P I S DP I S D -- II
CASE STUDIES
Theimage cannotbe displayed.Your computer may nothaveenough memory toopen theimage,or theimagemay havebeen corrupted.Restartyour computer,and then open thefile again.If thered x stillappears,youmay haveto deletetheimageand then insertitagain.
-
8/8/2019 PISD-I Case Studies
2/13
Textile Sugar Paper Leather
P I S DP I S D II
July-2007 to June-2010
150150 5050 1515 100100
-
8/8/2019 PISD-I Case Studies
3/13
PISD Services
1. Dissemination and Communication
2. Training and Human Resource Development
3. Cleaner Production and Energy Efficiency Technologies
4. Wastewater Treatment Plants
5. Environmental Management System and Certification
6. Corporate Social Responsibility (CSR)
7. Performance Reports
-
8/8/2019 PISD-I Case Studies
4/13
PISD Process
Integrated Audit
(I)
Confirmed list of interestedindustries from PSC, I.Aconducted at industry, I.Areport shared withindustry
(O)
I.A report document,Industry got awarenessabout the opportunities
for energy savings andenvironmentalimprovement
Action Plan
(I)
Findings &
recommendation fromI.A report, specificinvestigation, costestimations, cost benefitanalysis, estimation of ROI, discussions withindustry representatives
(O)
Final Action Plandocument, Industry gotawareness about the
actions to be taken forenergy savings andenvironmentalimprovement
CP/CT/ET
(I)
Industry select theCP/CT/ET by itself from the
Action Plan, CPI facilitateby collecting baselineinformation, providing listof vendors and contractors,top supervision duringinstallation, providingtraining to HR on site
(O)
Selected intervention gotimplemented, Industrystarts savings due to theactions taken for energyconservation andenvironmentalimprovement
PerformanceAnalysis
(I)
Monitoring andrecord keepingformats;coordinationbetween industryand CPI
(O)
Continuousmonitoring &record keeping;performance data
P r i m e A c t i v i t i e s
(I) Input (O) Output
-
8/8/2019 PISD-I Case Studies
5/13
Industry Name Sarena Industries & Embroidery Mills (Pvt.) Ltd. Lahore
PISD Partner since March 2008
PISD Services Availed Integrated Audit, Action Plan, EMS (D,I,C), CT, ET, WWTPdesign, CSR, Performance Evaluation Survey, Trainings
Cleaner Technology Installation of Caustic Recovery Plant (CRP)
Before2.3% (Approximately 3,800kg/day) of Caustic Soda wasbeing wasted from Mercerization wash boxes at a flow rateof about 7m 3/hr.
Technology Implemented
Caustic Recovery Plant with two stage multiple effectevaporator.
After No wastage of Caustic Soda from Mercerization wash boxes.Reduction in the daily chemical and fresh waterconsumption.
Cost Capital
O&M
Rs. 3.6million
Rs. 5.0million/yrSavings Caustic Soda
Fresh water 483ton/yr ( 35%) 18,000m 3/yr
Payback 4months
TextileTextile
-
8/8/2019 PISD-I Case Studies
6/13
Industry Name Sarena Industries & Embroidery Mills (Pvt.) Ltd. Lahore
Energy EfficientTechnology
Steam Traps Management
Before
Many faulty steam traps were found during audit. Regularinspection, repair and maintenance of these steam traps wasnot in place. Maintenance crew does not have schedulemaintenance record of these traps. A lot of steam wastageoccur unintentionally.
Technology Implemented
Steam Trap Management system was implemented. It
includes regular surveys of the installed steam traps withchecking and data collection. It followed by therecommendations for the replacement or repair of the faultytraps. Actions taken on the recommendations.
After Many steam traps have been repaired and/or replaced.Steam wastage is controlled.
Cost Capital Rs. 60,000.Savings Natural Gas
SteamFresh WaterCO2 reduction
288,000m 3/yr 2,700ton/yr 3,840m 3/yr 518ton/yr
Payback < 1months
TextileTextile
-
8/8/2019 PISD-I Case Studies
7/13
SugarSugar
Industry Name Husein Sugar Mills Ltd. Faisalabad
PISD Partner since February 09
PISD Services Availed Integrated Audit, Action Plan, CT, ET, EMS (D,I), CSR, Trainings
Cleaner Technology Reuse of Caustic Soda Solution
Before20% Caustic Soda solution is used to wash the evaporatorsurface. This solution is drained after boiling, havingconcentration of about 5%.
Technology Implemented
It was recommended that this drained solution should becollected and reused. Concentration of chemical solutionshould be checked after each cleaning and fresh chemicalsmay be added to maintain the required concentration.
After All the drained Caustic Soda solution is collected and reused.Reduced chemical consumption.
Cost Incurred Rs. 0.5million
Savings Caustic Soda 20,040kg/4months season
Payback 3months
-
8/8/2019 PISD-I Case Studies
8/13
Industry Name Huda Sugar Mills Ltd. Nankana Sahib
PISD Partner since February 09
PISD Services Availed Integrated Audit, Action Plan, CT, ET, EMS (D,I), CSR, Trainings
Energy EfficientTechnology Insulation of Bare Hot Surfaces
Before
Bare hot surfaces like valves, flanges, lines and vessels wastea lot of thermal energy through radiation and convection.Many bare hot surfaces were observed during the auditactivity.
Technology Implemented
Insulation of 2" thick rock wool, covered with GI (GalvanizedIron) sheet of 26 gauge.
After Reduction in thermal energy losses and fuel saving.
Cost Capital Rs. 2.0million
Savings BagasseCO2 gas
800tons/4months season 640tons/4 months season
Payback 3months
SugarSugar
-
8/8/2019 PISD-I Case Studies
9/13
Industry Name Century Paper and Board Mills Ltd.
PISD Partner since July 2007
PISD Services Availed Integrated Audit, Action Plan, CT, ET, CSR, Trainings
Cleaner Technology Recycling of SO 2 Water
BeforeHot SO 2 water ( 1.5g/lit) was released during thepreparation of Sodium Sulfide. All this release was drainedout with wastewater.
Technology
Implemented
SO2 water recycling station was installed. It is a combinationof a Plate Heat Exchanger, a collection pit and a recirculationpump.
After
No hot SO 2 water drainage from the industry. Reduction inthe consumption of Sulfur (4% 250kg/day) and of freshwater ( 340m 3/day). Availability of hot water ( 1440m 3/day)to be utilized in other processes.
Cost Incurred Rs. 2.65millionSavings Sulfur
Fresh waterSteam
250kg/day ( 4%) 340m 3/day 86kg/ton of hot water
Payback 12 months
PaperPaper
-
8/8/2019 PISD-I Case Studies
10/13
Industry Name Century Paper and Board Mills Ltd.
Energy EfficientTechnology
Power Factor Improvement
Before
Power factor maintenance was not appropriate. Capacitorbanks with auxiliary equipment was not in good condition.Some of the control relays were not working. Low powerfactor penalty was also imposed by the authorities.
Technology Implemented
Automatic power factor correction was installed with thereplacement of damaged capacitor banks and control relays.
After Power factor penalty was saved and distribution losses werereduced.
Cost CapitalRunning
Rs. 2.0 million Rs. 0.4 million/yr
Savings Power factor penalty 1% of overall electricity bill
Payback 11 months
PaperPaper
-
8/8/2019 PISD-I Case Studies
11/13
Industry Name H.Sadar Ali Akhtar Ali (Pvt.) Ltd.
PISD Partner since July 2007 (also since 2001)
PISD Services Availed Integrated Audit, Action Plan, CT, ET, EMS (D,I,C), WWTP (D,I)CSR, Trainings
Cleaner Technology Chrome Recovery Plant (CRP)
BeforeAll the tanning effluent having Chrome ( 146mg/l) wasdrained.
Technology
Implemented
A CRP consists of an underground effluent collection tank, areactor, chemical (acid and alkali) dosing tank, and aregeneration tank.
After Chemical (Chrome) conservation, reduction in the chromecontents (from 146mg/l to 0.03mg/l) in effluent drain.
Cost Incurred CapitalRunning
Rs. 1.2million Rs. 1.2million
Savings Chrome 145.97mg/l ( 99.98%)Payback 15 months
LeatherLeather
-
8/8/2019 PISD-I Case Studies
12/13
Industry Name H.Sadar Ali Akhtar Ali (Pvt.) Ltd.
Energy EfficientTechnology
Insulation of Bare Hot Surfaces
Before
It was observed during audit that hot pipes of steam andcondensate and the hot water storage tanks were notinsulated. It resulted into lot of heat loss resulting in highernatural gas bills.
Technology Implemented
Insulation of 2" thick rock wool, covered with GI (GalvanizedIron) sheet of 26 gauge.
After Reduction in thermal energy losses and fuel saving.Cost Capital Rs. 3.5million
Savings Natural GasCO2 gas
105,875m3/yr 233tons/yr
Payback 5months
LeatherLeather
-