Transcript
Page 1: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Virtual Design and Construction

Page 2: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Virtual Design & Construction is …

The computer simulation of the architectural definition and assembly of a building project.

BIM(The 3D Model)

Organization

(Bring builders & designers

together in a team)

Process (Creating and

using the model)

Page 3: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Virtual Design and Construction

Build Prototype(s) and Analyze Best Option

Build and ANALYZE a virtual model TWO…THREE times – Reduce project RISK

Predict possible Logistical CONFLICTS

BUILD Cheaper, Faster, Smarter

Page 4: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Why Virtual Design and Construction

Page 5: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Industry Productivity at a Glance

• Frequent Project Cost Overruns

•Frequent Project Schedule Overruns

• Prevalent Change Orders

• Rising Legal Disputes

• Lack of transparency

• Inefficient Current Processes

• Lack of Interoperability

Page 6: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Additional cost of interoperability in the construction industry 2002 (in $millions)

Stakeholder Group Planning, Engineering, Design Phase

Construction Phase

Operation Maintenance Phase

Total Added Cost

Architects & Engineers $1,007.2 $147.0 $15.7 $1,169.8

General Contractors $485.9 $1,265.3 $50.4 $1,801.6

Special Contractors and suppliers

$442.4 $1,762.2 $2,204.6

Owners and Operators $722.8 $898.0 $9,027.2 $10,648.0

Total $2,658.3 $4,072.4 $9,093.3 $15,824.0

Built Sq. Ft. 2002 1.1 billion 1.1 billon 39 billon n/a

Added Cost / Sq. FT. $2.42 / sf $3.7 / sf $0.23 /sf n/a

Source: National Institute for Standards and Technology (Gallaher et. Al 2004)

Page 7: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Purpose of Virtual Design and Construction??

04/08/2023

• PROTECT INVESTMENTS, BANKS, and DEVELOPMENT/GC companies

• Make INFORMED project investment decisions on-time.• REDUCE RISK

• Control cash flow and find optimum for Development Project

• Transparency with Banking Institutions

• Produce EFFECTIVE and EFFICIENT construction projects • Minimize waste, Extra Costs, and Legal Problems

• Used and ALL COMPLEX project WORLD WIDE

Page 8: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Adoption and Industry Trends GSA – General Service Administration

($15.8 Billion Annual Addition Costs)(Largest Owner/Developer in North America)

BIM Mandate from 2007 on all capital projects 2007 – Spatial Plan validation 2008 – Constructability & Energy Analysis 2009– Cost and Schedule

USMC Military BIM mandate in all military development contracts

Owners - North America / Western Europe Airports, Banks, Retail, Hotel Development, Stadiums, Commercial Accepting only candidates with BIM experience

Page 9: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

VDC Advantage

PRICE – eliminate unnecessary costs and find the best option TO BUILD

SCHEDULE – optimize activities and reduce project construction time

CONSTRUCTABILITY ANALYSIS – find and fix errors before they become expensive

TEAM – align with expert VDC Engineers TECHNIQUE – most advanced technology and

process

04/08/2023

Page 10: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

VDC/BIM Case Study CONCEPTUAL ANALYSIS

Page 11: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Conceptual VDC Analysis Process

• Client/ Owner Input• Financing Option• Development Plan – Size (Sq. Ft), Time

Conceptual Model INUPUT

04/08/2023

Time from client/owner feedback to implementation and analysis is significantly less than traditional methods

Repeat for each new conceptual version in order to arrive at optimum.

Page 12: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

3D Parametric Model

Project Specific Cost Database

Location Based Costs Reporting

Automatic Quantity Takeoff

2D Drawing Interpretation

Excel Quantity Data Interpretation

Excel Cost Interpretation and Analysis

4D-5D Cost/Schedule Sequence Simulation

And Analysis

Development of Project Schedules

Project Schedule and Resource Analysis

Page 13: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

2D CAD 3D Model

NOT just a pretty pictureParametric Modeling NOT Rendering

Page 14: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Conceptual Quantity Analysis

ArchitecturalQuantity Takeoff

StructuralQuantity Takeoff

Structural Element Query QTO

Page 15: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Office and Hotel Complex2D 3D 4D (3D + vreme)

Page 16: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Page 17: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Comparative Analysis of Versions

Page 18: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

UPDATES BUDGET & REPORTING

1. CONCEPT DESIGN CHANGES

2. COMPONENT / MATERIAL CHANGES• Flooring (Wood vs. Tile)• Facades (Stone vs. Precast)• Wall Types (Concrete Type)• Finishes

3. COMPARE VERSIONS• Quantites• Project Costs• Project Schedule• Project Cash Flow

Page 19: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

VDC/BIM Case Study DESIGN DEVELOPMENT ANALYSIS

Page 20: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

VDC at the detail level

3D Detailed Modeling (Arch/Structural/MEP) Highly Accurate Model based Quantity Takeoff 3D Collision Detection and Resolution Model Cost Estimating Model Project Scheduling

Page 21: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

3D Detail Modeling

Page 22: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

3D Modeling

2D conversion to 3D

Page 23: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

RDELECTRICAL MODEL

MECHANICAL MODEL

PLUMBING MODEL

STRUCTURAL MODEL

Virtual Construction

Model

B I M

Page 24: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

3D Model Quantity Takeoff

Page 25: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Concrete Columns:

Total: 521

Volume: 1,070 m3

Concrete Slabs:

Total: 68

59,527 m2

22,993 m3

Effective and Precise Quantity Analysis

Page 26: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Effective and Precise Quantity Analysis

Different Element Groups: 112Total Elements: 3,590

Total Area of Ducts: 9,341 m2Total Length of Ducts: 4,428 m

Different Element Groups: 84Total Elements: 1,046

Total Volume of Concrete: 16,178 m3

Different Element Groups: 46Total Elements: 2,726

Total Area of Pipes: 1,179 m2Total Length of Pipes: 3,930 m

Page 27: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

3D Collision Detection and Resolution

Page 28: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Conflict Resolution Process

3D Modeling

Conflict Identification

AnalysisKey Conflict Selection

Conflict Resolution

Page 29: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

MEP Clash Resolution

April 6th, 2009

Conflicts:

Several conflicts between Mechanical elements and Plumbing pipes

A major conflict area

Page 30: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

MEP Clash Coordination

May 6th, 2009

Conflicts:

Zero

Resolution:Re-route the mechanical system

Page 31: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Total Clashes Found

Page 32: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Example of Clashes Found

Page 33: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Example of Clashes Found

Page 34: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Example of Clashes Found

Page 35: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Example of Clashes Found

Page 36: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Walk through model

Page 37: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

5D = 3D + cost+ time3D Based Project Schedule

Page 38: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

MEP Project Schedule

Page 39: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Ciklogrami

Page 40: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Page 41: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Page 42: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Septembar Oktobar

Novembar Decembar

Page 43: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Benefits of 5D analysis

Enhanced Project Plan (accuracy early) Resource loaded cash predictions Optimized Schedule Predictability (buffer, milestones, start, end) Less Conflicts Improved Project Control

Page 44: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

VDC/BIM Case Study PROJECT CONTROL

Page 45: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Page 46: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

CONTROL

Financial Material Degree of completion

– Graphical– Analitical

Page 47: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Daily / Weekly Input

Page 48: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Contractor Overiew

Page 49: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Planned vs. Actual

Page 50: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Planirano vs. Aktuelno

Page 51: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.

Planirano vs. Aktuelno po izvodjacu

Page 52: Virtual Design and Construction

Virtual Design and Construction© Building Explorer, Inc.