downtown coming to i-35w: minneapolis 5th st station 7th ... · the orange line will improve access...

2
RIVER MINNESOTA 494 13 Hwy 35W 62 Hwy 94 94 35W 46th St 66th St American Blvd Lake St 98th St Lake St Station 11th St Station 9th St Station 7th St Station 5th St Station 46th St Station 66th St Station 76th St Station American Blvd Station 98th St Station Nicollet Ave Station Burnsville Pkwy Station BLOOMINGTON DOWNTOWN MINNEAPOLIS DOWNTOWN MINNEAPOLIS MINNEAPOLIS BURNSVILLE RICHFIELD metrotransit.org/OrangeLine 612-373-3333 Coming to I-35W: Orange Line 06-104-01-16

Upload: others

Post on 22-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DOWNTOWN Coming to I-35W: MINNEAPOLIS 5th St Station 7th ... · The Orange Line will improve access to 194,000 jobs and 115,000 residents, including 56,000 jobs and 81,000 residents

R I VE R

M I N N E S O T A

494

13Hwy

35W

62Hwy

94

94

35W

46th St

66th St

American Blvd

Lake St

98th St

Lake St Station

11th St Station9th St Station

7th St Station5th St Station

46th St Station

66th St Station

76th St Station

American BlvdStation

98th St Station

Nicollet Ave Station

Burnsville Pkwy Station

BLOOMINGTON

DOWNTOWNMINNEAPOLISDOWNTOWNMINNEAPOLIS

MINNEAPOLIS

BURNSVILLE

RICHFIELD

metrotransit.org/OrangeLine612-373-3333

Coming to I-35W:

Orange Line

06-104-01-16

Page 2: DOWNTOWN Coming to I-35W: MINNEAPOLIS 5th St Station 7th ... · The Orange Line will improve access to 194,000 jobs and 115,000 residents, including 56,000 jobs and 81,000 residents

METRO Orange Line Bus Rapid Transit

A NEW TRANSIT OPTION ON I-35W

The METRO Orange Line Bus Rapid Transit (BRT) project will use roadway improvements, upgraded transit stations and improved bus service to provide fast, frequent and reliable all-day transit service along I-35W. All Orange Line stations will have upgrades in platform ticketing, information technology and customer amenities, benefitting both BRT and express bus customers on I-35W. The 17-mile corridor is the most heavily traveled express bus corridor in the region, with about 14,000 daily rides.

Buses will travel on Marquette and 2nd Avenues in downtown Minneapolis, using congestion-free, transit-only lanes. South of downtown, the Orange Line will provide frequent, limited-stop service to upgraded stations at Lake Street, 46th Street, 66th Street, 76th Street, American Boulevard, 98th Street, Nicollet Avenue and Burnsville Parkway.

As a part of the METRO system, the Orange Line will connect people across the region to job centers, housing options, transit stations and key destinations in the I-35W corridor.

The Orange Line will improve access to 194,000 jobs and 115,000 residents, including 56,000 jobs and 81,000 residents outside of downtown Minneapolis.

ORANGE LINE IMPROVEMENTS

• 17-mile transitway

• 12 transit stations with enhanced amenities

• All-day, reliable, frequent service, seven days a week

• Real-time information at stations

• Accessibility and pedestrian improvements

• Expected to open in 2019

If you would like to be involved with Orange Line planning, or are interested in hearing more about the project at your meeting or event, please contact [email protected], or call 612-349-7409.

Concept Design for Lake Street Station

metrotransit.org/OrangeLine