Subtask C: Collaboration with IEA HQ Analytics
Kari Aamodt EspegrenInstitute for Energy Technology (IFE), Kjeller, Norway
Meeting in HIA Annex 30 Global Energy Systems Analysis Jülich, 16-17 September 2010
![Page 2: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/2.jpg)
Sept. 2010 2
Collaboration with IEA HQ Analytics
1. Comparison of input data to energy modelling
2. Subtask C: Collaboration with IEA HQ Analytics• Overview – objectives and proposed approach• Input data required• Cross-border collaborations• Group discussion• Planning session – tasking, timing, deliverables• Next steps
![Page 3: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/3.jpg)
Sept. 2010 3
Comparison of input data for energy system modelling
![Page 4: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/4.jpg)
Sept. 2010 4
Relative investment cost compared to gasoline ICE in 2030
0,9 1,0 1,1 1,2 1,3 1,4 1,5 1,6 1,7 1,8 1,9 2,0
El. battery
Plug in hybrid -gasoline
Plug in hybrid - H2
Diesel
Diesel - hybrid
E85
Gasoline
Gasoline - hybrid
Hydrogen ICE
Hydrogen ICE - hybrid
Hydrogen FCV
Hydrogen FCV -hybrid
CNG
CNG - hybrid
IEA (2009)
US EPA (2007)
Klimakur(2010)
Tseng (2005)
Krzyzanowski(2008)
Endo (2007)
IER (2009)
IFE (2008)
![Page 5: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/5.jpg)
Sept. 2010 5
Example of relative investment cost for H2 vehicles compared to gasoline ICE in 2030
1,00
1,05
1,10
1,15
1,20
1,25
1,30
1,35
1,40
1,45
Hydrogen ICE Hydrogen FCV Hydrogen FCV -hybrid
IFE (2008)
IER (2009)
Endo (2007)
Krzyzanowski(2008)Tseng (2005)
Klimakur (2010)
US EPA (2007)
IEA (2009)
![Page 6: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/6.jpg)
Sept. 2010 6
0,0
1,0
2,0
3,0
4,0
5,0
6,0
El. ba
ttery
Plug
in h
ybrid
- ga
solin
e
Plug
in h
ybrid
- H2
Biodie
sel
Biodie
sel -
hyb
rid
Diese
l
Diese
l - h
ybrid E85
E85 -
hybrid
Gas
oline
Gas
oline
- hy
brid
Hydro
gen IC
E
Hydro
gen IC
E - hy
brid
Hydro
gen F
CV
Hydro
gen F
CV - hy
brid
CNG
CNG - h
ybrid
IFE
IER
Endo
Krzyzanow ski
Tseng
Comparison of efficiency ratio
![Page 7: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/7.jpg)
Sept. 2010 7
![Page 8: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/8.jpg)
Sept. 2010 8
Collaboration with IEA HQ Analytics
• Overview – objectives and proposed approach• Input data required• Cross-border collaborations• Group discussion• Planning session – tasking, timing, deliverables• Next steps
![Page 9: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/9.jpg)
Sept. 2010 9
Objective of Subtask C
• Cooperate with IEA HQ to be able to establish a common platform/interface with reliable data
Cooperation will be based on:• Knowledge• References, sources of information • Dialog • Open – transparent
![Page 10: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/10.jpg)
Sept. 2010 10
IEA analytic reports
• World Energy Outlook, which goes to 2030
• Energy Technology Perspectives, builds on the WEO and goes to 2050.
![Page 11: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/11.jpg)
Sept. 2010 11
Description of the work in 7 steps
1. Subtask C leader + selected team of experts will meet the HQ experts• Understand the working process of producing WEO and
ETP• Clarify how decisions are made on technologies to be
included in reports, how technologies are introduced and how data is managed.
2. Subtask C leader and experts will discuss with subtask B leader• Data format and updates
![Page 12: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/12.jpg)
Sept. 2010 12
Description of the work in 7 steps
3. Gap analysis and data evaluation• Compare data from HQ experts and Subtask B to find H2
resources and H2 technologies that match each other and where differences exist
• Data evaluation (same or different data source?)• Specify which data from subtask B need to be adapted
4. Subtask C leader and experts will draft two proposals:• Collaboration process proposal (Describes how HIA and
HQ experts could cooperate)• Data management proposal
![Page 13: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/13.jpg)
Sept. 2010 13
Description of the work in 7 steps
5. Separate meetings with representatives from HIA ExCo, subtask B leader and HQ experts• Review the collaboration process proposal and the data
management proposal
6. Subtask C team of experts will revise the collaboration process and the data management proposal• Consider all criticism
• Describe a unified picture
7. A common meeting with HIA ExCo, the leaders of subtask A, B and C and the HQ experts will review the revision and decide on final version. Differences will be clarified.
![Page 14: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/14.jpg)
Sept. 2010 14
Contact with IEA
WEO• Contact: Ms. Maria Argiri (presented at the Analysis
Definition Meeting last November in Seville)
• Meeting between November and April-May. We would propose a meeting in November/December this year.
![Page 15: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/15.jpg)
Sept. 2010 15
Contact with IEA, cont.ETP• Contacts: Dr. Uwe Remme, Dr. Lew Fulton and Mr.
David Elzinga
• Dr. Fulton: Transport, Energy and CO2 report.• An updated version of the database originally used to produce
Prospects for Hydrogen and Fuel Cells.
• Division Head Mr. Taylor expects to hire a new lead modeler (replace Dolf Gielen) - expected to start work early in 2011. Subtask C will meet with the new modeler.
![Page 16: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/16.jpg)
Sept. 2010 16
The expected outcome of Task 30
• Work products will include authoritative, refereed journal articles
• Traditional IEA subtask and task reports • Update IEA “Prospects for Hydrogen and Fuel Cells,”
report (with input from other Annexes or Tasks) • Collaboration with IEA products: World Energy
Outlook (WEO) & Energy Technology Perspectives (ETP)
• Private and public Task websites
![Page 17: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/17.jpg)
Sept. 2010 17
Draft schedule
![Page 18: Subtask C: Collaboration with IEA HQ Analytics Kari Aamodt Espegren Institute for Energy Technology (IFE), Kjeller, Norway Meeting in HIA Annex 30 Global](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f435503460f94c64220/html5/thumbnails/18.jpg)
Sept. 2010 18
Group discussion• We need a group of experts
• Who will contribute?
• Where do we start? What are most important?• Resource availability?• Technology development?• Transportation or stationary applications?
• Milestones and deliverables• Meetings with IEA HQ• Subtask C meetings• Meeting with Subtask B leader