Technical progress BMEDepartment of Sanitary and Environmental Engineering
Techniques and methods for climate change adaptation for cities (2013-1-HU1-LEO05-09613)
Management meeting22.09.2014.
WP1 – Project managementProject management meetings( 4 partner meetings –
Steering Committee)12.02.2013., 04.04.2014, 06.06.2014. (skype), 22.09.2014
Website : www.3c-project.euThree languagesQuestionairesEvery partner can upload events, newsGallery (documents, photos)No. of visitors: 1394 (19.09.2014)
Quality assuranceEvaluation form (quality control of events, trainings)
Project monitoring by TKA
WP2 – DisseminationÖKOAQUA - YEARLY ASSEMBLY OF
HUNGARIAN WATER ASSICIATION (MAVIZ)~300 Hungarian participants (Water Utilities)Poster presentation questionares are spread (WP3)
WP3 – Analyzing the needs (phase ADAPTATION)Gap analyzes of the current available national
guidelines National Climate Change Strategy
(1st: 2008-2025, 2nd: 2014-2025, look ahead for 2050)EU co-founded program (Operative Program of
Rural and Urban Development: 2014 - 2020) one of the priorities is the adaptation to changing
climate, the creation of this adaptation capacity 1100 billion HUF has been allocated for this programme
Climate AcademyCritical review of legislation
WP3 – Analyzing the needs (phase ADAPTATION)mapping the needs for city administration,
authority and utilities`staff Preparation of questionnaireTarget audiences and way to distribution
ÖKO-AQUA (staff of water utilities and others) Formal letter to mayors (settlements > 5000 PE)
Results: 50 completed (e-mail, regular post, on-line and on-site) 30 from municipalities 11 from water utilities 9 from others (designers, distributors, working in the water
sector)Deliverable report (in Hungarian)
Water Utilities Municipalities
Water Utilities Municipalities
Water Utilities Municipalities
Average (%)
Minimum (%)
Maximum (%)
Median (%)
If having combined sewer system, the energy costs originates from the transport (pumping) and treatment of rainwater runoffs
2020
100
3040
2020
If having separated sewer, the increment of hydraulic load of wastewater treatment plant during rain events
12088
00
200350
15050
Common ratio of infiltrated water and rainwater runoff discharged illegally into the sanitary sewer network
2120
105
4050
2020
Water Utilities Municipalities
Interest in the subject, availability for participation in a training course
WP4 – Localization and small scale testing level 1.HU – pilot project
Responsible partner: EDV ZrtParticipation on training courses (organised by
partner DHI)wrap up workhops – planned for 13-14.October
Setting up of flow meters (NIVUS)