Puesta Del Sol II
Progress and Update Report
May, June, & July, 2000
![Page 2: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/2.jpg)
The Stainless Steel Ladder $2,100 US
Side View Top View
![Page 3: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/3.jpg)
Guards uniforms & security
Uniform Hat Days.......Rafael Nights.....Tolentino Sundays..
Rafael
Tolentino
Luis
![Page 4: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/4.jpg)
No Glass Containers
![Page 5: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/5.jpg)
Pool Maintenance
Pressure wash monthly
Ordered 5 new lightsOrdered tile to fix
small damaged tilesTo regrout in
September
![Page 6: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/6.jpg)
Wind Turbines
Installed 4 Wind Turbines on sewer vents
Act as wind powered extractors creating a negative pressure on sewer vents
Reduce odor on windy days in the condos
![Page 7: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/7.jpg)
AC Leak on Roof.....7 South
![Page 8: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/8.jpg)
Leaking roof 7 North
Old leak coming through AC plumbing
Fiberglassed panels on roof and side
To do similar work on South side to prevent future leak
![Page 9: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/9.jpg)
Attic Tour...TV....OTIS
![Page 10: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/10.jpg)
Water Meters ......16 installed
![Page 11: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/11.jpg)
Spiral Stairs to be repainted
![Page 12: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/12.jpg)
The Box on the side
![Page 13: Puesta Del Sol II](https://reader036.vdocuments.us/reader036/viewer/2022062308/56812ec8550346895d9466d6/html5/thumbnails/13.jpg)
September 16 to 23....closed
POOL AREA regrout pool replace pool lights replace glass install barrier I and II install Jacuzzi pump rewire pool room
BUILDING• clean cistern• replumb water pump• elevator, tile floor. paint
shaft. & cable repairs• paint spiral stairs• general cleaning &
painting