerut.
-
7/27/2019 DPR 15-8-13
79/94
Name of Town Status as on today
Baghpat No work because labour holiday
Baraut 1st division 8 nos of SP-33 pole are erected at site
Baraut 2nd division No work because labour holiday
Khekra 500 mtr. AB cable are stringing
forms Program Part -B,PVVNL-12/8/13
Contractor Activities
-
7/27/2019 DPR 15-8-13
80/94
Cummulative Status of work till Date
3 nos of 250 kva T/F insttalation with chemical
earthing,1735 mtr. Reconducting weasel to Dog
conductor. SP-55 pole 16nos.
73 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP
for 100 kva T/F,
Reconducting of 11 kv line 350 mtr.
11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP
for 100 KVA T/F.
AB cable laying 3 km
11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100
KVA T/F charging at no load.Reconducting ACSR
Dog conductor 1540mtr.
SP=33 pole:-1495 sq mmAB cable :- 2km
Name of Con
-
7/27/2019 DPR 15-8-13
81/94
Remark
tractor- VVIPL
-
7/27/2019 DPR 15-8-13
82/94
Designation/Contact
No.
Baghpat
Bhanu
Partap
Singh
Baraut
Baghpat
Name of Circle
Name of
Circle
Engineer
Name of
Town/Sit
e visited
Name of Person
interacted with
-
7/27/2019 DPR 15-8-13
83/94
Remark
go SE office & send the copy of invoice bill.
Restructured Accelerated PowDAIL
DISCOM Activities
-
7/27/2019 DPR 15-8-13
84/94
Name of Town
Erection work Baghpat
Erection work Baraut 1st division
Erection work Baraut 2nd division
Erection work Khekra
r Development and Reforms PPROGRESS REPORT OF DATE-13/8/13
Contractor Activiti
Activity
-
7/27/2019 DPR 15-8-13
85/94
Status as on today
8 span of Reconducting i.e. 470mtr.
6 nos of SP-33 pole are erected at site.
AB cable laying 500 mtr.
No work because labour holiday
500 mtr. AB cable are stringing
ogram Part -B,PVVNL
es
-
7/27/2019 DPR 15-8-13
86/94
Cummulative Status of work till Date
3 nos of 250 kva T/F insttalation with chemical
earthing,2205 mtr. Reconducting weasel to Dog
conductor. SP-55 pole 16nos.
79 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP for 100kva T/F,
Reconducting of 11 kv line 350 mtr.
95 sq mm AB cable :- 2 km
11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP for
100 KVA T/F. AB
cable laying 3 km
11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100 KVA
T/F charging at no load.Reconducting ACSR Dog
conductor 1540mtr.
SP=33 pole:-14 95
sq mmAB cable :- 2.5 km
Name of Contr
-
7/27/2019 DPR 15-8-13
87/94
Remark
actor- VVIPL
-
7/27/2019 DPR 15-8-13
88/94
R
Name of Circle
Name of
Circle
Engineer
Name of
Town/Sit
e visited
Name of Person interacted
with
Baghpat
Bhanu
Partap
Singh
Baraut
BaghpatMr. Arya Naresh
-
7/27/2019 DPR 15-8-13
89/94
Designation/Contact No. Remark
structured Accelerated Power DevelopmeDAILY PROGRESS REP
DISCOM Activities
JE/9412749679 to meet sir ,discuss the progress of work .
-
7/27/2019 DPR 15-8-13
90/94
Name of Town Status as on today
Erection work BaghpatNo work because labour
holiday
Erection work Baraut 1st division
4 nos of SP-33 pole are
erected at site.AB cable laying 500 mtr.
Erection work Baraut 2nd divisionNo work because labour
holiday
Erection work Khekra500 mtr. AB cable are
stringing
t and Reforms Program Part -B,PRT OF DATE-14/8/13
Contractor Activities
Activity
-
7/27/2019 DPR 15-8-13
91/94
Cummulative Status of work till
DateRemark
3 nos of 250 kva T/F insttalation
with chemical earthing,2205 mtr.
Reconducting weasel to Dog
conductor. SP-55 pole 16nos.
83 nos of SP-33 pole, 5 nos of SP-
55,5 nos of DP for 100 kva T/F,
Reconducting of 11 kv line 350 mtr.
95 sq mm AB cable :- 2.5km
11 kv line 300 mtr.,122 nos of pole SP-
33,23 nos DP for 100 KVA T/F.
AB cable laying 3 km
11kv line 2.5 km,1 nos of 250
KVAT/F & 1 nos 100 KVA T/F
charging at no load.Reconducting
ACSR Dog conductor 1540mtr.
SP=33 pole:-14
95 sq mmAB cable :- 3 km
VVNL
Name of Contractor- VVIPL
-
7/27/2019 DPR 15-8-13
92/94
Designat
ion/Cont
act No.
Remark
Restructured Accelerated
Name of Circle
Name of
Circle
Engineer
Name of
Town/Sit
e visited
DISCOM Activities
Name of Person
interacted with
BaghpatBhanuPartap
Singh
-
7/27/2019 DPR 15-8-13
93/94
Name of Town Status as on today
Erection work Baghpat No work because labour holiday
Erection work Baraut 1st division No work because labour holiday
Erection work Baraut 2nd division No work because labour holiday
Erection work Khekra Independent holiday
Power Development and Reforms PrograDAILY PROGRESS REPORT OF DATE-15/8/13
Contractor Activities
Activity
-
7/27/2019 DPR 15-8-13
94/94
Cummulative Status of work till
Date
Remark
3 nos of 250 kva T/F insttalation
with chemical earthing,2205 mtr.
Reconducting weasel to Dog
conductor. SP-55 pole 16nos.
79 nos of SP-33 pole, 5 nos of SP-
55,5 nos of DP for 100 kva T/F,
Reconducting of 11 kv line 350 mtr.
95 sq mm AB cable :- 2 km
11 kv line 300 mtr.,122 nos of pole
SP-33,23 nos DP for 100 KVA T/F.
AB cable laying 3 km
11kv line 2.5 km,1 nos of 250
KVAT/F & 1 nos 100 KVA T/F
charging at no load.Reconducting
ACSR Dog conductor 1540mtr.
SP=33 pole:-1495 sq mmAB cable :- 2.5 km
Part -B,PVVNL
Name of Contractor- VVIPL