NAINITAL DUDGH UTPADAK SAHAKARI SANGH LtdLALKUA (NAINITAL

Page 2: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

NAINITAL DUDGH UTPADAK SAHAKARI SANGH LtdLALKUA (NAINITAL)

Tender Notice no 3066-71/P&I/DPMCU/2019-20 Date 24/01/2020

Tender Document For

SUPPLY OF D.P.M.CU.FOR MILK SOCITY

N.D.U.S.S. Lalkua NaninitalPhone no.-: (05945)268061, 268309

Page 3: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

NAINITAL DUDGH UTPADAK SAHAKARI SANGH LtdLALKUA NAINITAL (U.A)

Tender Schedule/Tender : Copy to submit with all pages to NDUSS

Lalkua. ( Nainital).

Comprehensive BID For : SUPPLY OF SUPPLY OF D.P.M.CU.FOR MILK SOCITY N.D.U.S.S.LTD .LALKUAN

NAINITAL

Tender Reference ;-

Last Date & Time for Receipt : 03.02.2020, 2;00 PMOf Tender Bids

Time & Date of Opening of

Tender Bids : 03.02.2020 2.30PM

Place of Opening of Tender Bids : Office of the General Manager

Nainital Dugdh Utpadak Sahakari sangh

Ltd Lalkua (Nainital)

Sold to : : …………………………………….

……………………………………..

……………………………

Page 4: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

Special Conditions

1. No page of the tender shall be removed and the entire set must be submitted, failing which May result in rejection of the tender.2. All entries by the tenderer should be in one ink and should be written legibly. The tender should not contain erosions if any, they should bear the dated initials of the tendere, each page of the tender must be signed by the tenderer.3. Rates of the items, in the bill of the quantities, should be written by the tenderer, both in figures as well as in words. In case of difference in the rates entered, the lowest quoted rate, out of the two, shall only be considered. The tender shall be accepted on the item rate basis and payment will be made on measured work basis for the executed work. 4. For any work partly done, payment shall be made at proportionately reduced rate as per assessment of the engineer in-charge. 5. The tenderers should take into account all fluctuations of the market as no claim shall be entertained on this ground during the acceptance of the tender and the currency of the contract. 6. The tendered rate shall be deemed for the completed item of work in all respects and shall include all tools and plants, packing and forwarding, insurance, railway freight, carriage of materials to site, stacking and removal charges of any rejected materials, Zila Panchayat and Municipal Taxes, Octroi, GST and Excise Duty and all other taxes in force from time to time.7. In case of firms, the tender must be signed by the partners or by the person holding power of attorney on behalf of the firm. In the later case a only attested copy of the power of attorney must be attached with the tender.8. The tenderer should fill in all blank spaces meant to be filled in. Tenders are liable to be rejected if this is not complied with.9. The tenderer should write their full address on the tender form.10.The tenders are to be addressed to Nainital Dugdh utpadak sahakari sangh Ltd Lalkua (Nainital)" and should be submitted in sealed cover with the name of the tender notice and name of the work on the cover. The sealed cover should also bear the name and address of the tendrer. The tenders should be sent by the registered post/ speed post/ courier in double sealed covers. Nainital Dugdh utpadak sahakari sangh Ltd Lalkua will not accept any excuse for non receipt of tenders due to loss or delay in postal services.11. All the tenders should be submitted in two bid system ie Technical Bid and Financial Bid.12. Incomplete, irrelevant or conditional tenders are liable to be rejected. Tenders not submitted on proper forms will not be considered.13. No additions or alterations are permitted in the tender papers. If any tenderer does so, the tender will not be considered and will be rejected.14. The successful tenderer shall be required to make an agreement with the Nainital Dugdh utpadak sahakari sangh Ltd Lalkua (Nainital) for execution of the work for which the tender has been accepted

Page 5: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

15. Earnest Money Deposit :All bidders should deposit earnest money with the tender as per following details:(a) For cost of work up to Rs. 1.00 Lacks @ 5%(b) For cost of work above Rs. 1.00 Lacks up to 5.00 Lacks @ 4%(c) For cost of work above Rs. 5.00 Lacks up to 25.00 Lacks @ 3%(d) For cost of work above Rs. 25.00 Lacks @ 2%All tender bids should be accompanied by earnest money deposit either in the form of a Demand Draft drawn on any Nationalized Bank in India, Term Deposit Receipt/ Fixed Deposit Receipt, Bankers Cheque issued by any Nationalized Bank in India in favor of Nainital Dugdh utpadak sahakari sangh Ltd Lalkua (Nainital) payable at Lalkua or in form of Bank Guarantee issued by any Nationalized Bank in India or any first class Foreign Bank operating in India. In case of Bank Guarantee, it should be prepared as per the preformed attached with the tender form. In general, the validity of EMD should be 45 days from the last date of validly of the tender , but the period may be extended as per requirements. All bidders may note that EMD submitted in the form of a cheque will not be considered. EMD may also be deposited in the form of cash with the account section of the DUSS and cash receipt should be attached with the tender.Any tender bid which is not accompanied with the Earnest Money Deposit will be summarily rejected and no exemption shall be granted to any of the bidders in this regard. EMD of unsuccessful bidders would be returned within 120 clear days from the date of opening of the tender bids. However, no interest shall be paid on EMD for the period during which it lies with the DUSS. 16. All work shall be executed strictly in accordance with the General Specifications of the equipments.17. The DUSS Lalkuan shall not be responsible for supply of any material.18. When the tender is accepted , the contractor shall have to notify the names of two of his authorized representatives, of whom will have to be always available at the site of the work.19. For steam and water installations, the contractor will have to imply C.I.B.'s licensed persons if he is not a licensed repairer himself.20. Any claim during the periods of contract for extra items etc. will be submitted in writing within a week of such claim having arisen failing which the claim may not be entertained

21. All materials brought for use of the work shall have to get approved by the engineer in charge before actual use.22. Samples of all items of work to be executed will have to be got approved by the engineer in charge, before execution.23. The site will be cleared by the contractor of all surplus or waste material, dirt, debris etc. on completion of the work for which no extra payment will be made.24. The contractor will have to make his arrangements for tools and equipments for all works.25. The total value of the tender should be mentioned in the tender offer appended hereto which has to be submitted along with the tender.26. An attested copy of the latest trade tax registration, service tax registration should be enclosed with the tender.27. The partnership firms should enclose photocopy of the partnership deed and an attested copy of power of attorney for signing the tender etc.28. Charges for erection and commissioning should be indicated clearly, if applicable.

Page 6: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

29. The tenderers are requested to keep their offer open for two months from the date of opening of the tenders. If any tenderer withdraws his tender before the expiry of the said period, the DUSS may allow withdraw but in such case the EMD deposit by the tenderer may be forfeited. If the federation does not allow the withdrawal and accept the tender and the tenderer fails to perform his part of the contract, the EMD deposited by the tenderer shall be liable to be forfeited besides other consequences of breach of contract.30. The tenders should be accompanied by the technical details and drawings of the materials, if applicable.31. If subsequent to the submission of the tender offer, the tenderer alters or modifies contents of his tender, which are not acceptable to the DUSS the tender shall be deemed to have been withdrawal by the tenderer. The usual payment terms are as under-

32. Payment for supply, installation, testing and commissioning contract:(i) 75% payment of the contract/purchase order value after safe receipt of the good at site and material verification at site.(ii) 10% of the contract/purchase order value on completion of the erection commissioning and trail of the equipment. (iii) 15% balance payment of the contract/purchase value ,will be kept against Performance Bank Guarantee, valid for a period of 36 months (Performance Guarantee Period) from the date of successful commissioning of the equipment, issued by any nationalized/private Indian bank or first class foreign bank operating in India. This PBG will be for first year. 5% of this 15% Performance Security will be released after successful performance in the first year. Rest 10% PBG should be valid for second year. 5% of this 10% Performance Security will be released after successful performance in the second year. Balance 5% PBG should be valid for third year. This 5% Performance Security will be released after successful performance in the third year. The performance guarantee may be furnished in the form of account payee Demand Draft/ FDR/TDR/Bank Guarantee in an acceptable form safeguarding the organization’s interest in all respects.

33.0 Any statutory approval from the local government authorities’ viz. Certification from Weight and Measures Department Uttarakhand etc, shall be obtained by the contractor. The bidder shall have to attach with the tender certificates from competent authorities of having similar works done, during previous years.

34.0 Federation has the right to reject any or all the tenders without assigning any reason.

35.0 The bidders are advised to read all conditions carefully and see the site of work before tendering.

General Manager N.D.U.S.S.Lalkua(Nainital)

Page 7: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

General Terms And Conditions

1. The contractor will post a supervisor who should have sufficient knowledge/ experience about the said equipment/job. The supervisor will be assisted by a team of skilled and semi skilled technicians. The team along with the supervisor must remain and work continuously on the site and report for the work within a week of the receipt of the work order, otherwise DUSS will be at liberty to cancel the order, and assign the work to any other party at the cost and risk of the contractor.

2. The contractor may be allowed to work round the clock in the interest of work on written request.

3. The material must be dispatched within the given time after the receipt of work order in minimum number of lots.

4. The contractor will be responsible for timely payment of wages to his workmen latest by 7th day of the following months. In case there is any delay, DUSS would be at liberty to make payment of wages to the workmen on behalf of the contract which will be adjusted from his bills. However this will be in no way reduce the responsibility of contractor for payment of the wages as per the prevailing labor laws in the state to which the contractor will be solely responsible.

5. The contractor will submit fortnightly progress report in the prescribe Performa. The measurement of the work done would be jointly recorded by this supervisor and DUSS site engineer and would be sent it along with the progress report.

6. The work must be completely finished to the entire satisfaction the General Manager, or this representative within a month from the date of receipt of order failing for which penalty will be imposed at the rate of 0.5% per week subject to a maximum of 10% of the total cost of work order. The date of commencement of work shall be such on which the date order is given to the contractor work or it as mentioned in the work order specifically.

7. The contractor shall give all necessary personal superintendence during the execution of the work as long there after DUSS engineer may consider necessary, any direction explanations instruction or notices given by the engineer-in-charge to the supervisor of the contractor shall be treated as there have been given to the contractor himself.

8. The Engineer of the DUSS shall, with approval of the General Manager shall have power to make any alternations or additions to, or substitutions in the original specifications and the contractor shall be bound carry out the work in accordance to the instructions which may be given to him in writing signed by the General Manager.

9. If the contractor or his employee shall break deface or injure or destroy any part of a machine building on which they are working or if any damage shall happen to the machine building while the work is in progress, from any cause whatsoever, the contractor shall make the same good at his own expanses or in default, the engineer of the DUSS may get the repaired at the cost of the contractor and deduct the expenses incurred from his pending bills.

10. The contractor shall be liable to the provisions of any acts/regulations and mat their relating to the workman and acts.

Page 8: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

11. The contractor shall be responsible for all injury to persons or things and for all damages to the structural parts, of properties which may arises from the operations or neglect or himself or any of his subcontractor’s employees. The contractor shall indemnify the DUSS and held them harmless in respect of all and every expenses arising from any such injury or damage to persons or property as foresaid and also in respect of any claim made in respect of injury or damage under any Acts of Govt. or otherwise and also in repeat of award of compensation of damage consequent upon such claim.

12. The Contractor shall indemnify the management whether under the workman’s compensation Act. Or any other attune the currency of in force during the currency of the contract or any `contractor may employee of the contractor or any sub-contractor.

13. The contractor may authorize in writing any employee of the contractor to exercise all or any of the powers vested in him under this contract with intimation to the management in writing.

14. The equipment repaired/supplied by the contractor should be guaranteed by him for satisfactory performance for a period of 12 month from the date of repairs/supplies. You will undertake to repair/replace the defective parts-free of charge in case of defects/faulty operation during the guarantee period.

15. Contractor will submit the design and complete constructor, details with drawings or all equipment etc. before undertaking their fabrication. Provision of future expansion would be kept in all electrical switch boards, control panels etc. You will also submit the layout of electrical cables, piping etc. to be laid in the plant.

16. Arbitration:All disputes or difference in respect of which the decision is not final and conclusive shall on the initiative of either party be referred to the arbitration order section 70,7 of U.P Cooperative society Act 1965 to Milk Commissioner, Uttarakhand.

In the event of awarding sub-contract to any of the parties by the contractor for the manufacture/supply/erection of any parts/spares/components that will be used in the ordered equipment, the contractor must furnish details about his sub-contractors their experience, specialization etc. The sub-contract can be awarded by the contractor only after obtaining written approval by Federation. In the event of sub-contract also the prime fascia responsibility rests on the contractor regarding quality,, quantity guarantee, warranty of the materials supplied/work done by the sub-contractor.

17. The DUSS may at any time, by notice in writing, summarily terminate the contract without compensation to the contractor is adjudge insolvent, in terminate the contract would up voluntarily by the order of count or a receiver or the contractor commits any breach of contract herein specifically provided for.

18. Force majored clause -The terms and conditions mutually agreed upon shall be subject to force Majuro Clause as noted below:“ Neither the contractor nor the DUSS shall be considered in default in performance of its obligations hereunder, if such performance is prevented or delayed because of war hostilities, revolution, civil commotion, strike, earthquake, epidemic, accident fire, wind, flood or because of any law, order proclamation, regulation or ordinance of any government or of any act of god or of any other cause whether of similar or dissimilar nature, beyond the reasonable control of the party affected, should one or both the Majored lasting continuously for a period of six months the two parties should consult each other regarding the future implementation of contract.

General Manager N.D.U.S.S. Lalkua(Nainita

Page 9: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

Technical Specifications:Name of Work : S.I.T.&C. of Data Processor & Milk collection Unit (DPMCU) with Milk

Analyzer

S.N. Description1.0 Functional & Features Requirement1.1 The Unit should be suitable for instant weighing of milk, measuring fat & SNF content,

calculating the amount payable to the member based on fat and/or fat & SNF weight, printing the amount calculated thereof with member identification details. The unit shall also be used for maintaining the main records of the collection centre together with the details of milk business transactions of the village co-operative society.

1.2 The unit should be able to measure milk component contents viz. fat from 0.5% to 13% & SNF from 5% to 13% and able to weigh milk up to 200kg. per batch at a time. This should process approximately 70 samples of milk per hour.

1.3 DPMCU must send data to a central dairy server via TCP/IP/GPRS or through web service1.4 Farmer wise Data is required as an individual milk sample as well as in Summary1.5 Each Machine must have 16 digit long machine ID attached to each datum1.6 All settings (Machine ID, Rates, APN, IP & Port to which it sends Data) of the machine must

be changeable through SMS or Server Based Communication and must be password protected on the hardware

1.7 Machine must not skip sending any data to the server1.8 Machines must not be sending any wrong or Corrupt Data1.9 Queue Management - Machine must wait to receive “OK” reply form server for previous data

before sending next data to the server. However, it must not stop the operations and must continue receiving the data from other farmers. The data must be stored and sent whenever the reply is received or net work is available.

1.10 Machine must store at least 2 years - 2 shift - 1000 members data in DPMCU1.11 Data must not be lost even in case of power failure. When the power is restored, the machine

must be sending data which has not been yet sent to the server.1.121.1 For, Any change in setting manually in the DPMCU, a SMS must be sent to the System

Administrator or communication to server.2.0 Design & Other requirements:2.1 Operating Environment:

All the components to the DPMCU should be rugged and must operate in dusty, hot and humid village environment where power outages and supply fluctuation are frequent. The operators may not be skilled person and not conversant in using electronic equipment.

Power supply- Voltage :160 to 260±10%volts(AC); 12V (DC)Frequency : 50Hz±3%

Ambient Temperature : 5-50O C Relative Humidity : 50% to 95%

2.2 Operational Provisions:2.2.1 Warranty: All the components included in the DPMCU shall be warranted for 3 years

comprehensive warranty against manufacturing defect. Burnt and broken items are not covered.

2.2.2 Annual maintenance service: Annual maintenance services (AMC) for 2 years (excluding cost of spares) shall be provided after the warranty period of 3 years. Placement of technical at field level for repair and maintenance shall be as under. Burnt & broken item are not covered under AMC. Milk collection center should arrange to send milk analyzer for servicing at the nearest BMCU centre/ chilling center/main factory. In case large area/farthest distance, the supplier should provide servicing at site.

2.2.3 Posting of the technician: During warranty period of 3 years and annual maintenance service period of 2 years, the posting of the technician will be as under:

DPMCU installed(nos)< 40 to be attended within 48 hoursDPMCU installed(nos)> 40 and up to 70-posting of one technicianThereafter one technician per addition of 70 DPMCU

Page 10: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

2.2.4 Training: Comprehensive training for 1 day in class room. Hands-on training for 2 shifts of milk collection on all operational aspects of the milk

analyzer and other DPMCU components to DCS staff and other officers of the EIA. Between 1st & 2nd month of installation refresher training in group shall be imparted at

a nodal location.The training space, lodging, boarding etc. all other expenses will be born and arrange by EIA.

2.2.5 Operational & cleaning SOPs-Provide laminated wall chart indicating important steps involved in operation & cleaning of the milk analyzer for displaying in DCS.

3.0 Configuration of DPMCU:Depending on the requirement of dairy cooperative societies the preferred configuration of DPMCU will be as following -

TECHNICAL SPECIFICATION OF DPMCU3.0 DATA PROCESSOR UNITS. No. Particulars Stated specification3.1 Operational

RequirementProvision of import /sending of producer master, rate chart data from/to dairy central server online through GPRS/cloud based technology as well as offline through pen-drive (USB/Serial/Smart card). To accept data from electronic weighing machine, milk analyzer after entering the milk producer code number manually.Data transfer from DPU through GPRS as well as through pen drive (USB/Serial) to other computer through a customized utility software.Reports as under:

1. Producer slip in local language Hindi & English with configuration I for Hindi & II in English.

2. Shift end summary on Minimum 40 column format in English/local language Hindi

3. Dispatch slip, local sale, payment registers & member listing in English/ local language Hindi with configuration I & II.

Customized reports as per DUSS requirement with possible inputs. Entering of milk rate chart by key board or pen drive (USB/Serial). Two sets of rate charts (Buffalo & cow both), one for current & other as “effective from date”. Rate chart type to support- fat; & SNF Data back up through smart card or through data logger of on external SD card or through removable internal SD Card. Data of producer to be stored through key board or through smart card or pen drive. Able to catch edit history with milk collection audit trail. Input services data entry and storage. To develop, if any additional report required by purchaser

3.2 Technology Microcontroller based, Real Time operating System, Advance GPRS/cloud based system for TCP & FTP data.

3.3 Display LCD 4 Line/20 character or higher3.4 Memory 2 GB SD Card. 14,60,000 records, 2 yr. data storage for 1000

member.3.5 RS-232 Interface For milk analyzer, electronic weigh scale, remote display unit,

DMP/other suitable printers & pen drive.3.6 Environment 5-50 Deg C, 95% RH, Village Dusty environment, Housing made

of SS-304

Page 11: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

3.7 Printer In Built Thermal Printer with DPU should be quoted & provided with DPU. It should be suitable for minimum 55 mm wide paper. Extra Interface should also be provided for future addition of external 9 pin 40 columns Dot Matrix printer if required.

3.8 Power supply 230 V AC, 50Hz; 12 V DC input.3.9 Key Board 5x4 Membrane/Matrix type and PC keyboard. 3.10 Real time clock Inbuilt3.11 Consumables &

Accessories with each DPU

Paper role: 55 mm wide, 15 m long- 05 No suitable for Inbuilt Thermal printer.

Power cord 1.5 M with plug top-1 No.power supply lead 1.5 M for printer (SMPS)Data lead 2 M for weigh scale with Rs. 232 connector at both ends.Data lead 2 M for Remote display unit with-232 connector at both ends.Data lead 2 M for Milk analyzer with-232 connector at both ends.Pen drive (Serial/USB)- 3 Nos.Suitable paper holder to hold paper role-1 No.

3.12 Data Transfer To centralized location using GPRS/Cloud based auto push technology

4.0 SPECIFICATION FOR MILK ANALYSERS. No. Particulars SpecificationThe broad minimum specifications for the analyzer are-(Benny Ultra) 4.1 Functional requirement To test & display fat, SNF & added water of sample milk.4.2 Ultrasonic principle based milk analyzer for testing fat, SNF &

added water. Measuring parameters:1- Fat-0.5% to 13% with accuracy+/- 0.1%, with Resolution: 0.01% and repeatability: +/- 0.05%.2- SNF- 5% to 13% with accuracy +/- 0.1%, with Resolution 0.01% and repeatability 0.05%.3- added water- 0% to 90% with accuracy +/- 5%, with resolution: 1% and repeatability 0.5% Measuring cycle – 40 sec. per sampleAverage testing speed- 70 samples/hr

4.3 Operational abilities Mode selection for type of milk- cow, buffalo, mixed/single curve with cleaning, calibration, system error list etc.

4.4 Type Ultrasonic milk analyzer for testing fat, SNF & added water.MOC for enclosure AISI -304 grade Stainless Steel, 0.75mm. thick minimum

4.5 Loose accessories Holding bottom tray for spillage- 1 no. Rs. 232 serial cable- 1 no. A C power cable with plug top-1 no. Measuring mugs- 2 no. Daily cleaning solution- No. of bottle 3(Quantity minimum

200 ml. or equivalent) Weekly cleaning solution- No. of bottle 2(Quantity

minimum 200 ml. or equivalent) or Monthly cleaning solution- No. of bottle 1(Quantity

minimum 200 ml. or equivalent )4.6 Manual Operating manual each in English & preferably local language per

DPMCU supply.4.7 Cleaning The analyzer should be equipped with Automatic and Manual

both cleaning systems.

Page 12: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

5.0 Specifications for electronic weigh scale:S. No. Particulars Specification5.1 Functional requirement The electronically weigh & digital display of milk quantity in kg

in a container.5.2 Capacity 200 kg. 5.3 Least count 20 gm.5.4 Weight accuracy 20 gm as per standards of W &M rules 1987 medium accuracy

class III.5.5 Certification &

stampingDuly certified and stamped by W&M dept. and confirming to IS: 9281(pt 1&2)1979, IS:9281 :1981 AND IS: 9281(pt.4) 1983 as amended up-to-date. The first stamping and required fee will be deposited and done by the bidder. The bidder should arrange first stamping of each scale at site from local weights & measure inspector before installation.

5.6 Display resolution 1/10,000 (accuracy class III)5.7 Load cell Single, IP 67, GRADE SS-304 of certified and approved make5.8 Over load & shock load

protection300% to take impact of loading, with audio (deep) visual indication.

5.9 Platform size 600mm*600mm5.10 Platform material AISI SS 304, 1.6 mm. thick, 150 grit top plate.5.11 Platform under frame

material/designCold rolled steel box of adequate size. Hot dip galvanized after fabrication.

5.12 Indication in display EWS unit

Quantity-7 segment RED LED, 6 digits, minimum 13 mm. height, display for mode of operation-zero , tare, kg/litre, by default litre.

5.13 Display unit mounting Pole mounted type with sturdy base and SS 304, 38 mm.dia, pipe, 1.2m high.SS Body IP 55, Tactile switch keys with feedback response, auto calibration & auto span with drift correction.RS 232 serial port with protocol to meet requirement of IBM compatible.

5.14 Calibration protection & sealing arrangement

Special arrangement to house PCB & sealing arrangement.

Pass word protection at user end.5.15 Load cell cable Load cell cable from platform to display unit with reinforced

heavy duty PVC conduit.5.16 Battery for working on

power failureIn built, 6V capacity minimum for 12 hrs.

5.17 Model approval certificate

Manufacturer to have model approval certificate of Govt. of India (weight & measure unit)

5.18 Litre to kg conversion This facility should be provided.6.0 SPECIFICATION FOR REMOTE DISPLAY UNIT (RDU)S. N. Particulars Specification6.1 Functional requirement To display pourer members milk collected & milk testing and

other selected parameters 6.2 Type Wall mounted type6.3 Display parameters (i)Member’s code-3 digits (ii) Cattle type-1 character,

(iii) milk weight-5 digits (iv) fat %-4 digits;(vi) SNF%-4 digits (vii) rate in Rs-5 digits; (viii) Amount in Rs. 6 digits.

6.4 Interface Rs. 232 / USB Host6.5 Display type 7 bright segments, Red LED , 25 MM.6.6 Labels for display Screen printed 6.7 Environment Dusty, Humid, Preferably housing to be with Rust proof powder

coated metallic.6.8 Connecting cables Minimum 5 m. power cable with plug top, minimum 5m. data

cable with connector at both ends.

Page 13: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh

7.0 SPECIFICATION FOR UPSS. N. Particulars Specification7.1 Functional requirement To give regulated AC power to DPMCU from mains and

attached battery.7.2 Type Line- interactive type7.3 Average output electric

load600 watts minimum

7.4 Back up time (full load) 3-hrs minimum (in one shift)7.5 Out put wave form Quasi sine wave7.6 Capacity 1000 VA7.7 Voltage at input 110-300 V(±10%)7.8 D C voltage bus 12 V7.9 Voltage at output(with

mains as well as with battery) within built AVR

220V+/-10%

7.10 Full protection Inbuilt protection- under /over voltage short-circuit, overload cut off, low battery cut-off, spikes cut-off

7.11 Warning (LED+sound) Low battery & overloads7.12 Input/output frequency 50Hz+/- 3Hz no correction7.13 Output sockets (5 pin) 3*5A with 2 No 6A 4 way junction strip loose.7.14 Noise level < 50 db7.15 Min. Battery size 1 no- 75 Ah.7.16 Battery charging At 110 &300 V with SMPS charger

Boost charging at minimum 7 ABattery overcharge protection

Battery type Industrial tubular low maintenance battery Battery feature Battery level indicatorBattery rating 12 V, 75 AHBattery units 1 No.Battery switch over 3 milli seconds.Charging indicator Battery charging indicator plus low battery /fault indicator to be

provided Battery steel rack Required for one battery.Leads between UPS & Battery Flexible, Cu conductor PVC, Minimum 1 m with plugs at both ends.

7.17 Steel rack for UPS. To keep UPS above floor.7.18 Preferred Make:

UPS- Elnova / IL-Kota/APC/TVSE/ Tata – Liebert/HCL/Microtech/Sukam or équivalents makeBattery- EXIDE/ Kirloskar /Standard- Furukowa /HCL / Prestolite / AMCO- yuasa/Minda/ Amaron or équivalents make

8.0 ULTRASONIC MILK SAMPLE STIRRERS. N. Particulars Specification8.1 Functional requirement To remove air from fresh milk sample by vibrations created in the

water bath before testing of milk. 8.2 Type Table top, Ultrasonic stirrer8.3 Stirrer for Ultrasonic stirrer SS Ball type8.4 Ultrasonic Frequency 20-25 KHz (Variable)8.5 Timer 1-99(Max.) sec selectable8.6 Environment Suitable of dusty/humid village environment, operating

temperature -5 to 50 degree C.8.7 Connecting cables Minimum 1.5 m power cable with plug top.8.8 Complete ready to use Item complete in all respect with required electric/electronic parts,

ready for use at site.8.9 Operating voltage 230 Volts+/- 10, AC, 50Hz and 12 Volts DC8.10 Power consumption As per design

Page 14: ucdfaanchal.orgucdfaanchal.org/uploads/media/342/Tender DPMCU 2020.…  · Web viewnainital dudgh utpadak sahakari sangh ltd. lalkua (nainital. nainital dudgh utpadak sahakari sangh