Provider No. 40119250Course Number: BBX017
#bbeXtreme
Lilian Magallanes
Project Closeout &Facility Maintenance
Industry Specialist Industry Specialist
Jeanette Popiel
![Page 2: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/2.jpg)
Credit(s) earned on completion of this course will be reported to AIA CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.
This course is registered with AIA CES for
continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.
___________________________________________Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation
![Page 3: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/3.jpg)
Course DescriptionOrganize and keep track of your project closeout documents. Leverage the power of Revu to create powerful, accessible and smart O&M manuals.
![Page 4: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/4.jpg)
Learning Objectives1. Keep track of documents and prepare for project closeout
2. Create a hyperlinked Facilities Management reference guide
3. Understand best practices for migrating to a smart, electronic O&M
manual
4. Use Studio to quickly access all warranties and equipment specifications
![Page 5: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/5.jpg)
“How do we…?”
![Page 6: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/6.jpg)
“How do we…?”
![Page 7: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/7.jpg)
Owners
Leverage Technology
![Page 8: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/8.jpg)
Keeping Track!
Electronic Markup
![Page 9: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/9.jpg)
Keeping Track!
Hyperlink– Details– Sheets– Specifications
![Page 10: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/10.jpg)
Keeping Track!
• Digitally Post RFIs
![Page 11: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/11.jpg)
Keeping Track!
Progress Photos
![Page 12: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/12.jpg)
Create a Hyperlinked O&M
• Level of Detail• Universal File Format
![Page 13: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/13.jpg)
Facilities Dashboard
Studio O&M
![Page 14: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/14.jpg)
Results
– Increased information sharing
– Easier document access
– Better collaboration between facility departments
– Mobile access to manuals
![Page 15: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/15.jpg)
Let’s See Revu in Action!
![Page 16: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/16.jpg)
Studio
File AccessAnytime,
Anywhere
![Page 17: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/17.jpg)
Field Solutions
![Page 18: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/18.jpg)
ConclusionThis concludes The American Institute of Architects Continuing Education Systems Course
![Page 19: Project closeout and facility maintenance - Bluebeam eXtreme Conference 2014](https://reader034.vdocuments.us/reader034/viewer/2022042623/54b63ef44a7959900c8b460c/html5/thumbnails/19.jpg)
Questions?