![Page 1: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/1.jpg)
Dr. Elias KONOFAGOS, Executive Vice PresidentAthens March 12h
, 2018October 30th
2018
Presentation to “I.E.N.E.”
![Page 2: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/2.jpg)
The Big Picture of Exploration & Production
Investments in Cyprus & Greece, Oct. 2018
Dr. Elias Konofagos
22
BLOCKS
12
I.O.C.’s
![Page 3: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/3.jpg)
The East Mediterranean
Main Type of Reservoirs
Sandstone Limestone
![Page 4: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/4.jpg)
Sandstone Reservoirs &
Limestone Resevoirs
NOT TO SCALE
SANDSTONE RES.
TARGETS
LIMESTONE
RES.TARGETS
![Page 5: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/5.jpg)
Comparison of Gas Field Sizes
ΚΥΠΡΟΣ
Zohr
Cyprus
EEZ
Egypt
EEZ
Israel EEZ
FIELDS: SIZE RESERVES
LEVIATHAN
Sandstone 340 km2 20 Tcf
ZOHR
Limestone 100 km2 30 Tcf
Leviathan
![Page 6: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/6.jpg)
Offshore Technical Production Costs &
Natural Gas Fields Commerciallity
Dr. Elias Konofagos
ΕΝΙ: Discovery
of “Zohr”
Sept. 2015
Presentation to
“IENE” October 2018
![Page 7: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/7.jpg)
Technical Production Cost
Natural Gas
T.P.C. =
▪Expressed in $/Mcft or $/boe
▪Includes Financing Costs
(Calculated Before Royalties, Taxes & Profit)
▪Yearly Total Gas Field Operating Cost
Estimated between 6% to 9% of Development
Cost (Production Period of 20 to 30 Years) .
Total Cost (Expl. + Dev/ment + Op/ting)
Total Recoverable Reserves
Dr. Elias KONOFAGOS
![Page 8: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/8.jpg)
E.U. Mean Import
Natural Gas price 2011 - 2016
7.2
20182011
Dr. Elias Konofagos
Price in boe
~$38/boe
$/Mcf
122013
![Page 9: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/9.jpg)
EastMed Natural Gas
Technical Production Costs
Examples
Dr. Elias Konofagos
Tamar, Zohr & Expected New South
Cyprus-South Crete Discoveries
![Page 10: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/10.jpg)
Water Depth
1.700 m
Source: Noble Energy
150km
TAMAR Processing
Platform
Dr. Elias Konofagos
▪Discovery 2009,
▪First Production 2013
▪Banks Consortium
Financing, by HSBC &
Barclay’s etc
![Page 11: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/11.jpg)
Subsea Well Heads
Umbilical Steel Tubes (240 km)
Flexible Pipes
Tamar Field: Subsea Well Heads Offshore Development Scheme
Dr. Elias Konofagos
Key Point: Unmaned Remote Production Management from Platform
![Page 12: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/12.jpg)
Source: Noble Energy
▪Exploration= ~$1 B
▪Total Development= $5 B
▪ 20 Years Production: 8,4 Tcf
▪Annual Production= ~420 Bcft
▪Operating Cost= ~$600 MM/Year
“Tamar” Gas Field Production Investments
Dr. Elias KONOFAGOS
![Page 13: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/13.jpg)
Source: Noble Energy
Technical Production Cost “Tamar”
Dr. Elias KONOFAGOS
~$2,1/Mcft
~$13/boe
Israel Contractual Price:
$5,8/Mcft
Project IRR=~20%
Subsea Wells
Water Depth 1.678m
150 km Pilelines &
Umbilical Cablesor
![Page 14: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/14.jpg)
“Zohr” ENI
Discovery
Dr. Elias Konofagos
SEPTEMBER 2017
![Page 15: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/15.jpg)
“Zohr” Gas Field, Full Subsea Development
500.000 boe/dayDr. Elias KONOFAGOS
![Page 16: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/16.jpg)
Zohr
Development Scheme of “Zohr” Gas Field
Total 600km Subsea Steel Tubes
Umbilical Providing Electrical &
Hydraulic Connections with Well Heads
Dr. Elias Konofagos
![Page 17: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/17.jpg)
Zohr
Development Scheme of “Zohr” Gas Field
ECONOMICS
▪Exploration =
~$1Billion
▪Prod. Wells =
~$2 Billion
▪Development=
~$11 Billion
▪ Operating
Cost= ~$1,1 B/Year
▪Yearly Prod.
= ~900 Bcf
▪30 Years Prod.
= 26Tcf
Dr. Elias Konofagos
![Page 18: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/18.jpg)
Zohr
Development Scheme of “Zohr” Gas Field
~$1,8/Mcft
~$11/boe
Gas Price Paid by Egypt:
$4/Μcft - $5,88/Mcft
=
=
or
Wells
Equivalence: $30/bbl = $5/Mcft IRR =~35% Dr. Elias Konofagos
Contractual Terms
65% - 35%
![Page 19: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/19.jpg)
South of Cyprus or South of Crete Expected
Gas Discovery Cases, Rec. Res. 2,5 Tcf
70 km Gas to
Shore Pipeline
South Crete Case:
Water Depth ~2.500m
Rec. Reserv. ~5 Tcf
South Cyprus Case:
Water Depth ~2.500m
Rec Reserv ~5 Tcf
100 km Gas to
Shore Pipeline
Dr. Elias Konofagos
![Page 20: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/20.jpg)
South Cyprus or Crete Gas Field Case,
Reserves 5 Tcf, Production Investments
Subsea
Production
Well Heads.
▪Exploration Cost= ~ 1 Billion
▪Wells: Drilling Depth 3.500m
▪Well Cost= ~$100 Million
▪Development= ~$6 Billion
▪Annual Production, 180 Bcf
▪18 Years Production, 5,5 Tcf
▪Operating Cost: $600 Million/Year
Floating
Production
Facilities
Dr. Elias Konofagos
![Page 21: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/21.jpg)
Dr. Elias Konofagos
~$4,5/Mcft
~$27/boe
Natural Gas Contract
Price: $5/Mcft (~$30/boe)
Subsea Production
Well Heads.
Floating
Production
Facilities
South Cyprus or South Crete Gas Field Case,
Reserves 5 Tcf, Technical Production Cost
Contractual Terms
40%-60% Sharing
Project IRR= ~0%
=
=
or
![Page 22: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/22.jpg)
Dr. Elias Konofagos
~$4,5/Mcft
~$27/boe
Natural Gas Contract
Price: $7/Mcft (~$30/boe)
Subsea Production
Well Heads.
Floating
Production
Facilities
South Cyprus or South Crete Gas Field Case,
Reserves 5 Tcf, Technical Production Cost
Contractual Terms
40%-60% Sharing
Project IRR= ~12%
=
=
or
![Page 23: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/23.jpg)
Expected Limestone Biogenic Gas Reservoirs
Expected Sandstone Gas Reservoirs
▪Cyprus: ~3 Tcm
▪Lebanon: ~1,4 Tcm
▪Greece : ~3 Tcm
▪ Israel: ~1,4 Tcm
▪ Egypt: ~3 Tcm
NG Ressources, with 50% Probability
?
~100 TCF
Crete Cyprus
Egypt
![Page 24: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/24.jpg)
Future Natural Gas Discoveries &
Stand Alone Commerciality Challenges
Dr. Elias Konofagos
▪Reservoirs of Sufficient Size
▪High Natural Gas Pay Zones (>10Tcf)
▪High Wells Production Rate, ~35MMcf/day
▪Contactual Commercial Terms
Compatible with the Risks Involved
Water Depths >2.500m
![Page 25: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/25.jpg)
THANK YOU
Dr. Elias KONOFAGOS
Executive V.P.
Presentation to I.E.N.E.
Athens, October 30th
2018
![Page 26: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS](https://reader036.vdocuments.us/reader036/viewer/2022081615/5fdb253b90dd36182e72da6a/html5/thumbnails/26.jpg)