EIA/EMP report for Expansion cum Modification project of M/s. Super Smelters Limited At-
Jamuria Industrial Estate, Mandalpur, Po-Ikra, Dist- Paschim Burdwan, West Bengal
1 Global Tech Enviro Experts Pvt. Ltd.
CHAPTER-7
PUBLIC HEARING
Public Hearing for 0.85 MTPA Integrated Steel & 184 MW Proposed expansion project of M/s
Super Smelter Limited, Jamuria Industrial Estate of WB was conducted on 30.06.2017, 12
noon at meeting Hall, Borough-1, Jamuria in Paschim Burdwan, WB. The Proceedings as
submitted by WBSPCB are as follows:
EIA/EMP report for Expansion cum Modification project of M/s. Super Smelters Limited At-
Jamuria Industrial Estate, Mandalpur, Po-Ikra, Dist- Paschim Burdwan, West Bengal
2 Global Tech Enviro Experts Pvt. Ltd.
EIA/EMP report for Expansion cum Modification project of M/s. Super Smelters Limited At-
Jamuria Industrial Estate, Mandalpur, Po-Ikra, Dist- Paschim Burdwan, West Bengal
3 Global Tech Enviro Experts Pvt. Ltd.
EIA/EMP report for Expansion cum Modification project of M/s. Super Smelters Limited At-
Jamuria Industrial Estate, Mandalpur, Po-Ikra, Dist- Paschim Burdwan, West Bengal
4 Global Tech Enviro Experts Pvt. Ltd.
EIA/EMP report for Expansion cum Modification project of M/s. Super Smelters Limited At-
Jamuria Industrial Estate, Mandalpur, Po-Ikra, Dist- Paschim Burdwan, West Bengal
5 Global Tech Enviro Experts Pvt. Ltd.
EIA/EMP report for Expansion cum Modification project of M/s. Super Smelters Limited At-
Jamuria Industrial Estate, Mandalpur, Po-Ikra, Dist- Paschim Burdwan, West Bengal
6 Global Tech Enviro Experts Pvt. Ltd.
EIA/EMP report for Expansion cum Modification project of M/s. Super Smelters Limited At-
Jamuria Industrial Estate, Mandalpur, Po-Ikra, Dist- Paschim Burdwan, West Bengal
7 Global Tech Enviro Experts Pvt. Ltd.
EIA/EMP report for Expansion cum Modification project of M/s. Super Smelters Limited At-
Jamuria Industrial Estate, Mandalpur, Po-Ikra, Dist- Paschim Burdwan, West Bengal
8 Global Tech Enviro Experts Pvt. Ltd.
EIA/EMP report for Expansion cum Modification project of M/s. Super Smelters Limited At-
Jamuria Industrial Estate, Mandalpur, Po-Ikra, Dist- Paschim Burdwan, West Bengal
9 Global Tech Enviro Experts Pvt. Ltd.
Summary of Public Hearing report
Notice was given on 30.5.2017 in local daily „Ei Samay” and National daily “The Times of
India “for Public hearing of 0.85 MTPA Integrated Steel Expansion and 184 MW Power plant
of M/s Super Smelter Ltd in Jamuria Industrial Estate, Paschim Bardhhaman.
On 30.6.2017, at 12 noon PH was conducted in municipality Hall of Jamuria. Sri Kaushik
Mukherjee, W.B.C.S (Exe.), Dy. Magistrate & Dy. Collector and O.C.J.M, Paschim
Bardhhaman presided over the meeting. Sri Sudip Bhattacharya, Environment Engineer &
In-Charge Asansol Regional Officer, WBPCB and Sri Samit Dutta, Asst.Env. Engineer were
present in the Public Hearing.
Points raised in hearing by public and reply & commitment of Sri Rajeev Jha, Director of M/s
Super Smelter, whom represented the management have been given below.
Sl.No Points/questions raised by Public Commitment of P P
1 Steps/measures taken to control air
pollution
On line stack monitoring and
results are being sent to server of
CPCB n regular basis.
2 Measures taken for tree plantation both
inside and outside the premises
In last 3 to 4 years 8,000saplings
have been planted both within and
outside premises. July has been
identified as plantation month
3 Management to contribute to local schools
and roads
Necessary CSR programs are being
conducted and will be conducted in
future for benefit of local people.
EIA/EMP report for Expansion cum Modification project of M/s. Super Smelters Limited At-
Jamuria Industrial Estate, Mandalpur, Po-Ikra, Dist- Paschim Burdwan, West Bengal
10 Global Tech Enviro Experts Pvt. Ltd.
4 Provide job to local youth Industry provides skilled training
program for technical grade, the
benefits which can be availed by
local people. Different training
program for employees are being
conducted on regular basis.
5 What measures taken towards “Swasthya
mission” and “Nirmal Bangala Abhijan”
Necessary CSR programs are being
conducted and will be conducted in
future for benefit of local people.
6 Bore well water should not be used for
plant as ground water level is very low.
Total requirement of water to be
met from Ajay river & municipality
supply, also for water conservation
& rain water harvesting measures
are being adopted.
7 Health check-up camp to be organised in
locality
We are already providing health
check-up facilities to our
employees, we would look into
providing health check-up facilities
to locality also.
General Public and local bodies were in favour of the proposed expansion project of M/s
Super Smelter Ltd, Jamuria.
7.1 ENTERPRISE SOCIAL COMMITMENT:
The company will spend 2.5% of the total project cost of 2800 cr i.e 70 cr within 5 years
from the date of starting of construction activities.
EMP Measures Capital cost in Rs
crores
Air pollution control 51.50
Waste water management 9.50
Construction of village roads and
maintenance for 5 years 7.10
EMS & Training 1.9
Ambulance –ICU on wheels 1.0
Total 70.0