Download - Peter Lim CV Dec 2014 V1
![Page 1: Peter Lim CV Dec 2014 V1](https://reader030.vdocuments.us/reader030/viewer/2022020116/55a8a2981a28ab50718b47a2/html5/thumbnails/1.jpg)
Peter Co Lim10 Redwood St. New Marikina Subdivision
Marikina City, Philippines 1801
(63917) 8340717
Profile Highlights
More than 5 years of Functional Experience across different releases of SAP R/3 and ECC
specific to the areas of SD with 4 implementation cycle and 1 roll out project and 13 years of total
work experience. Proven to be a valuable team player in successful SAP Projects in the field of
high tech manufacturing, quick service restaurant, semiconductors, battery manufacturing, lead
manufacturing, plastic manufacturing, furniture/foam manufacturing & distribution, food
manufacturing & distribution, and Oil & Gas Industry.
Presently working as a SAP SD Lead Consultant at ABM Global Solutions. Had worked
extensively with top management and operational business process owners and users to
articulate, define and derive the strategic focus of the enterprise, optimize resources and assure
system integration.
• Strong experience in SAP consulting, Pre-sales, Implementation and Development.
• Experience in conducting an instructor led SAP academy program.
• Conducted a successful audit project and highlighted observations and recommendations
• Certified in SD ECC 6.0
• Strong planning and communication skills
• Core strengths in Sales include R/3 SD with master data and integration knowledge
across all modules and holistic solution development from R/3 for KPI/Planning and
Consolidation.
• Effectively articulate, discuss and define strategies at Board and top management level
• Strong Team Management, Solution Management and Business Development skills.
Areas of Expertise
![Page 2: Peter Lim CV Dec 2014 V1](https://reader030.vdocuments.us/reader030/viewer/2022020116/55a8a2981a28ab50718b47a2/html5/thumbnails/2.jpg)
PETER CO LIM
SD: Order Processing
Others: Transportation Management, Integration with Materials Management
and Financial Accounting modules
Skills and Proficiency
Software/ Hardware Year Starting of
Experience
ECC 6 2008
R/3 System 4.0 and 4.7 2009
R/3 System 4.5B 2002
Microsoft Office 1993
Project Experience
1) ECC 6.0 Implementation
Industry: Foam and Furniture Manufacturing and Distribution
Company: Mandaue Foam Inc.
Country: Cebu City, Philippines
Modules: Financial Accounting / Sales & Distribution / Materials Management /
Warehouse Management
Project Duration: June 2014 to December 2014
SAP System: R/3 Enterprise version 6.0 EHP7
Project Objective: • To implement ECC 6.0 to replace the current ERP system (In
house ) integrated with a POS system with the same live date
Customer’s Major
Challenges:
• System capability is very limited
• No availability check
• Limited sales reports
Business Benefits • Real-time inventory checking in the system
• Improved report generation turnover
Page 2 of 11
![Page 3: Peter Lim CV Dec 2014 V1](https://reader030.vdocuments.us/reader030/viewer/2022020116/55a8a2981a28ab50718b47a2/html5/thumbnails/3.jpg)
PETER CO LIM
Role
Major Responsibilities: • Conducted blueprinting sessions with the process owners.
Prepared the to be process flows
• Conducted user training in SAP for the users to give them a
general perspective of the S&D module.
• Configuration of the system to suit customer’s requirements
• Conducted end user training
• Creation of LSMW programs for upload of customer / credit limit
/pricing related condition records
• Post Go-live support
2) ECC 6.0 Implementation
Industry: Battery Manufacturing and Distribution
Company: Marshall Power Australia Ltd.
Country: Australia & New Zealand
Modules: Financial Accounting / Sales & Distribution / Materials Management /
Production Planning
Project Duration: February 2013 to September 2013
SAP System: R/3 Enterprise version 6.0
Project Objective: • To implement ECC 6.0 to replace the current ERP system of JDE
Customer’s Major
Challenges:
• System capability is very limited
•
Business Benefits • Use of delivery dockets/ manual entry in SAP was eliminated
• Real-time inventory checking in the system
• Improved report generation turnover
Role
Major Responsibilities: • Conducted blueprinting sessions with the process owners.
Prepared the to be process flows
• Conducted user training in SAP for the users to give them a
general perspective of the S&D module.
• Configuration of the system to suit customer’s requirements
Page 3 of 11
![Page 4: Peter Lim CV Dec 2014 V1](https://reader030.vdocuments.us/reader030/viewer/2022020116/55a8a2981a28ab50718b47a2/html5/thumbnails/4.jpg)
PETER CO LIM
3) ECC 6.0 Implementation support / Mobile POS Roll-out & support
Industry: Battery Distribution
Company: Super Charge Batteries
Country: Australia
Modules: Financial Accounting/ Sales & Distribution / Materials Management
Project Duration: February 2012 to April 2013
SAP System: R/3 Enterprise version 6.0
Project Objective: • To roll-out the POS system across all Australia sales reps
Customer’s Major
Challenges:
• Lack of customer/inventory data
• Delayed transmittal of delivery dockets for encoding in SAP
Role
• Use of delivery dockets/ manual entry in SAP was eliminated
• Real-time inventory checking on the devices
• SD Consultant
Major Responsibilities: • Trained sales reps and warehouse personnel on the use of the
handheld devices and desktop systems.
• Acted as support personnel after rollout of each rep.
• Made sure SAP custom programs addressed the requirement of
transferring correct data from POS to SAP and vice versa
4) PSSLAI Loans Management Implementat ion
Industry: Lending
Company: PSSLAI
Country: Philippines
Modules: Financial Accounting
Project Duration: January 2012 to February 2012
SAP System: R/3 Enterprise version 6.0
Project Objective: • Create SAP Loans Management System
Customer’s Major • Existence of a secondary system that impeded operational
Page 4 of 11
![Page 5: Peter Lim CV Dec 2014 V1](https://reader030.vdocuments.us/reader030/viewer/2022020116/55a8a2981a28ab50718b47a2/html5/thumbnails/5.jpg)
PETER CO LIM
Challenges: decision-making and reporting
• Generation of reports for easy monitoring
Business Benefits: • Creation of a single enterprise system for all transaction.
Role • FI Consultant
Major Responsibilities: • Verified the configuration of the system to comply with the
approved design.
• Performed integration testing to assure accuracy of the programs
developed.
5) ECC 6.0 Implementation Project
Industry: Battery Manufacturing & Distribution
Company: Ramcar Batteries Inc.
Country: U.S.A.
Modules: Financial Accounting, Controlling, Materials Management, Production
Planning, and Sales & Distribution
Project Duration: February 2011 to July 2011
SAP System: R/3 Enterprise version 6.0
Project Objective: • Upgrade to SAP 6.0 from SAP 4.0B by July 2011
Customer’s Major
Challenges:
• Existence of a secondary system for their production since PP
module was not implemented in 4.0B
• Lack of users to transact in SAP
Business Benefits
Achieved after the
Project:
• Creation of a single enterprise system for all transactions
• Improved efficiency with the use of the newer GUI and user’s better
understanding of the capabilities of the system
• Improved report generation turnover
Role • SD Consultant
Major Responsibilities: • Evaluate and document existing business processes and initiated
improvements in the design.
• Configure the system to comply with the approved design.
• Focus on and ensure the correctness of the implementation of the
sales & distribution modules of the system.
• Perform integration testing with the other modules to assure
accuracy of the configuration.
Page 5 of 11
![Page 6: Peter Lim CV Dec 2014 V1](https://reader030.vdocuments.us/reader030/viewer/2022020116/55a8a2981a28ab50718b47a2/html5/thumbnails/6.jpg)
PETER CO LIM
• Conduct comprehensive user training
Major
Accomplishments: • Integration of business functions that enhance productivity,
flexibility, and customer responsiveness. Through use of SAP
reports, key data and information can be automatically generated
for better productivity.
• Creation of new customized reports previously done offline.
6) ECC 6.0 Implementation Project
Industry: Power Industry
Company: CBK Co. Inc.
Country: Philippines
Modules: Financial Accounting, Controlling, Materials Management, Plant
Maintenance, Sales & Distribution
Project Duration: June 2009 to February 2010
SAP System: R/3 Enterprise version 4.7
Project Objective: • Create SAP Backend system that can interface seamlessly with the
in-house banking systems and leverage with available SAP
standard reports
Customer’s Major
Challenges:
Business Benefits
Achieved after the
Project:
• Existence of multiple systems that impeded operational decision-
making and reporting
• Creation of a single enterprise system for all transactions
• Increase efficiency through streamlining and elimination of
manual/redundant processes, and automation by at least 30%
• Reduced business transaction processing efforts by 10%
Improved report generation turnover
Role • SD Consultant
Major Responsibilities: • Evaluated and documented existing business processes and
initiated improvements in the design.
• Configured the system to comply with the approved design.
• Focused on and ensured the correctness of the implementation of
the sales & distribution modules of the system.
• Performed integration testing with the other modules to assure
accuracy of the configuration.
• Conducted comprehensive user training
Page 6 of 11
![Page 7: Peter Lim CV Dec 2014 V1](https://reader030.vdocuments.us/reader030/viewer/2022020116/55a8a2981a28ab50718b47a2/html5/thumbnails/7.jpg)
PETER CO LIM
Major Accomplishments: • Integration of business functions that enhance productivity,
flexibility, and customer responsiveness. Through use of SAP
reports, key data and information can be automatically generated
for better productivity.
7) ECC 4.7 Roll Out Project
Industry: Fast Moving Consumer Goods
Company: Quench Plus
Country: Philippines
Modules: Financial Accounting, Controlling, Materials Management, Plant
Maintenance, Sales & Distribution
Project Duration: March 2010 to June 2010
SAP System: R/3 Enterprise version 4.7
Project Objective: • Project Roll out to extend the system to a new company
Customer’s Major
Challenges:
• Insufficient human resources to serve as end users and functional
team. Unavailability or the users.
Business Benefits
Achieved after the
Project:
• Creation of a single enterprise system for all transactions
• Increase efficiency through streamlining and elimination of
manual/redundant processes and automation
• Improved report generation turnover
Role • SD Consultant
Major Responsibilities:
Major Accomplishments:
• Evaluated and documented existing business processes and
initiated improvements in the design.
• Configured the system to comply with the approved design.
• Focused on and ensured the correctness of the implementation of
the sales & distribution modules of the system.
• Performed integration testing with the other modules to assure
accuracy of the configuration.
• Conducted comprehensive user training
• Integration of business functions that enhance productivity,
flexibility, and customer responsiveness. Through use of SAP
reports, key data and information can be automatically generated
for better productivity.
8) SLA Support
Page 7 of 11
![Page 8: Peter Lim CV Dec 2014 V1](https://reader030.vdocuments.us/reader030/viewer/2022020116/55a8a2981a28ab50718b47a2/html5/thumbnails/8.jpg)
PETER CO LIM
Industry: Quick Service Restaurant, Food Manufacturing, Battery
Manufacturing & distribution, Media Publishing, clothing
manufacturing, Semi Conductor manufacturing, Petro Chemical
Manufacturing.
Company: Ramcar Group of Companies, Big E , Summit Media, JG Petrochem,
Golden ABC, CBK Power, PSI Technologies
Country: Philippines, U.S.A. , Australia
Modules: Financial Accounting, Controlling, Materials Management, Production
Planning, Sales & Distribution
Project Duration: March 2009 to June 2009, December 2009 to April 2011
SAP System: R/3 Enterprise version 4.0, 4.7 & ECC 6
Role • SD Consultant
Major Responsibilities: • Resolve tickets and issues SD in nature
Major Accomplishments: • Quick resolution of major tickets received.
Work Experience
1) ABM Global Solutions
Country: Philippines
Industry: IT Consulting Services
Position: SAP Business Analyst
Employment Dates: June 2014 to Present
Major Responsibilities &
Accomplishments:
• Implement SAP solutions for various enterprises based on ASAP
methodology.
• Conduct pre-sales to clients
• Provide SAP support to end-users.
2) Chevron Holdings Inc.
Country: Philippines
Industry: IT Consulting Services
Page 8 of 11
![Page 9: Peter Lim CV Dec 2014 V1](https://reader030.vdocuments.us/reader030/viewer/2022020116/55a8a2981a28ab50718b47a2/html5/thumbnails/9.jpg)
PETER CO LIM
Position: SAP Business Analyst
Employment Dates: September 2013 to June 2014
Major Responsibilities &
Accomplishments:
• Implement SAP solutions for various enterprises based on ASAP
methodology.
• Provide SAP support to end-users for North and Latin American
Countries.
3) Kaisa Consulting Company Incorporated
Country: Philippines
Industry: IT Consulting Services
Position: Consultant
Employment Dates: January 2009 to September 2013
Major Responsibilities &
Accomplishments:
• Implement SAP solutions for various enterprises based on ASAP
methodology.
• Provide SAP support to end-users.
• Conduct SAP Academy trainings.
• Conduct pre-sales to clients
4) Honda Cars Makati Incorporated
Country: Philippines
Industry: Car Industry
Position: Sales Executive
Employment Dates: May 2002 to October 2004
Major Responsibilities &
Accomplishments:
• Effectively market the company's line of Vehicles
and Maintenance Services
• Achieve sales targets through acquisition and
management of corporate accounts
• Received various awards for exemplary sales
performance
Page 9 of 11
![Page 10: Peter Lim CV Dec 2014 V1](https://reader030.vdocuments.us/reader030/viewer/2022020116/55a8a2981a28ab50718b47a2/html5/thumbnails/10.jpg)
PETER CO LIM
• End user for SAP ECC 4.5B SD functions
5) Alveo Land Inc. (formerly Community Innovations Inc.)
Country: Philippines
Industry: Real Estate Industry
Position: Property Specialist
Employment Dates: January 2005 to October 2005
Major Responsibilities &
Accomplishments:
• Effectively market the Company’s projects like
Serendra and Columns.
Work-Related Trainings and Certif icat ion
Institution: Kaisa Academy (Philippines)
Date: February 2009
Course: • SAP ECC 6.0 SD Module
• Certified SAP Consultant (ID No. S0006443008 )
Institution: Digi leaf Phil ippines
Date: November 8-9, 2011
Course: • Enterprise Analysis & Domain Modeling
Institution: Digi leaf Phil ippines
Date: November 16-18, 2011
Course: • Business Analysis (Eliciting, Documenting & Managing
Requirements)
Institution: Kaisa E-Academy (Phil ippines)
Date: September 2008 – January 2009
Page 10 of 11
![Page 11: Peter Lim CV Dec 2014 V1](https://reader030.vdocuments.us/reader030/viewer/2022020116/55a8a2981a28ab50718b47a2/html5/thumbnails/11.jpg)
PETER CO LIM
Course: • SAP ECC 6.0 SD Module
Institution: Kaisa Academy (Philippines)
Date: September 9-12, 2009
Course: • Project Management Boot Camp
Instructor Experience
Institution: Kaisa Academy (Philippines)
Date: March 2011
Course: TSCM60 Order Fulfillment 1
Institution: Kaisa Academy (Philippines)
Date: February 10, 2010
Course: SAP SD User Training
Education
Institution: De La Salle University, Manila, Philippines
Date: December 2000
Degree: • AB Political Science
Page 11 of 11