Transcript
Page 1: SECTION 9 CURTAIN WALL ROCK PANEL DETAIL · key plan 08/01/2018 21:49:48 as indicated dt175 tds music centre project detail sheet 1 a131 nabil ghnewa jim roche jim roche jim roche

9MM SUSPENDED ROCK PANNEL MECHANICALLY FIXED TO ALUMINIUM SUPPORTS , ABUTMENT VERTICAL JOINT

REINZINC REVEAL PANNEL RAIN SCREEN FIXED BACK TO 2OOMMCLT WALL WITH Z-BRACKETS WITH INTERMEDIATE ARMADILLOSTRUCTURAL THERMAL BREAKS OR (E/A).

200MM GUTEX VAPOUR PERMEABLE GUTEX IINSUALTION BOARD WITH VAPOUR CONTROLLAYER FIXED TO INSULATION WITH MUSHROOM FIXINGS

VAPOUR PERMEABLE MEMBRANE

KLH 200MM CLT WALL OR (E/A) TO BE INTALLED TO MANUFACTURERS SPECIFICATION.

SA

9MM SUSPENDED ROCK PANNEL MECHANICALLY FIXED TO ALUMINIUM SUPPORTS , ABUTMENT VERTICAL JOINT

SCHUCO THERMALLY BROKEN EXTERNAL GLAZING

GALVINIZED STEEL ANGLE BRACKET

ROCKWOOL OR (E/A) THERMAL INSULATION CAVITY BATT FIRE STOP

VAPOUR PERMEABLE MEMBRANE

57

202

219

30016526

INSECT MESH

75

75

365

50MM SAND BLINDING

NECOFLEX DPM/ RADON OR(E/A) MEMBRANE WRAPPED AROUND INSULATION TO PROTECT FROM MOISTURE PENETRATION.

SA.

SCHUCO DOUBLE GLAZED OR (E/A) CURTAIN WALLING SYSTEM FIXED BACK TO KLH 300X300MM CLT COLUMN WITH GALVINISED STEEL ANGLE BRACKETS

75MM ROAD STONE PERMEABLE PAVING ON 75MM DRAINAGE MATT ON 100MM STONE MIX/AGGRIGATE ON 300MM HARD CORE

200MM KINGSPAN XPS INSULATION OR (E/A)

COMPACFOAM COMPACT FOAM OR (E/A) FIXED TO XPS TO CREATE SURFACE TO BUTT THE BOTTOM TRANSOM OF CURTAIN WALLING AND CONTINUE TO SEAL THE THERMAL ENVELOPE.

100MM STONE MIX/AGGRIGATE ON 300MM HARD CORE

25MM SHERA PLANK FIBRE CEMENT BOARD OR (E/A)STUCK TO DPM WRAPPED COMPACT FOAM

GL

REINZINC REVEAL PANNEL RAIN SCREEN FIXED BACK TO 2OOMMCLT WALL WITH Z-BRACKETS WITH INTERMEDIATE ARMADILLOSTRUCTURAL THERMAL BREAKS OR (E/A).

SCHUCO AWS 120 DOUBLE GLAZEDARGON GAS FILLED ECO WINDOWWITH INTEGRATED SHADING

9MM SUSPENDED ROCK PANNEL MECHANICALLY FIXED TO ALUMINIUM SUPPORTS , ABUTMENT VERTICAL JOINT

SUPREMA CLIP ON POWDER COATED ALUMINIUM ROOF COPING FIXED ON TO INSULATION OR (E/A).

SCHUCO DOUBLE GLAZED OR (E/A) CURTAIN WALLING SYSTEM FIXED BACK TO KLH 300X300MM CLT COLUMN WITH GALVINISED STEEL ANGLE BRACKETS

9MM CRUSHED BASALT ROCK PANNEL RAINSCREEN FIXED TO POWDER COATED ALUMINIUM VERTICAL RAIL FIXED BACKTO POWDER COATED ALUMINIUML-BRACKET WITH INTERMEDIATE THERMAL BREAK OR (E/A).

GLU-LAM BEAM STRUCTURESUPPORTING VIERENDEELCLT WALL STRUCTURE HUNG FROM CLT AUDITORIUM.

Checked byDesigned By Approved By - Date

Project Address/Coordinates

Scale

Project Name

Sheet Name

Rev No Rev Note Date/Time North Checked

1 2 3 4 5 6 7 8 9 10 11 12 13

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

Nabil Ghnewa C13470042 DT175 02 2017

Sheet Number

Naul Village Dublin53.586°N 6.290°W

14

LEGEND

GENERAL DESIGN NOTES

KEY PLAN

08/01/2018 21:49:48

As indicated

DT175 TDS MusicCentre Project

DETAIL SHEET 1

A131

NABIL GHNEWA JIM ROCHE JIM ROCHE

JIM ROCHE

1 : 10

CANTILEVER CORNER DETAIL TO 1ST FLOOR

EXTERIOR EAST

1 : 10

SECTION 9 CURTAIN WALL ROCK PANEL DETAIL

1 : 10

GROUND FLOOR FOUNDATION DETAIL

BAUDER BIODIVERSE ROOFPRODUCT SPECIFICATION

POSI GLAZE FRAMELESS GLASSBALUSTRADE GUIDE

KLH CLT SPECIFICATION GUIDE

FIRE PIPE COLLARB150

GUTEX MULTITHERM

ROCK PANNEL INSTALLATION GUIDE

INSULATED SUSPENDED CEILING

RHEINZINK REVEAL PANNEL GUIDE

1

2

3

4

5

6

7

8

CLT TO BE FITTED TO MANUFACTURERS SPECIFICATION UTILISING GLVINIZED STEEL BRACKETS. EACH PANNEL RESTING ON CONCRETEKICKER TO HAVE LAYER ON DPC UNDERNEATH TO PROVENT RISING DAMP FROMENTERING THE STRUCTURE.

GUTEX WALL WOOD FIBRE BOARD

FOLLOWING ON-CENTRE DISTANCES APPLY:40 MM BOARD THICKNESS → MAX. ON-CENTRE IS 62.5 CM60 - 200 MM BOARD THICKNESS → MAX. ON-CENTRE IS 83.5 CM

ALL MEMBRANES ARE TO BE TAPED AND PIPES THAT PUNCTURE THROUGHTHE MEMBRANES ARE TO BE SEALED WITH MANUFACTURERS SUPPLIEDTAPE TO ENSURE CONTINUITY AIR AND WATER TIGHTNESS AT ROOF LEVEL.

ALL PERFERATIONS THROUGH VAPOUR PERMEABLE MEMBRANE ARE TOBE TAPED TO ENSURE INTEGRITY OF MEMBRANE AND VAPOUR DIFFUSION RATE.

WINDOW FRAME TO HAVE PLASTIC THERMAL BREAK PACKER BETWEEN ALUMINIUM FRAME AND CLT WALL TO PREVENT POTENCIAL CONDINSATIONOCCURENCE BETWEEN BOTH MATERIALS WITH WIND PROOF TAPE TO BE APPLIEDTO PREVENT THERMAL BRIDGING.

TAPRED PIR IS TO BE INTALLED TO MANUFACTURERS SPECIFICATION AND AT A FALLOF 1:80.

SUSPENDED ACOUSTIC CEILING PANNELS ARE TO BE HUNG LEVEL IN ACCOURDANCETO MANUFACTURERS SPECIFICATION.

FIRE COLLARS ARE REQUIRED FOR EVERY PIPE THAT MAY PENETRATE A FLOOROR WALL. FIRE COLLARS SUPPLIED WITH DIFFERENT SIZES DEPENDING ON PIPESIZE ARE TO FITTED TO MANUFACURERS SPECIFICATION.

ALUMINIUM RAIN WATER PIPES THAT ARE TAKEN THROUGH THE BUILDING MUST BE INSULATED AND HIDDEN BEHIND THIN CLT WALL TO MAINTAIN CONTINUITYIN THE AESTHETIC EFFECT AND CONTRIBUTE TO THERMAL MASS EFFECT.

WHEN INSTALLING ROCKPANEL BOARDS ONALUMINIUM LOAD-BEARING SECTIONS, FXED POINTS,SLOTTED HOLES AND MOVING POINTS SHOULD BE APPLIED. BY APPLICATIONSOF FXED POINTS AND MOVING POINTS THE FXED POINTS SHOULD BEPRE-DRILLED WITH Ø 5.2 MM, SLOTTED POINTS Ø 5,2 X 8 MM AND THEMOVING POINTS WITH Ø 8 MM. THE SLIDING ATTACHMENT MUST BE DONEWITH A ‘RIVET SPACER’ SO THAT THE ATTACHMENT CAN MOVE EASILY.INSTEAD OF DRILLING FX POINTS AND SLOTTED HOLES ALSO FX-POINT SLEEVESAND SIDE SLEEVES CAN BE USED TO ACHIEVE THE REQUIRED HOLES.CONTACT THE ROCKPANEL GROUP FOR MORE INFORMATION.

PURE VISTA OR (E/A) GLASS BALUSTRADE .

THE MEGAGRIP BASE RAIL SHOULD BE PLACED ONTO ITSDESIGNATED POSITION AND THE HOLES MARKED ON THESUBSTRATE FOR DRILLING. ONCE THE SHOE IS LEVEL INSERTTHE FIXINGS AND TIGHTENED UP TO MAKE THE CHANNELRIGID. THE FIXINGS MUST BE TIGHTENED IN ACCORDANCEWITH THE MANUFACTURERS INSTRUCTIONS.M12 COUNTERSUNK BOLTS MUST BE USED.

AXONIMETRIC 3D EXPRESSING CANTILEVER

N

S

E

W

N

Top Related