![Page 1: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/1.jpg)
Town of WesterlyTown of Westerly
Pavement Improvement PlanPavement Improvement Plan
20092009
![Page 2: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/2.jpg)
Pavement Improvement PlanPavement Improvement Plan
Determine current pavement condition.Determine current pavement condition. Identify and prioritize needed repairs.Identify and prioritize needed repairs. Coordinate with RIDOT projects.Coordinate with RIDOT projects. Assess available funding.Assess available funding. Select repairs to fit budget framework.Select repairs to fit budget framework. Prepare bid documents and advertise.Prepare bid documents and advertise.
![Page 3: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/3.jpg)
Current Pavement ConditionCurrent Pavement Condition
![Page 4: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/4.jpg)
Pavement Management ProgramPavement Management Program
Initial inventory and condition survey Initial inventory and condition survey prepared by Beta Group in 2007.prepared by Beta Group in 2007.
All roads are rated 0-100 with 100 best.All roads are rated 0-100 with 100 best. Database maintained and kept up to date Database maintained and kept up to date
by Engineering Department.by Engineering Department. Software automatically predicts pavement Software automatically predicts pavement
condition based on model of deterioration condition based on model of deterioration over time.over time.
![Page 5: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/5.jpg)
RSR (Road Surface Rating)RSR (Road Surface Rating)
Network RSR = 69
![Page 6: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/6.jpg)
Network Backlog (2009)Network Backlog (2009)Repair MethodRepair Method Length Length
(mi)(mi)Estimated Estimated CostCost
%%
ReclamationReclamation 3.923.92 $1,372,830$1,372,830 2.772.77
Mill & OverlayMill & Overlay 9.529.52 $2,415,781$2,415,781 6.726.72
Level & Level & OverlayOverlay
55.2455.24 $6,321,261$6,321,261 39.0039.00
Crack SealCrack Seal 41.2941.29 $227,191$227,191 29.1529.15
DeferDefer 31.6731.67 $0$0 22.3622.36
TotalTotal 141.65141.65 $10,337,062$10,337,062 100.00100.00
![Page 7: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/7.jpg)
Network Backlog By RepairNetwork Backlog By Repair
Percentage of Backlog
Defer22%
Crack Seal29%
Level & Overlay
39%
Reclamation3%
Mill & Overlay7%
![Page 8: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/8.jpg)
RIDOT Planned ProjectsRIDOT Planned Projects
![Page 9: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/9.jpg)
RIDOT ProjectsRIDOT Projects
![Page 10: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/10.jpg)
RIDOT ProjectsRIDOT Projects Route 91 1R, Contract 1 - High Street Route 91 1R, Contract 1 - High Street
(Route 3) to Larry Hirsch Lane(Route 3) to Larry Hirsch Lane Route 91 1R, Contract 2 – Larry Hirsch Route 91 1R, Contract 2 – Larry Hirsch
Lane to Church St. (Route 216)Lane to Church St. (Route 216) Shore Rd. Resurfacing – Ocean View Shore Rd. Resurfacing – Ocean View
Hwy. to Post Rd.Hwy. to Post Rd. Weekapaug BridgeWeekapaug Bridge Elm St. & Beach St. (Main St. to Clark St.)Elm St. & Beach St. (Main St. to Clark St.) Railroad Ave., Dixon St., & West St.Railroad Ave., Dixon St., & West St.
![Page 11: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/11.jpg)
Available Town FundsAvailable Town Funds
General Fund FY2009 - $450,000General Fund FY2009 - $450,000 Water Fund FY2009 - $750,000Water Fund FY2009 - $750,000
(Transmission Main Project)(Transmission Main Project)
General Fund FY2010General Fund FY2010 - $200,000- $200,000
Total $1,400,000Total $1,400,000
![Page 12: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/12.jpg)
Proposed Town ProjectsProposed Town Projects
![Page 13: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/13.jpg)
Town ProjectsTown Projects
Total = 7.75 Miles
![Page 14: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/14.jpg)
Westerly 2009 ProjectsWesterly 2009 ProjectsGeneral Fund ($650,000 budget)General Fund ($650,000 budget)
Crack Sealing – $50,000 Crack Sealing – $50,000 (Various Roads)(Various Roads)
Level & Overlay - $110,000 Level & Overlay - $110,000 (Pound Rd., Hiscox (Pound Rd., Hiscox Rd. & Wampanoag Ave.)Rd. & Wampanoag Ave.)
Mill & Overlay - $370,000 Mill & Overlay - $370,000 (Bellevue Ave., John St., (Bellevue Ave., John St., Narragansett Ave., Raymond St., & Ward Ave.)Narragansett Ave., Raymond St., & Ward Ave.)
Total - Total - $530,000 est.$530,000 est.
![Page 15: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/15.jpg)
Westerly 2009 ProjectsWesterly 2009 ProjectsWater Fund ($750,000 budget)Water Fund ($750,000 budget)
Mill & Overlay - Mill & Overlay - $460,000 est.$460,000 est.
((Terrapat Dr., Perkins Ave., Pond St., Pierce St., Terrapat Dr., Perkins Ave., Pond St., Pierce St., Industrial Dr., Narragansett Ave., & Summer St.)Industrial Dr., Narragansett Ave., & Summer St.)
![Page 16: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/16.jpg)
2009 Road Improvements2009 Road Improvements
Predicted RSR = 71
![Page 17: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/17.jpg)
RI – LEAP FundsRI – LEAP Funds(Local Equity Aid Program)(Local Equity Aid Program)
$358,000 (Federal) + $150,000 (State) = $358,000 (Federal) + $150,000 (State) = $508,000 Total$508,000 Total
Cross St. Pavement & Sidewalks =Cross St. Pavement & Sidewalks = $525,000 est.$525,000 est.
![Page 18: Town of Westerly Pavement Improvement Plan 2009. Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT](https://reader036.vdocuments.us/reader036/viewer/2022062409/56649ccf5503460f9499b9f9/html5/thumbnails/18.jpg)
Additional Planned ProjectsAdditional Planned Projects Old Hopkinton RoadOld Hopkinton Road Canal St./White Rock Road Canal St./White Rock Road
RehabilitationRehabilitation Bay Street Drainage/Pavement Bay Street Drainage/Pavement
RestorationRestoration Bradford Streetscape ProjectBradford Streetscape Project Misquamicut Drainage ExtensionMisquamicut Drainage Extension Chip Sealing ProgramChip Sealing Program