Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 1
NORTH POWER CORPORATION
Electric Network Project Management Board
-------------------------------
RESETTLEMENT PLAN
(RP)
SUBPROJECT:
THE RURAL ENEGY II PROJECT
ADDITIONAL FINANCING – PHASE 4- HA NAM PROVINCE
Hanoi, August, 2012
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 2
TABLE OF CONTENTS
ABSTRACT 3
1. GENERAL INTRODUCTION 6
1.1. PROJECT OBJECTIVES ................................................................................................ 6
1.2. PROJECT SCALE .......................................................................................................... 6
1.3. RESETTLEMENT OBJECTIVES ................................................................................. 9
2. THE PROJECT’S IMPACT LEVEL 11
2.1. DETERMINING PROJECT’S IMPACTS ................................................................... 11
2.2. DIFFERENT TYPES OF IMPACTS IN THE PROJECT ............................................ 15
3. LEGAL FRAMEWORK AND AFFECTED BENEFITS 21
4. COMPENSATION AND SUPPORT 24
4.1. COMPENSATION ........................................................................................................ 24
4.2. LIFE RECOVERY SUPPORT AND ALLOWANCE FOR DPS ................................ 36
5. COMMUNITY CONSULTATION AND INFORMATION DISCLOSURE 37
5.1. COMMUNITY ENGAGEMENT AND CONSULTATION ....................................... 37
5.2. INFORMATION RELEASE ........................................................................................ 39
5.3. CLAIMS AND DISPUTES .......................................................................................... 39
6. REPORT, MONITORING AND EVALUATION 41
6.1. INTERNAL MONITORING ........................................................................................ 41
6.2. SUPERVISION, INSPECTION AND EVALUATION ................................................ 43
6.3. REPORTING REGIME ................................................................................................. 44
7. IMPLEMENTATION PLAN 45
7.1. IMPLEMENTATION RESPONSIBILITY .................................................................. 45
7.2. IMPLEMENTATION PERIOD .................................................................................... 46
8. EXPENSES 48
8.1. EXPENDITURES OF RP PERFORMANCE............................................................... 48
8.2. TOTAL ESTIMATES FOR RP PERFORMANCE ...................................................... 50
APPENDIX 51
1. PROJECT AREA 52
2. POLICY FRAMEWORK 53
4. ROUTE AGREEMENT 63
7. SAMPLE LEAFLET 82
8: CHECKLIST OF HOUSEHOLDS WITH AFFECTED LAND, TREES AND CROPS86
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 3
ABSTRACT
The “Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam province” is
launched after the second phase conducted in Ha Nam province. The additional RE2 of EVN
is funded by WB. The sub-project is constructed in 40 communes (wards and towns) under 06
districts (cities) of Ha Nam Province, including: Communes of Thanh Chau, Phu Van, Chau
Son, Dinh Xa, Boi Cau, Don Xa, Bo De, An Lao, Tieu Dong, Binh Nghia, An Ninh, Trinh
Xa, My Tho, La Son, Liem Tiet, Thanh Luu, Liem Tuc, Thanh Hai, Thanh Tan, Thanh Nghi,
Thanh Binh, Liem Can, Liem Phong, Dai Cuong, Thuy Loi, Kha Phong, Ngoc Son, Van Xa,
Tan Son, Nhan Binh, Bac Ly, Hop Ly, Chau Son, Tien Hiep, Moc Nam, Dong Van town,
Que, town, Kien Khe town, Vinh Tru town, Quang Trung ward.
The sub-project's activities include: (i) construct total 23,176 km of MV wireline; (ii)
61 transformer stations; (iii) rehabilitate and construct 50,991km LV wirelines in which:
36,656km and 14,335km of rehabilitation and construction.
The subproject shall affect 126 households (527 persons). The recovered land area of
affected households is from 0.3% to 5.06% against total land area owned by them.
Specifically:
DP reclaimed with less than 10% of cultivated land: 126 households (527
persons)
DPs whose crops are permanently affected: 111 households
(463 persons)
DPs whose perennial trees are permanently affected: 13 households (55
persons)
DPs whose cultivated land is temporarily affected: 124 households (518
persons)
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 4
Permanent impact:
Types of impacts Phu Ly city Binh Luc
District
Thanh Liem
District
Kim Bang
District
Ly Nhan
District
Duy Tien
District Total
– Permanent impact (cultivated land) 20 m2 191 m
2 404 m
2 824 m
2 94 m
2 45 m
2 1,578 m
2
– Permanent impact (garden and forest
land) 24 m
2 0 145 m
2 0 0 0 169 m
2
– Crop impact (rice) 20 m2 191 m
2 404 m
2 824 m
2 94 m
2 45 m
2 1,578 m
2
– Impacts on perennial trees (eucalyptus,
acacia) 0 0 23 trees 0 0 0 23 trees
Temporary impact:
Types of impacts Phu Ly city Binh Luc
District
Thanh Liem
District
Kim Bang
District
Ly Nhan
District
Duy Tien
District Total
– Temporary impact (cultivated land) 50 m2 970 m
2 2,270 m
2 4,420 m
2 730 m
2 190 m
2 8,630 m
2
– Temporary impact (garden & forest land) 0 0 1,510 m2 0 0 0 1,510 m
2
– Crop impact (rice) 50 m2 970 m
2 2,270 m
2 4,420 m
2 730 m
2 190 m
2 8,630 m
2
– Impacts on perennial trees (eucalyptus,
acacia) 0 0 272 trees 0 0 0 272 trees
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 5
The Resettlement Plan of the subproject on reporting Resettlement Plan for Rural Energy -
Additional Financing (Phase 4) Subproject in Ha Nam is prepared in accordance with the
policy on Reluctant Resettlement (OP 4.12) of the World Bank and Policy Framework of the
additional financing RE2.
The compensation activities for affected households are expected to be commenced on August
2012. Total estimated expenses for RP performance is 845,406,881VND (to be updated when
the subproject is launched to ensure the principle of replacement price-based compensation).
Expenses for RP performance are from partner funds: EVN
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 6
1. GENERAL INTRODUCTION
1.1. PROJECT OBJECTIVES
The Rural Energy Project No. 2 (RE2) aims at facilitating the Vietnamese Government
to launch poverty elimination campaign in rural areas by providing key infrastructures such as
power and access to public services to improve life, production and business performance,
concretely:
- Develop a rural electrification strategy, specially focusing on power supply to
mountainous and remote areas.
- Rehabilitate, upgrade and expand the rural power system to satisfy power supply
demand for the future socio-economic development.
- Improve power supply reliability, reduce loss on power, and improve performance
for production and business activities.
- Re-unify the rural power grid system to improve reliability and power quality to be
provided, including reduction of power loss due to technical or non-technical failure.
The RP of “Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam” is
prepared in accordance with Policy Framework of the additional financing RE2.
The “Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam” is launched
after the performance is achieved in the first phase and the Rural Energy project conducted
previously. The project objectives are as follows: (i) To recover overload and significant loss
of power grid in rural area, (ii) To develop power coverage in rural areas where surcharge
demand sharply increases to improve the grid capacity, timely responding to the surcharge
development demand and power supply quality assurance (iii) To prevent overload for power
grids in project communes and reduce power loss, improving power supply quality to stabilize
the area, serving for production and business demand of the rural area.
1.2. PROJECT SCALE
The “Rural Energy – Additional Financing (Phase 4) Subproject in Ha Nam” is
launched in 40 communes (wards) under 06 districts (towns and cities) of Thai Nguyen
Province, including: Communes of Thanh Chau, Phu Van, Chau Son, Dinh Xa, Boi Cau, Don
Xa, Bo De, An Lao, Tieu Dong, Binh Nghia, An Ninh, Trinh Xa, My Tho, La Son, Liem Tiet,
Thanh Luu, Liem Tuc, Thanh Hai, Thanh Tan, Thanh Nghi, Thanh Binh, Liem Can, Liem
Phong, Dai Cuong, Thuy Loi, Kha Phong, Ngoc Son, Van Xa, Tan Son, Nhan Binh, Bac Ly,
Hop Ly, Chau Son, Tien Hiep, Moc Nam, Dong Van town, Que, town, Kien Khe town, Vinh
Tru town, Quang Trung ward.
(Refer Appendix 1: Map of Project Site).
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 7
The Sub-project includes 03 items, namely:
Construction of MV wirelines:
- Medium voltage wireline : 23,176 km.
Transformer stations:
61 new transformer stations are built with total capacity of 10.910 kVA.
Rehabilitation and construction of 110,985 km of low voltage wireline.
- Rehabilitated Low Voltage Wirelines: 36,656 km.
- Low Voltage Wirelines: 14,335 km.
Table 1.2. – Project’s Items
Province- District/ commune Transformer
station/capacity (kVA) Wireline length
Number
of pylons
1. Phu Ly city
1.1 Thanh Chau 1/250 30
1.2 Phu Van 1/160 10
1.3 Chau Son 1/180 50 1
1.4 Quang Trung ward 1/160 20
Subtotal 1 4/750 1
2. Binh Luc district
2.1 Dinh Xa 1/180 177 3
2.2 Boi Cau 1/180 1,054 16
2.3 Don Xa 2/360 1,263 18
2.4 Bo De 2/340 501 7
2.5 An Lao 2/500 875 13
2.6 Tieu Dong 1/160 205 3
2.7 Binh Nghia 2/480 123 2
2.8 An Ninh 2/200 793 12
2.9 Trinh Xa 2/320 334 6
2.10 My Tho 1/100 94 2
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 8
Province- District/ commune Transformer
station/capacity (kVA) Wireline length
Number
of pylons
2.11 La Son 2/200 564 8
Subtotal 2 18/3020 90
3. Thanh Liem district
3.1 Liem Tiet 2/320 194 3
3.2 Thanh Luu 1/100 174 3
3.3 Liem Tuc 2/410 985 14
3.4 Thanh Hai 2/350 1,509 22
3.5 Thanh Tan 1/180 614 9
3.6 Thanh Nghi 1/100 855 13
3.7 Thanh Binh 1/320 677 9
3.8 Liem Can 2/570 496 7
3.9 Liem Phong 1/100 265 4
3.10 Kien Khe town 2/570 1.008 14
Subtotal 3 15/3020 98
4. Kim Bang district
4.1 Dai Cuong 2/410 829 14
4.2 Thuy Loi 2/360 312 5
4.3 Kha Phong 2/260 291 4
4.4 Ngoc Son 2/410 899 11
4.5 Van Xa 2/340 2,091 28
4.6 Que town 2/320 658 9
4.7 Tan Son 2/410 1,855 25
Subtotal 4 14/2510 96
5. Ly Nhan district
5.1 Nhan Binh 1/100 251 5
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 9
Province- District/ commune Transformer
station/capacity (kVA) Wireline length
Number
of pylons
5.2 Bac Ly 1/160 12
5.3 Hop Ly 1/250 386 7
5.4 Vinh Tru town 1/180 135 2
Subtotal 5 4/690 14
6. Duy Tien district
6.1 Chau Son 1/100 227 4
6.2 Tien Hiep 1/180 820 12
6.3 Moc Nam 2/360 566 8
6.4 Dong Van town 2/280 975 12
Subtotal 6 6/920 36
1.2.1. Wireline specifications
- Voltage rate: 35; 22 kV
- Number of circuits: 01
- ROW: 9 m
- Electric wire: AC 50/8
- Insulation Vertical insulator
- Pylon Centrifugal concrete
- Pylon height From 12m to 18m
- Average distance among pylons 100 m
- Pile foundation area: 3 m2
1.2.2. Specifications of Transformer station
- Transformer stations: 35(22)/0.4kV
+ Medium voltage rate: 35; 22kV
+ Low voltage rate: 0.4kV
- Capacity: 75-250 kVA.
- Construction area of the station: 9x5m2
1.3. RESETTLEMENT OBJECTIVES
The Resettlement Plan (RP) is prepared with objectives as follows:
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 10
- To avoid or at least minimize unexpected resettlement by selecting feasible design
plans.
- In case unexpected resettlement is unavoidable, resettlement activities must be
prepared and implemented in accordance with the sustainable development
programs and proper investment supports must be provided, enabling DPs to benefit
from the subproject. DPs shall be fully consulted and entitled to participate into
preparation and implementation of RP.
- DPs shall be compensated for their damages and provided with full life recovery
measures to support them to better improve or at least maintain the living standards
and their production capacity as well as income the same as the time before
launching the project.
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 11
2. THE PROJECT’S IMPACT LEVEL
2.1. DETERMINING PROJECT’S IMPACTS
2.1.1. Determining the Project’s impact coverage:
The Sub-project’s impact coverage is only:
Pile foundation construction site: 3.208 m2
- The area surrounding the pier foundation construction area during construction,
temporarily affected area in the wireline- with average of approximately 15m width- the route
is only calculated for cultivated land. Land area which is possible to be affected: 18.780 m2
(for column and wiring parts)
Temporary service road is not required because it was constructed previously with very good
quality; hence, land acquisition for this item is not conducted.
2.1.2. Determining Displaced Persons (DPs)
According to the survey findings, 126 households with 527 DPs were available, in which rate
of recovered land rate was from 0.30% to 5.06%, including:
DPs whose cultivated land was partially or totally affected (temporarily or
permanently);
DPs who have crops and perennial trees and/or crops affected totally or partially
(temporarily).
Vulnerable groups to be affected in the Subproject: N/A
Summary results are presented in following tables
(For details, refer to Appendix 8: Checklist of Displaced Persons (DPs)):
Total Displaced Persons are 126 households with 527 persons.
No. District/commune Number of affected
households
Number of Displaced
Person
I Phu Ly city 4 18
1 Thanh Chau 4 18
2 Phu Van 0 0
3 Chau Son 0 0
4 Quang Trung ward 0 0
II Binh Luc district 12 56
5 Dinh Xa 5 22
6 Boi Cau 3 15
7 Don Xa 0 0
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 12
No. District/commune Number of affected
households
Number of Displaced
Person
8 Bo De 0 0
9 An Lao 0 0
10 Tieu Dong 0 0
11 Binh Nghia 0 0
12 An Ninh 0 0
13 Trinh Xa 0 0
14 My Tho 0 0
15 La Son 4 19
III Thanh Liem district 52 212
16 Liem Tiet 8 34
17 Thanh Luu 4 16
18 Liem Tuc 0 0
19 Thanh Hai 9 36
20 Thanh Tan 0 0
21 Thanh Nghi 13 55
22 Thanh Binh 10 42
23 Liem Can 0 0
24 Liem Phong 3 9
25 Kien Khe town 5 20
IV Kim Bang district 45 190
26 Dai Cuong 6 30
27 Thuy Loi 6 23
28 Kha Phong 5 23
29 Ngoc Son 6 27
30 Van Xa 6 25
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 13
No. District/commune Number of affected
households
Number of Displaced
Person
31 Que town 7 29
32 Tan Son 9 33
V Ly Nhan district 9 35
33 Nhan Binh 1 3
34 Bac Ly 0 0
35 Hop Ly 8 32
36 Vinh Tru town 0 0
VI Duy Tien district 4 16
37 Chau Son 0 0
38 Tien Hiep 0 0
39 Moc Nam 1 4
40 Dong Van town 3 12
Total: 126 527
House
hold person
Total DPs 126 527
in which
DPs with permanent impact
– DPs who are reclaimed with less than 10% of total cultivated
land: 126 527
- DPs whose crops are permanently affected 111 463
- DPs whose perennial trees are permanently affected: 13 55
Total DPs with permanent impact: 126 527
DPs having temporarily impacts
– DPs whose cultivated land is temporarily affected 124 518
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 14
House
hold person
DPs having temporarily impacts 124 518
Notes: A household may be categorized into two types of impacts.
Total DPs by impact category
Impact category Household person
1 Garden land is temporarily acquired in the ROW
without building or structures in the ROW 13 55
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 15
2.2. DIFFERENT TYPES OF IMPACTS IN THE PROJECT
DPs’ impacts in this Subproject are only:
- Permanent land acquisition due to foundation construction.
- Temporarily acquisition of cultivated land (field land) during project performance.
- Permanent impacts on crops in the expected foundation construction areas.
- Temporary impacts on crops surrounding pier foundation, wirelines and ROW.
- Impacts on trees in ROW, high trees shall be cut down (distance from tree top to the
lowest wire is no less than 4m) and high trees near ROW may touch wireline in case
of falling.
- Results are described in following tables:
Permanently affected cultivated land
No. Name of district/commune
Temporarily occupied land area
Paddy field
land (crop)
(m2)
Hill land
(garden)
(m2)
Public land
(m2)
Total
(m2)
Phu Ly city
1 Thanh Chau 20 24 0 44
2 Phu Van 19 19
3 Chau Son 19 19
4 Quang Trung ward 18 18
Binh Luc district
5 Dinh Xa 64 0 64
6 Boi Cau 86 3 89
7 Don Xa 85 85
8 Bo De 81 81
9 An Lao 78 78
10 Tieu Dong 36 36
11 Binh Nghia 39 39
12 An Ninh 187 187
13 Trinh Xa 96 96
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 16
No. Name of district/commune
Temporarily occupied land area
Paddy field
land (crop)
(m2)
Hill land
(garden)
(m2)
Public land
(m2)
Total
(m2)
14 My Tho 34 34
15 La Son 41 54 95
Thanh Liem district
16 Liem Tiet 82 0 82
17 Thanh Luu 46 0 46
18 Liem Tuc 75 75
19 Thanh Hai 96 0 96
20 Thanh Tan 84 84
21 Thanh Nghi 145 0 145
22 Thanh Binh 39 0 39
23 Liem Can 77 77
24 Liem Phong 36 0 36
25 Kien Khe town 105 73 178
Kim Bang district
26 Dai Cuong 87 0 87
27 Thuy Loi 95 0 95
28 Kha Phong 112 0 112
29 Ngoc Son 102 0 102
30 Van Xa 143 0 143
31 Que town 94 0 94
32 Tan Son 191 0 191
Ly Nhan district
33 Nhan Binh 20 10 30
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 17
No. Name of district/commune
Temporarily occupied land area
Paddy field
land (crop)
(m2)
Hill land
(garden)
(m2)
Public land
(m2)
Total
(m2)
34 Bac Ly 29 29
35 Hop Ly 74 0 74
36 Vinh Tru town 35 35
Duy Tien district 0 0
37 Chau Son 51 51
38 Tien Hiep 66 66
39 Moc Nam 18 98 116
40 Dong Van town 27 114 141
Total: 1,578 169 1,461 3,208
Cultivated land with temporary impact
No, Name of district/commune
Temporarily occupied land area
Paddy
field land
(crop)
(m2)
Hill land
(garden)
(m2)
Public land
(m2) Total (m2)
Phu Ly city
1 Thanh Chau 50 0 0 50
2 Phu Van 50 50
3 Chau Son 50 50
4 Quang Trung ward 50 50
Binh Luc district
5 Dinh Xa 150 0 150
6 Boi Cau 630 0 630
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 18
No, Name of district/commune
Temporarily occupied land area
Paddy
field land
(crop)
(m2)
Hill land
(garden)
(m2)
Public land
(m2) Total (m2)
7 Don Xa 580 580
8 Bo De 540 540
9 An Lao 650 650
10 Tieu Dong 300 300
11 Binh Nghia 200 200
12 An Ninh 540 540
13 Trinh Xa 340 340
14 My Tho 100 100
15 La Son 190 250 440
Thanh Liem district
16 Liem Tiet 200 0 200
17 Thanh Luu 150 0 150
18 Liem Tuc 540 540
19 Thanh Hai 730 0 730
20 Thanh Tan 730 730
21 Thanh Nghi 1,510 0 1,510
22 Thanh Binh 340 0 340
23 Liem Can 480 480
24 Liem Phong 290 0 290
25 Kien Khe town 560 180 740
Kim Bang district
26 Dai Cuong 440 0 440
27 Thuy Loi 340 0 340
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 19
No, Name of district/commune
Temporarily occupied land area
Paddy
field land
(crop)
(m2)
Hill land
(garden)
(m2)
Public land
(m2) Total (m2)
28 Kha Phong 250 0 250
29 Ngoc Son 540 0 540
30 Van Xa 1,260 0 1,260
31 Que town 530 0 530
32 Tan Son 1,060 0 1,060
Ly Nhan district
33 Nhan Binh 50 100 150
34 Bac Ly 50 50
35 Hop Ly 680 0 680
36 Vinh Tru town 150 150
Duy Tien district
37 Chau Son 390 390
38 Tien Hiep 680 680
39 Moc Nam 60 380 440
40 Dong Van town 130 1,310 1,440
Total: 8,630 1,510 8,640 18,780
Quantity and category of affected perennial trees
Unit: Tree
No, Name of district/commune
Types of trees
Eucalyptus,
acacia Longan Mango
(wood tree) (fruit tree) (fruit tree)
Thanh Liem district
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 20
No, Name of district/commune
Types of trees
Eucalyptus,
acacia Longan Mango
(wood tree) (fruit tree) (fruit tree)
1 Thanh Nghi commune 295 0 0
Total: 295 0 0
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 21
3. LEGAL FRAMEWORK AND AFFECTED BENEFITS
The Resettlement Plan of the Resettlement Plan for Rural Energy - Additional
Financing (Phase 4) Subproject in Ha Nam is prepared in accordance with the policy
framework of the additional financing RE2 project. Accordingly, legal framework for
compensation and resettlement activities shall be based on Resettlement Policy Framework of
the RE2.
Laws and policies applied for compensation and resettlement implementation include (i)
policies of WB; (ii) valid policies on compensation, support and resettlement of the
Government of Vietnam and (iii) procedures on compensation, support and resettlement of the
local authority (Ha Nam province).
Regarding WB’s policy, policy on Reluctant Resettlement (OP 4.12) shall be applied.
Regulations on compensation, support and resettlement promulgated by the Vietnamese
Government applied in RP performance of this Subproject include:
Constitution of the Socialist Republic of Vietnam in 1992 confirms civil rights on
house ownership and protects such ownership.
Law on Land in 2003 promulgated on 10th
December 2003.
Decree No. 181/2004/ND–CP dated 29th
October 2004 of the Government on
guiding implementation of Law on Land in 2003.
Decree No. 188/2004/ND–CP dated 16th
November 2004 of the Government on
method of determining land price and price framework for land category/grade.
Decree No. 197/2004/ND-CP dated 3rd
December 2004 of the Government on
compensation, support and resettlement when land is reclaimed by the State.
Circular No. 01/2005/TT–BTNMT of the Ministry of Natural Resources and
Environment dated 13th
April 2005 on guiding implementation of some articles of
Decree No. 181/2004/ND–CP dated 29th October 2004 of the Government on
implementing Law on Land.
Decree No. 106/2005/ND–CP dated 17th August 2005 of the Government on
protecting high voltage power grid safety.
Decree No. 84/2007/ND–CP dated 25th
May 2007 of the Government with
additional provisions on issuance of land use right certificates: on land recovery:
on exercise of land use rights: on order and procedures for compensation,
assistance and resettlement when the State recovers land and on resolution of
complaints about land.
Decree No 123/2007/ND dated 27th July 2007 of the Government on amending
and supplementing some articles of Decree No. 188/2004/ND dated 16th
November 2004 on method of determining land price and price framework of
different types of land.
Circular No. 145/2007/TT–BTC dated 6th
December 2007 of Ministry of Finance
on guiding implementation of Decree No. 188/2004/ND–CP and Decree No.
123/2007/ND–CP.
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 22
Decree No. 69/2009/ND-CP dated 13th
August 2009 of the Government on
additionally providing for land use planning, land prices, land recovery,
compensation, support and resettlement.
Circular No. 14/2009/TT–BTNMT dated 1st October 2009 of Ministry of Natural
Resources and Environment on prescribing details on compensation, support,
resettlement and order and procedures of land acquisition, handing-over and lease.
Decree No 81/2009/ND dated 12th October 2009 of the Government on amending
and supplementing some articles of Decree No. 106/2005/ND-CP.
Circular No. 03/2010/TT–BTC dated 22nd January 2010 of Ministry of Industry
and Trade on prescribing some articles in Decree No. 106/2005/ND–CP and
Decree No. 81/2009/ND–CP.
Circular No. 57/2010/TT–BTC dated 16th April 2010 of Ministry of Finance on
amending regulations on estimates preparation, use and settlement of expenses for
compensation, support and resettlement when the State recovers land.
Valid regulations on compensation, support and resettlement of the local authority applied in
the Subproject’s RP include:
Decision No. 37/2009/QD-UBND dated 29th December 2009 of Ha Nam
Provincial People’s Committee on announcing land price in the province.
Decision No. 28/2011/QD-UBND dated 22nd August 2011 of Ha Nam Provincial
People’s Committee on unit price of compensating crops when land is recovered
by the State in the province.
Compatibility between accesses of the Government and the bank and necessary
exemptions:
The valid laws, decrees and regulations make the resettlement policies and practices of
the Vietnamese Government is increasingly suitable with the WB’s Resettlement Policy.
Differences between laws and decrees of the Government and WB relating to compensation,
resettlement and how to settle differences are described in Table 1 of Resettlement Policy
Framework of additional financing RE2 project (Refer to Table 1 in Appendix 2. Policy
Framework). In case of inconsistency, WB’s policies shall be applied. This is suitable with
Decree No. 131/2006/ND–CP on Regulations of ODA resource management and use.
Principles on compensation and resettlement applied for the Subproject:
WB’s principles of Action Policy OP 4.12 are applied for Policy Framework in this RP.
Accordingly, following principles and objectives are applied:
a) Land and asset recovery and resettlement shall be minimized at lowest as possible.
b) All DPs having residential land, production and business land or cultivated land in
ROW of D/L, surrounding pile foundation, station area and construction road under
the Project till the project’s notice date and basic information survey date shall be
entitled to receive life recovery measures, sufficient for them to improve or at least
maintain their living standards and income from the project profit. Insufficiency of
legal benefits for damaged real estates shall not prevent DPs from receiving rights to
enjoy this life recovery measures.
c) The life recovery measures are: (i) compensation at replacement price for buildings
and other structures without depreciation and deduction on materials re-use, (ii)
cultivated land is compensated with cultivated land with similar value acceptable to
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 23
DPs or compensation in cash with replacement value as desired by DPs is applied, (iii)
residential land is compensated with land of the same area acceptable to DPs or
compensation in cash with replacement price is applied as desired by DPs, and (iv)
allowances on transportation and removal.
d) The residential land and agricultural land shall be compensated at the highest value
close to the damaged land, acceptable to DPs.
e) Transitional period in resettlement shall be minimized and DPs are provided with life
recovery measures right before launching the project.
f) Plan on land and other real estate recovery as well as life recovery measures shall be
conducted through consulting DPs to minimize conflict. DPs shall receive their
benefits before the Project’s commencement date in the locality.
g) The pre-project service level and benefits of community shall be maintained or
improved.
h) Financial and material source for resettlement and life recovery shall be available as
necessary.
i) The legislative organization shall ensure effective planning, consultation and
implementation of RP as scheduled.
j) RP supervision and implementation evaluation shall be effectively conducted as
scheduled.
In addition to direct compensation for damages, DPs are entitled to receive benefits as
prescribed in Decree No. 197/2004/ND-CP, Decree No. 69/2009/ND-CP, and Decree No.
81/2009/ND-CP. Benefits/ allowances include:
a) Allowance for land in ROW
Regarding the residential land and other lands in the same land lot with the residential land in
ROW but not subject to the acquisition, compensation and support shall be offered, not
exceeding 80% of residential land acquisition compensation level in ROW as the case may be.
b) Allowance for houses in ROW
For houses and structures for living partial or total area in ROW, compensation of no more
than 70% of value shall be offered as the case may be due to limitation of use capacity and
impacts in the life.
c) Other recoveries
In addition to aforesaid information, any DPs whose impact is regarded as negligible shall be
applied with a series of program to recover subsistence fully and ensured to be compensated
with replacement price or at value of each separated works or the most expensive items
among those works which are regarded as reference "items".
Benefit matrix: (Refer to Appendix 3- Benefit Matrix)
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 24
4. COMPENSATION AND SUPPORT
4.1. COMPENSATION
Date of notifying the subproject: The project's notice date was determined before launching
the socio-economic and inventory survey dated 15th
March 2011. This date is officially
notified by local authorities right from the first community meeting launched at each
concerned commune.
Encroachers and persons living the expected area to be affected after such date shall not be
entitled to compensate and resettle. They shall be required to remove structures, cut down
trees or harvest crops to make site clearance for the project. However, no penalties are paid by
them. The project’s notice date and terms on “no compensation for encroachers” have been
clearly notified in community meetings.
Replacement price: In this Subproject, damages only cover land and crops. The survey
findings revealed that construction of transformer station and wireline (construction and
rehabilitation) in this Subproject is conducted in rural areas where rice cultivation and crops
are main job with long-term stability. In these areas, almost no transactions on selling or
buying land, trees or crops are available (they often transfer land to their descendents and
relatives). Through consultation with the local authorities (Phu Ly city, Thanh Liem district,
Binh Luc district, Kim Bang district, Ly Nhan district, Duy Tien district and communes),
compensation price for land, trees and crops shall be applied with unit price released by PPC.
Compensation unit price announced in public in the community consultancy meeting is
accepted by affected households.
Such compensation price determined in this RP is temporarily calculated in accordance with
price schedule issued by the Ha Nam PPC.
- Decision No. 42/2010/QD-UBND dated 21st December 2010 of Ha Nam Provincial
People’s Committee on prescribing different prices in the province.
- Decision No. 09/2011/QD-UBND dated 28th
March 2011 of Ha Nam Provincial
People’s Committee on prescribing unit price of compensating crops when land is
recovered by the State.
It is noticed that land unit price used in this RP is only for estimates (during preparation of
this RP). At the date of RP performance (expected in 2012), the land compensation unit price
shall be updated to ensure that DPs shall be compensated at replacement price for their
damages.
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 25
4.1.1. Compensation unit price for land
Permanent compensation unit price for land
Unit: VND/m2
No. District
Paddy field land
(crop)
Hill land
(garden)
Unit price
(VND/m2)
Unit price
(VND/m2)
1 Ha Nam city 40,000 25,000
2 Binh Luc district 40,000 25,000
3 Thanh Liem district 40,000 25,000
4 Kim Bang district 40,000 25,000
5 Ly Nhan district 40,000 25,000
6 Duy Tien district 40,000 25,000
4.1.2. Unit price schedule for cultivated land with temporary impact Unit: VND/m
2
No. District
Paddy field land
(crop)
Hill land
(forest)
Unit price
(VND/m2)
Unit price
(VND/m2)
1 Ha Nam city 20,000 12,500
2 Binh Luc district 20,000 12,500
3 Thanh Liem district 20,000 12,500
4 Kim Bang district 20,000 12,500
5 Ly Nhan district 20,000 12,500
6 Duy Tien district 20,000 12,500
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 26
4.1.3. Compensation unit price for trees and crops
Table of compensation unit price for trees and crops
Unit price: VND
Types of trees Unit Ha Nam
province
Wood tree with diameter of 80 to <100mm Tree 50,000
Rice m2 6,000
4.1.4. Total compensation expenses for the project
Total compensation expenses for the project
Table 4.1.4.1. Phu Ly city
No. Compensation items Unit Quantity Unit
price Amount
1 Permanent recovery
Land
- Garden (forest) m2 24 25,000 600,000
- Paddy field m2 20 40,000 800,000
Tree
- Eucalyptus, acacia (foot
diameter of 80-100mm) Tree 0 50,000 0
Crops
- Rice m2 20 6,000 120,000
Subtotal 1 1,520,000
2 Temporary recovery (limit land use capacity)
Land
- Garden (forest) m2 0 12,500 0
- Paddy field m2 50 20,000 1,000,000
Tree
- Eucalyptus, acacia (foot Tree 0 50,000 0
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 27
No. Compensation items Unit Quantity Unit
price Amount
diameter of 80-100mm)
Crops
- Rice m2 50 6,000 300,000
Subtotal 2 1,300,000
Total 2,820,000
Table 4.1.4.2. Phu Binh district
No. Compensation items Unit Quantity Unit
price Amount
1 Permanent recovery
Land
- Garden (forest) m2 0 25,000 0
- Paddy field m2 191 40,000 7,640,000
Tree
- Eucalyptus, acacia (foot
diameter of 80-100mm) Tree 0 50,000 0
Crops
- Rice m2 191 6,000 1,146,000
Subtotal 1 8,786,000
2 Temporary recovery (limit land use capacity)
Land
- Garden (forest) m2 0 12,500 0
- Paddy field m2 970 20,000 19,400,000
Tree
- Eucalyptus, acacia (foot
diameter of 80-100mm) Tree 0 50,000 0
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 28
No. Compensation items Unit Quantity Unit
price Amount
Crops
- Rice m2 970 6,000 5,820,000
Subtotal 2 25,220,000
Total 34,006,000
Table 4.1.4.3. Thanh Liem district
No. Compensation items Unit Quantity Unit
price Amount
1 Permanent recovery
Land
- Garden (forest) m2 145 25,000 3,625,000
- Paddy field m2 404 40,000 16,160,000
Tree
- Eucalyptus, acacia (foot
diameter of 80-100mm) Tree 23 50,000 1,150,000
Crops
- Rice m2 404 6,000 2,424,000
Subtotal 1 23,359,000
2 Temporary recovery (limit land use capacity)
Land
- Garden (forest) m2 1,510 12,500 18,875,000
- Paddy field m2 2,270 20,000 45,400,000
Tree
- Eucalyptus, acacia (foot
diameter of 80-100mm) Tree 272 50,000 13,600,000
Crops
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 29
No. Compensation items Unit Quantity Unit
price Amount
- Rice m2 2,270 6,000 13,620,000
Subtotal 2 91,495,000
Total 114,854,000
Table 4.1.4.4. Kim Bang district
No. Compensation items Unit Quantity Unit
price Amount
1 Permanent recovery
Land
- Garden (forest) m2 0 25,000 0
- Paddy field m2 824 40,000 32,960,000
Tree
- Eucalyptus, acacia (foot
diameter of 80-100mm) Tree 0 50,000 0
Crops
- Rice m2 824 6,000 4,944,000
Subtotal 1 37,904,000
2 Temporary recovery (limit land use capacity)
Land
- Garden (forest) m2 0 12,500 0
- Paddy field m2 4,420 20,000 88,400,000
Tree
- Eucalyptus, acacia (foot
diameter of 80-100mm) Tree 0 50,000 0
Crops
- Rice m2 4,420 6,000 26,520,000
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 30
No. Compensation items Unit Quantity Unit
price Amount
Subtotal 2 114,920,000
Total 152,824,000
Table 4.1.4.5. Ly Nhan district
No. Compensation items Unit Quantity Unit
price Amount
1 Permanent recovery
Land
- Garden (forest) m2 0 25,000 0
- Paddy field m2 94 40,000 3,760,000
Tree
- Eucalyptus, acacia (foot
diameter of 80-100mm) Tree 0 50,000 0
Crops
- Rice m2 94 6,000 564,000
Subtotal 1 4,324,000
2 Temporary recovery (limit land use capacity)
Land
- Garden (forest) m2 0 12,500 0
- Paddy field m2 730 20,000 14,600,000
Tree
- Eucalyptus, acacia (foot
diameter of 10-20cm) Tree 0 50,000 0
Crops
- Rice m2 730 6,000 4,380,000
Subtotal 2 18,980,000
Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 31
No. Compensation items Unit Quantity Unit
price Amount
Total 23,304,000
Duy Tien district
No. Compensation items Unit Quantity Unit
price Amount
1 Permanent recovery
Land
- Garden (forest) m2 0 25,000 0
- Paddy field m2 45 40,000 1,800,000
Tree
- Eucalyptus, acacia (foot
diameter of 80-100mm) Tree 0 50,000 0
Crops
- Rice m2 45 6,000 270,000
Subtotal 1 2,070,000
2 Temporary recovery (limit land use capacity)
Land
- Garden (forest) m2 0 12,500 0
- Paddy field m2 190 20,000 3,800,000
Tree
- Eucalyptus, acacia (foot
diameter of 10-20cm) Tree 0 50,000 0
Crops
- Rice m2 190 6,000 1,140,000
Subtotal 2 4,940,000
Total 7,010,000
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 32
4.1.5. Compensation summary
No. Name of district/commune Permanent land
recovery
Temporary land
recovery Trees Rice Total
I Phu Ly city
1 Thanh Chau 1,400,000 1,000,000 0 420,000 2,820,000
2 Phu Van 0 0 0 0 0
3 Chau Son 0 0 0 0 0
4 Quang Trung ward 0 0 0 0 0
II Binh Luc district
5 Dinh Xa 2,560,000 3,000,000 0 1,284,000 6,844,000
6 Boi Cau 3,440,000 12,600,000 0 4,296,000 20,336,000
7 Don Xa 0 0 0 0 0
8 Bo De 0 0 0 0 0
9 An Lao 0 0 0 0 0
10 Tieu Dong 0 0 0 0 0
11 Binh Nghia 0 0 0 0 0
12 An Ninh 0 0 0 0 0
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 33
No. Name of district/commune Permanent land
recovery
Temporary land
recovery Trees Rice Total
13 Trinh Xa 0 0 0 0 0
14 My Tho 0 0 0 0 0
15 La Son 1,640,000 3,800,000 0 1,386,000 6,826,000
III Thanh Liem district
16 Liem Tiet 3,280,000 4,000,000 0 1,692,000 8,972,000
17 Thanh Luu 1,840,000 3,000,000 0 1,176,000 6,016,000
18 Liem Tuc
19 Thanh Hai 3,840,000 14,600,000 0 4,956,000 23,396,000
20 Thanh Tan 0 0 0 0 0
21 Thanh Nghi 3,625,000 18,875,000 14,750,000 0 37,250,000
22 Thanh Binh 1,560,000 6,800,000 0 2,274,000 10,634,000
23 Liem Can 0 0 0 0 0
24 Liem Phong 1,440,000 5,800,000 0 1,956,000 9,196,000
25 Kien Khe town 4,200,000 11,200,000 0 3,990,000 19,390,000
IV Kim Bang district
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 34
No. Name of district/commune Permanent land
recovery
Temporary land
recovery Trees Rice Total
26 Dai Cuong 3,480,000 8,800,000 0 3,162,000 15,442,000
27 Thuy Loi 3,800,000 6,800,000 0 2,610,000 13,210,000
28 Kha Phong 4,480,000 5,000,000 0 2,172,000 11,652,000
29 Ngoc Son 4,080,000 10,800,000 0 3,852,000 18,732,000
30 Van Xa 5,720,000 25,200,000 0 8,418,000 39,338,000
31 Que town 3,760,000 10,600,000 0 3,744,000 18,104,000
32 Tan Son 7,640,000 21,200,000 0 7,506,000 36,346,000
V Ly Nhan district
33 Nhan Binh 800,000 1,000,000 0 420,000 2,220,000
34 Bac Ly 0 0 0 0 0
35 Hop Ly 2,960,000 13,600,000 0 4,524,000 21,084,000
36 Vinh Tru town 0 0 0 0 0
VI Duy Tien district
37 Chau Son 0 0 0 0 0
38 Tien Hiep 0 0 0 0 0
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 35
No. Name of district/commune Permanent land
recovery
Temporary land
recovery Trees Rice Total
39 Moc Nam 720,000 1,200,000 0 468,000 2,388,000
40 Dong Van town 1,080,000 2,600,000 0 942,000 4,622,000
Total: 67,345,000 191,475,000 14,750,000 61,248,000 334,818,000
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 36
4.2. LIFE RECOVERY SUPPORT AND ALLOWANCE FOR DPS
In addition to direct compensation for damages of serious DPs (to be removed or lost over 10%
of land area), they are entitled to other supports (benefits/allowances) in accordance with the
project’s Policy Framework. However, in this Subproject, no DPs are subject to the above impact
group, hence, this RP offers no life recovery support activities.... Other impacts arisen during
performance shall be settled in accordance with the Project's Policy Framework.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 37
5. COMMUNITY CONSULTATION AND INFORMATION DISCLOSURE
5.1. COMMUNITY ENGAGEMENT AND CONSULTATION
The resettlement and compensation issues were firstly introduced to the local persons and
local authorities in meetings held in April and May 2011. The provincial/district level meetings
were organized in the office of PPC/DPC. Other community consultancy meetings were
launched in communes, each meeting lasted half day in each Subproject commune. All of these
meetings were held in offices of CPCs.
The district level meetings were attended by: leaders of Subproject districts,
representatives of provincial power companies, leaders of all Subproject communes. All
communal level meetings were participated by communal leaders, heads of mass organizations,
hamlet leaders and representatives of households.
The meeting included 2 parts. The first part introduced the printed materials such as:
Brochures of Project and Subproject, power grid maps. Technicians introduced about the
Subproject, including: selection criteria, expected route direction and compensation principles of
the Government and WB.
The second part was discussion with local persons regarding wireline direction, station
position, etc, as well as compensation issues and compensation measures. The communal leaders
and local persons unveiled their opinion about the Project and compensation-related issues. The
technicians recorded such opinions and took such opinions into calculation when preparing the
engineering design and Resettlement Action Report. Introduced materials included Summary of
the additional RE2 and Subproject, site maps, route direction and expected station position, etc.
In these meetings, land and tree price was discussed. Such prices were compared with the
market price and used as a reference to negotiate with households affected by the Subproject.
Minutes of these meeting were exercised with full signatures of representatives.
Socio-economic survey
The consultants launched the survey by direct interview and questionnaires from April to
May 211 for 100% of total DPs in communes. (See Table 5.1 for details.)
Table 5.1 – Summary of contributed opinions at the community consultancy meeting
No. Site/ Time/ Number of attendants Opinions
1 – Office of Thanh Chau CPC, Phu Ly city
- Time: 14th
April 2011
– Participants: 10 persons
– The Project Owner and the Consultant
are required to further clarify the
project’s impacts on environment, socio-
economic and compensation measures;
– The construction unit shall undertake and
compensate for transportation of sand,
stone and raw materials affected
environment and caused damages to
local persons.
2 – At the office of Boi Cau Communal
People’s Committee, Binh Luc district
- Time: 16th
April 2011
– Participants: 08 persons
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 38
No. Site/ Time/ Number of attendants Opinions
3 – The office of Kien Khe town’s People’s
Committee, Thanh Liem district
- Time: 18th
April 2011
– Participants: 08 persons
- Are local persons employed to undertake
the subproject construction?
The most concern is the impacts during
construction such as dust and dirty
pollution in construction site; it is
required to recover the intact conditions
before construction, land acquisition and
impacts on trees and crops are also
concerned. The local people hope that
site clearance shall be conducted after
harvesting is finished.
– The Project Owner should select
construction time after rice is harvested
to limit damages;
– The construction unit shall undertake and
compensate for transportation of sand,
stone and raw materials affected
environment and caused damages to
local persons.
– The Project Owner is required to
announce in public the Project’s
compensation policy so that DPs can
access to.
4 – Office of Que town’s People’s
Committee, Kim Bang district
- Time: 15th
April 2011
– Participants: 12 persons
5 – At the office of Hop Ly communal
People’s Committee, Ly Nhan district
- Time: 6th
April 2011
– Participants: 14 persons
6 – At the office of Dong Van town’s
People’s Committee, Duy Tien district
- Time: 21st April 2011
– Participants: 08 persons
In these meetings, land and tree price was discussed (in accordance with the Province’s applied
unit price framework). Such prices were compared with the market price and used as a reference
to negotiate with households affected by the Project.
Representatives of the Project Owner and the Consultant provided information about questions
of project performance period, land area of ROW, etc and acquired the contributed opinions.
They would consider and update it into the RP. In addition to other information available in the
materials distributed to representatives, following information was additionally provided to the
participants:
It acquired the opinion on public new release about compensation policy to affected
households; the information would be available in CPCs where the Project was located.
Moreover, it was also announced in the branch of project district power company
Temporarily occupied land during project performance would be calculated and properly
compensated by the Project Owner;
During wireline operation, agricultural production was still conducted in the ROW as
usual;
With the constructive spirit to rehabilitate the project in the old route background,
impacts on surrounding environment should be minimized, etc.
The aforesaid opinions and received opinions were updated in contents of this RP.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 39
5.2. INFORMATION RELEASE
RP report in Vietnamese shall be announced in DPCs affected by the Project and communal
offices under the project so that mass organizations and institutions concerned can access and
understand.
Copies of EMP report in English and Vietnamese shall be submitted to Vietnam Development
Information Center at 63 Ly Thai To, Hanoi to serve for concerned people to read, understand
and give out feedback about the materials.
The RP report in English shall be submitted to the WB’s Infor Shop in Washington for public
announcement.
5.3. CLAIMS AND DISPUTES
The project’s impact level is insignificant and entire RP implementation program is
conducted with DPs’ participation, hence, hopefully, that no claims shall not be available.
However, in order to ensure the DPs to have place to settle their claims (relating to compensation
and resettlement), the claim settlement procedures are successfully set up. The purpose is to
feedback against DPs’ claims in a prompt and transparent manner. The mechanism is developed
in accordance with the convenient, transparent and fair regulations. By settling claims at the
project level, the project progress may be stable.
Claim procedures are as follows:
Step 1 – Communal level:
If any one claims about any problems in the resettlement and life recovery program, he
may put forward such claim in writing or oral to the communal authority. In case of oral claim,
such claim shall be recorded and settled by the communal authority. The communal People’s
Committee shall settle the problem within 15 working days since the date of receiving claim.
Step 2 – District level:
If claimer is not satisfied with decisions in Step 1, his claim may be submitted to district
CRC. Within 15 working days since the date of receiving the decision in step 1, the district CRC
shall make decision relating to claims.
Step 3 – Provincial level:
If claimer is not satisfied with decisions in Step 2, his claim may be submitted to the
provincial CRC. Within 15 working days since the date of receiving the decision in step 2, the
provincial CRC shall make decision relating to claims.
According to the Decree No. 197/2004/ND-CP (Article 39), DPs are entitled to claim to
CRC or the corresponding PCs. Obligations, time and claim settlement procedures must comply
with Article 138 of Law on Land and Articles 162, 163 and 164 of Decision No. 181/2004/ND-
CP dated 29th
December 2004 of the Government on implementing Law on Land.
Step 4 – Claims at the court
If DPs are not satisfied with decisions in Step 3, his claim may be submitted to the
district’s court in accordance with “Civil Procedure Code”. Within 15 working days since the
date of receiving the decision in step 2, the problems must be freely settled in the district’s court.
Judgments of the court shall be legal basis for compensation.
DPs may claim about any problems of the resettlement and life recovery program,
including recommended compensation price.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 40
The claim procedures are publicized to DPs through community meetings and at offices
of RBs.
This information is recorded in RIB to popularize to RPs before commencement.
Figure 5.3 - Claim process
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 41
6. REPORT, MONITORING AND EVALUATION
6.1. INTERNAL MONITORING
PMU is responsible for launching internal monitoring for RP performance. The internal
inspection and monitoring aim at:
Verifying basic information about DPs, evaluating lost or damaged assets,
compensations, benefits of resettlement and life recovery conducted in accordance with
the regulations of the corresponding Policy Framework and RP.
Monitoring of RP is conducted as designed and approved.
Determining financial resources to implement RP is provided to PMUs in due date with
full quantity to fulfill the objectives; Such resources are properly used by PMUs as
prescribed in RP and Policy Framework.
All claims and explanations are recorded and it is ensured that such claims are properly
settled as scheduled.
Officials in-charge of site clearance resettlement and compensation of the unit performing the
subproject must update information based on some main activities, concretely:
Table 6.1 – Some main activities for internal monitoring and evaluation
No. Activities in RP
Implementatio
n Description
Yes No
1. To notify the local authorities and
people about the Project
2. To conduct inventory of damages
3. To inspect the replacement price
4. To prepare RP
5. To accept RP
- EVN/AMB
- Ha Nam PPC
- World Bank
6. Announce RP
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 42
No. Activities in RP
Implementatio
n Description
Yes No
Project site: 40 communes (wards
and towns), 06 districts (cities) in
Ha Nam province
- District power companies
where the Project is available
- VDIC/Infoshop
7. Measure, count and measure the
lot
8. Apply compensation price
(transform from RP)
9. Prepare specific compensation
plan
10. Approve compensation plan
11. Announce compensation plan
12. Adjust and approve (if any)
13. Pay compensation (including
updates against RP- for instance:
Quantity of DPs, expenses,
impact levels, etc)
14. Internal Monitoring
15. Independent supervision
16. Report on plan implementation
17. Collect and settle claims
18. Community engagement and
consultation
- Community meetings
- Provide leaflets
19. Cooperation with other agencies
(especially compensation
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 43
No. Activities in RP
Implementatio
n Description
Yes No
committee)
20. Interim and period end evaluation
(share with the Project)
6.2. SUPERVISION, INSPECTION AND EVALUATION
RP implementation must be inspected and supervised by NPC and PMB in combination
with the local PC.
The independent consultant shall be selected to undertake supervision tasks.
The selected supervisor shall sign contract with PMB right after RP is approved and
inspection and supervision activities are implemented when commencement period is initiated.
The internal inspection and supervision includes following activities:
- To inspect number of population and socio-economic surveys for DPs; to check statistics
on DPs' asset, status, job and living conditions; to supervise the compensation,
resettlement and life recovery implementation for DPs in accordance with conditions
acceptable to DPs.
- To check whether the compensation and resettlement implementation is implemented as
directed by DPs or not.
- To check availability and quality of replacement land area
- To check effectiveness of resettlement implementation and compensation funds
- To investigate fair evaluation on claims
- The internal inspection unit prepares the quarterly detailed reports on RP implementation
progress. Such reports shall be forwarded to the authorities at suitable levels, the World
Bank (WB) and external supervisor.
External supervision:
In addition to evaluating the quarterly reports, the investigations are prepared and
implemented similar to the internal audit by the independent internal officials. The independent
external supervisor is responsible for:
- Reviewing compensation unit prices applied for RP; inspecting field to ensure that the
compensation expenses corresponding to the replacement value when RP starts to be
launched, or vice versa, recommending NPC and PPC for adjustment.
- Evaluating DMSs and benefits for DPs
- Evaluating the Project’s socio-economic impacts for DPs.
- Supervising RP implementation to achieve RP’s objectives, especially “improving or at
least maintaining income and living conditions of DPs after resettlement”.
- Recommending the necessary amendments for the RP to obtain the RP’s objectives
- Giving out recommendations to improve the RP program
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 44
- Closely inspecting the compensation activities and being always available for claims
- Preparing the semi-annual report to submit to PMB and WB, the suitable authorities at
levels and representatives of DPs
- Designing the summary document sets after RP is completed in 6 months Such document
set includes: RP detailed evaluation and RP implementation; the document also covers
DPs’ interview on their status after being compensated and resettled as well as opinions
of DPs
- Finally, according to the RP implementation experience background, such document must
give out recommendations to improve RP effectiveness and future RPs.
Terms of Reference (TOR) for independent audit are composed and submitted to WB by
NPC to gain agreement before inviting the independent supervisor.
6.3. REPORTING REGIME
RP implementation shall be inspected and monitored by PC/PMUs of PCs in cooperation
with PCs at all levels and independent supervisors. The quarterly report shall be prepared and
submitted to EVN, PCs, Project Province Power Companies and WB.
A RP is not regarded as a complete version till auditing is completed or surveyor
confirms that beneficiaries receive all benefits and income recovery work is conducted as
planned.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 45
7. IMPLEMENTATION PLAN
7.1. IMPLEMENTATION RESPONSIBILITY
Figure 7.1 – Diagram of RP implementation organization
EVN: Is the Project Owner and responsible for managing and surveying, designing, arranging
expenses, making payment and monitoring the RP implementation. Rural Power Sales
Committee under EVN is assigned as the direct management unit of the additional financing
RE2.
Northern Power Corporation (EVN – NPC): is responsible for employing the qualified
Consultant to prepare RP report; assigning qualified persons on social safety in AMB and PMUs,
recommending officials to participate into the Compensation and Resettlement Council.
Project Management Unit (PMU): PMU of AMB is responsible for directly managing the
Project’s routine activities, including preparing plan, program, expense sources and ensuring
total coordination and cooperation of resettlement compensation monitoring activities, designing,
exercising, monitoring, evaluating and cooperating with EVN and WB.
People’s Committee (PC): directs/ specifies clearly the obligations of relevant stakeholders in RP
implementation. PC shall approve unit price for compensation, allowance and resettlement land
as well as establish the appraisal councils and compensation committees at all levels as well as
compensation land. Claim settlement of the local DPs:
District People’s Committee (DPC): Directs the resettlement and compensation activities in their
district:
To direct units to launch survey on project’s impact, community consultancy,
popularizing policy on compensation, resettlement and RP implementation.
To establish District’s compensation council.
To acknowledge legal status of land use rights or ownership of other properties.
To appraise and approve compensation plans for DPs within the authority..
To promulgate regulations and procedures to settle administrative issues relating to
the project’s implementation of resettlement compensation in the district.
To settle claims of DPs at district level.
District compensation & resettlement council: Is lead by a Vice Chairman of DPC. The District
Compensation Council includes representatives from Department of Finance, Department of
Natural Resources and Environment, Department of Planning & Investment, Department of
Trade and Industry, affected CPCs, DPs and PMU. The council is the key agency in charge of
implementing the RP in the district. The District CRC shall:
Check compensation unit price applied in RP, recommend adjustment to the unit price
in accordance with market price/ replacement price (if necessary).
Cooperate with PMU to organize meetings with DPs and community to deliver
information materials about compensation & resettlement, detailed measurement
schedule and benefit frame of DPs.
Prepare the detailed implementation plan (quarterly, semi-annual and annual plan)
and work closely with PMB to pay DPs’ benefits as scheduled in accordance with the
policy and RP approval process.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 46
Especially focus on demand and requirements of specific community groups (minor
ethnic groups) and vulnerable community groups (children, elder/women as the house
owner/single women).
Settle questions and claims of DP, difficulties during implementation and giving out
solutions for outstanding issues to the PPC.
Communal People’s Committee (CPC): The CPC is responsible for:
Assigning special officials to facilitate implementation of all compensation &
resettlement in the commune.
Participate into population survey, statistics and detailed measurements: Assisting
unit in-charge to make population survey, investigate replacement price, detailed
measurements and other compensation & resettlement activities.
Cooperate with the district CRC in community meetings, popularize information and
make payment for compensation/support to DPs.
Checking and verifying legal status of affected properties such as land, building,
structures and other assets of DPs.
Involving in activities relating to land acquisition & allocation, resettlement, life
recovery measures as well as social development support activities.
Support DPs in resettlement and life recovery activities. Co-certifying (signing)
compensation documents with DPs.
Determining list of poor and difficult DPs.
Ensuring proper mechanism on claim/ dispute settlement Settling claims at communal
level and forwarding all DPs’ opinion to the District CRC to suggest solutions for
shortcomings (if any). Providing evidence of DPs’ claims and maintaining claim
records. Assisting and consulting DPs to promptly settle their claims.
Assisting local persons to overcome difficulties in the construction phase, supporting
DPs to repair their houses. Arranging land in case DPs need to be compensated with
land.
Displaced Persons (DPs): DPs make available for RP-related documents such as Certificate of
Land Use Rights and ownership of other properties. DPs must carefully check affected assets
with compensated benefits and timely conduct site clearance when receiving all compensation.
External independent supervisor: is in charge of RP implementation supervision and evaluation
for the entire Project. The external independent supervisor shall submit periodic monitoring
report during implementing compensation & resettlement and give out recommendations for
known issues to PMU and WB.
7.2. IMPLEMENTATION PERIOD
Expected implementation period:
PMU and CRC:
1. To establish CRC (available)*
2. To launch community information The 1st month
3. To start detailed measurement, inventory and survey of assets The 2nd
month
* District CRC has been available for on-going projects in localities.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 47
4. To pay compensation The third month
DP:
1. To declare quantity and status of assets The first month
2. To receive compensation and conduct site clearance The third month
Bid invitation:
To start tendering equipment The fifth month
Construction and installation:
To launch measurement and drawing works The sixth month
(Estimated construction and installation progress is approximately 03 months)
Supervision: From the 5th
month to 9th
month
Notes With negligible impacts (without resettlement) and proper human resources, the
community information work, detailed measurement and inventory are expected
to be completed within 2 months and the factual compensation would be
completed within 1 month.
The aforesaid execution progress is discussed between the Consultant and
PMU, taking into consideration quantity of project’s works, quantity of related
communes in each district, proper human resources and capacity to launch
multiple activities.
All RP activities must be successfully completed before WB releases Letter of No
Objection for Subprojects. Any changes in RP after WB’s approval is obtained must be reviewed
before implementing by WB’s representative office in Hanoi.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 48
8. EXPENSES
Expenses for RP performance: EVN.
SPC shall transfer such fud to PMU, then PMU and the district CRC are responsible for:
(i) Paying compensation expense to DPs, and
(ii) Making payment for expenses of all RP operations.
8.1. EXPENDITURES OF RP PERFORMANCE
Expenditures of RP Performance include:
8.1.1. Expenses for preparing RP and detailed measurement
Expense for RP preparation
In the initial phase of RP preparation, a field worker staff is established. Such force shall
conduct (a) design study and field survey, (b) prepare survey templates and statistics
schedules (with primary measurement of real estate and asset inventory), (c) community
meetings and consultancy and distribute leaflets/questionnaires relating to the project, etc, (d)
data processing and (e) RP preparation for approval.
PMU of AMB entered the contract with the Consultant to launch the aforesaid works:
Contract value with the Consultant*: 55,187,640 VND
Expenses for detailed measurement and inventory
Regarding the RP performance, groups supporting works of the district CRC are mobilized to
launch (a) preparation of detailed measurement and statistic schedule, resettlement
information materials, (b) community meetings, (c) detailed measurement and inventory, (d)
negotiation with DPs and (e) completing compensation schedules for DPs and submitting it to
the district CRC for approval. The following human resources are estimated in accordance
with the quantity of local DPs as well as their affected real estates.
Expenses for detailed measurement and inventory (temporarily calculated)
180,000,000VND
Total expenses for RP and detailed measurement preparation:
235,187,640 VND
8.1.2. Compensation expense
Compensation for permanently and temporarily reclaimed land.
Compensation for temporarily and permanently affected trees and crops (including
cost for cutting trees down);
(For details, refer to Section 4.1.4 Total compensation expenses for the project)
8.1.3. Project management expense
Expenses for human resources of PMU and CRC: Including basic salary and allowances for
administrative organization. PMBs and CRCs must cover many works during project
performance and only some persons are entitled to sign the labor contract within a certain
period of time.
* During preparing this RP, the contract has not been entered yet. The aforesaid value is estimated and
recommended by the Consultant.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 49
Project management expense (temporarily calculated)
100,000,000 VND
Expenses for training, conference and information popularization: An intermediate and
elementary training course is expected to organize at the date of commencing RP performance
and a conference is expected to organize when compensation payment is initiated. In order to
facilitate the local management divisions, the short-term training courses and conferences are
recommended to launch: 01 day in Ha Nam province
Expenses for training courses and conference: 50,000,000 VND
(including expenses of technical consultancy, materials and administration)
8.1.4. Supervision expenses
Expenses for external independent supervisor: Because it is impossible to estimate exactly
expenses, it is approximately 2% of total compensation and RP preparation expenses.
8.1.5. Provision
As at the expected date of implementing RP (expected in 2012) and experience from
implemented and on-going projects with similar nature, the provision funds is about 20% of
total compensation and RP preparation expenses.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 50
8.2. TOTAL ESTIMATES FOR RP PERFORMANCE
Table 8.2 - Total estimates of RP performance
Unit: VND
Items Amount
1, RP preparation & detailed measurement
The initial phase (RP preparation) 55,187,640
Execution phase (detailed measurement & inventory) 180,000,000
Subtotal 1 235,187,640
2, Compensation
Permanent land recovery 67,345,000
Temporary recovery of land (limit land use capacity) 191,475,000
Perennial trees 14,750,000
Crops 61,248,000
Subtotal 2 334,818,000
3, Management
Management 100,000,000
Training, conference and information popularization, etc 50,000,000
Subtotal 3 150,000,000
4, External independent supervisor = 2% of (1+2)
Subtotal 4 11,400,113
5, Standby expense = 20% of (1+2)
Subtotal 5 114,001,128
Total(1+2+3+4+5) 845,406,881
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 51
Ap
pen
dix
1. Project area
2. Policy Framework
3. Benefit matrix
4. Route agreement
5. Minutes of community consultation
6. Sample questionnaires
7. Sample leaflet
8. Inventory of Displaced Persons (DPs)
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 52
1. PROJECT AREA
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 53
2. POLICY FRAMEWORK
1. This policy framework is prepared in accordance with OP/BP4.12 of the WB on
unexpected resettlement (December 2001). The basic objectives of this policy framework are
to ensure all DPs shall be compensated for their losses at the replacement price and provided
with life recovery measures to help them improving or at least, maintaining living standards
and income generation capacity like before having the project.
2. The resettlement policy framework gives out principles and objectives, eligible
criteria of DP, benefits, legislative framework, compensation and resettlement method,
engagement characteristics and claim procedures, guidelines on compensation, resettlement
and life recovery for DPs.
Table 1. Differences between the domestic laws and WB’s policies and policies of the RE2-
additional financing.
Main issue Law in Vietnam Policy of the World
Bank (WB)
The Project’s
policies
Persons have
no legal use
rights
Decree No. 69/2009, Article
14 (superseding Decree No.
197/2004, Article 8), PPC or
MPC under the central shall
consider to support as the
case may be.
Insufficiency of
legal rights for land
of some DPs does
not prevent them
from receiving
compensation.
All DPs, regardless of
ownership, social
status or economic
condition shall be
compensated or
supported for lost
assets, income or
business at
replacement price and
fully provided with
measures to support
them improve or at
least maintaining
living standards,
income and
production capacity
like before launching
the project
Land
compensation
at
replacement
price
Decree No. 123/2007
(amending Decree No.
188/2004), prescribing land
price and allowing PPC to
prescribe land price in the
province by establishing price
framework for all lands and
land prices for each type.
This price must not exceed or
lower than 20% of the
reference price. However, in
remote areas with difficult
Compensation or
support for all DPs
includes persons
having no legal land
ownership and all of
their damages at the
replacement price.
Replacement price
survey must be
conducted to ensure
the project’s
compensation level
for all types of
damages is equal to
the replacement
expenses at the date
of resettlement.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 54
Main issue Law in Vietnam Policy of the World
Bank (WB)
The Project’s
policies
socio-economic conditions
and poor infrastructure when
practical land price in the
market is lower than the
minimum price as stated in
the Decree, PPC shall adjust
specific price applied in the
province and report to
Ministry of Finance.
Article 1, Decree No.
69/2009/ND-CP prescribes
that if at the date of land
acquisition, land price
determined by PPC is
different from that in the
market in normal condition,
PPC shall re-determine land
price specifically and
properly.
Business
without
registration
Decree No. 187/2004,
Articles 26-28: Only
registered businesses are
eligible to receive support.
Regarding assets
excepting for land,
all eligible DPs,
having or not having
rights, should be
compensated at
replacement
expenses in cash or
replacement asset.
Including DPs as
tenants of the
buildings, land
lessees, workers of
affected businesses.
Businesses fail to
conduct legal
registration to receive
support in cash or in
kind including tenants
of building, land
leases and workers.
Recovery
support
provision
Decree No. 69/2009, Articles
20 & 22: DPs losing from
30% of production land and
above shall be supported to
stabilize life and vocational
training. Decree No. 17/2006
enhances this regulation and
provides long-term support to
poor households.
According to WB's
policy, impact is
considered to be
"negligible" if DPs
are not required to
remove and lost 10%
of production asset.
The Project shall
further support life
recovery for all DPs
with land-based
subsistence, including
persons who lost over
20% production land
(and 10% is applied
for poor and
vulnerable groups).
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 55
3. BENEFIT MATRIX
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
1 Temporary acquisition
of productive land in
ROW
All DPs have
trees, crops,
other assets in
ROW
DPs
with/without
land certificate
included in the
inventory or
able to prove
land
occupancy
prior to cut-off
date.
- Cash compensation for affected trees at the
replacement cost plus cost for cutting trees,
crops at market price. Number of crop
patterns to be compensated based on the
time of temporarily acquired of land.
- No compensation for land
- Rehabilitate land after the project
construction.
- Trees have to be cut are regulated by Article 5 of the
Government Decree 106/2005/ND-CP dt.Aug 17th
, 2005 on
the protection of the high voltage networks.
- PCs and local authorities determine and ensure that compensation for trees
will be at the replacement cost and for crops at the market price. If DP is
requested for cutting affected trees, PCs or Provinces will pay money for this work. DP has right for using salvageable trees.
- Full compensation at least 01 month before land clearance. Payment to DPs
will be delivered by PC and/or District Resettlement Committees (DRCs).
- Affected land in ROW will be rehabilitated by contractors
after the project construction and land in ROW could be used
with the restricted purposes.
- Finance available for compensation and well information
disclose/ disseminate to DPs and key stake holders.
2 Temporary acquisition
of residential and
garden land in ROW
without house or
structures in ROW
All DPs with
orchards or
trees in ROW
-do- - Cash compensation for affected fruit trees
and trees at replacement cost.
- No compensation for land
- Rehabilitate land after the project
construction.
- Trees have to be cut are regulated by Article 5 of the
Government Decree 106/2005/ND-CP dt.Aug 17th
, 2005 on
the protection of the high voltage networks.
- PCs and local authorities determine and ensure that compensation for trees
will be at the replacement cost. If DP is requested for cutting affected trees, PC or Provinces will pay money for this work. DP has right for using
salvageable trees.
- Full compensation to DPs at least 01 month before land clearance. Affected land in ROW will be rehabilitated by contractors after the project
construction
- Payment to DPs will be delivered by PCs and DRCs
- Finance available for compensation and well information
disclose/ disseminate to DPs and key stake holders.
3 Temporary impact on
residential and
garden land. Partial
All DPs have
house/building
and trees/fruit
-do- House/ building:
- DP can opt for : i) Remain their houses or
- House and building have to be demolished or could be
existed are regulated by Article 5,6 of the Government Decree
106/2005/ND-CP dt.Aug 17th
, 2005 on the protection of the
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 56
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
house/building within
ROW (area in ROW
less than 10% of total
area) and the
demolished area does
not impact to the
remaining
house/building.
Residential land and
garden land outside of
ROW is sufficient for
re-organizing (not less
than 60 m2).
trees in ROW
building in ROW with the conditions
regulated by Article 6 of the Government
Decree 106/2005/ND-CP dt.Aug 17th
, 2005
on the protection of the high voltage
networks. Subsidy allowance for fireproof
materials and lightning arrestors for the
existing house/building; or ii) Cash
compensation for the directly affected
rooms at the replacement cost and cost for
demolishing an affected room.
- No compensation for land.
- Rehabilitate land after the project
construction by contractors.
Tree and fruit tree
- Compensation for affected trees and fruit
trees at the replacement cost.
Allowances:
- Relocating allowance of 30 kg of rice
equivalent per person per month in six
months.
high voltage networks.
- PCs and local authorities determine and ensure that
compensation will be paid at the replacement cost, without
deduction for salvageable materials.
- DPs will demolish the impacted part/ room and
reconstruct/or improve their houses themselves.
- Full compensation for trees and fruit trees at least 01 month before land
clearance. If DP is requested for cutting affected trees, PC or project provinces will pay money for this work. DP has right for using salvageable
trees.
- Full entitlement payment to DPs impacted on house/building
at least 03 months before land clearance.
- Payment to DPs will be delivered by PCs and/or DRCs
- Land in ROW could be used with restricted purposes.
- Finance available for compensation and well information
disclose/ disseminate to DPs and all key stake holders.
4 Temporary impact on
residential and or
garden land. Impact
more than 10% of
total house/building
area but the
demolished area will
All DPs have
house/building
and trees/fruit
trees in ROW
-do- House/ building:
- DP can opt for : i) Remain their houses or
building in ROW with the conditions
regulated by Article 6 of the Government
Decree 106/2005/ND-CP dt.Aug 17th
, 2005
- House and building have to be demolished or could be
existed are regulated by Article 6 of the Government Decree
106/2005/ND-CP dt.Aug 17th
, 2005 on the protection of the
high voltage networks.
- Consultation for DP’s options on remains their house in
ROW or move out of ROW.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 57
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
impact to the
remaining of
house/structure.
Land outside of ROW
is sufficient for
reorganizing (not less
than 60 m2).
on the protection of the high voltage
networks. Subsidy allowance for fireproof
materials and lightning arrestors for the
existing house/building; or ii) Cash
compensation at replacement cost for full
areas of impacted house/building and
demolish DP’s house in ROW.
- No compensation for land.
- Rehabilitate land after the project
construction by contractors.
Tree and fruit tree
- Compensation for affected trees and fruit
trees at the replacement cost.
Allowances:
- Relocation allowance of 30 kg of rice
equivalent per person per month in six
months.
- PCs and local authorities determine and ensure that
compensation will be replacement cost at the time of
payment.
- DPs will demolish the impacted areas and reconstruct/or
improve their houses themselves.
- Full compensation for trees and fruit trees to DPs at least 01 month before
land clearance. If DP is requested for cutting affected trees, PMB will pay
money for this work. DP has right for using salvageable trees.
- Full compensation payment for impacted house and
allowances to DPs at least 03 months before land clearance.
- Payment to DPs will be delivered by PCs and DRCs
- Cleared residential could be reused with other restricted
purposes.
- Finance available for compensation/ rehabilitation and well
information disclose/ disseminate
5 Temporary impact on
residential and or
garden land in ROW.
Full or partial
house/building
impacted and land
outside of is not
sufficient for
reorganizing (less
All DPs have
house/building
and trees, fruit
trees in ROW
-do- DPs can opt for one of the followings:
i) Remain their houses or building in
ROW with the conditions regulated
by Article 6 of the Government
- House and building have to be demolished or could be
existed are regulated by Article 6 of the Government Decree
106/2005/ND-CP dt.Aug 17th
, 2005 on the protection of the
high voltage networks.
- Consultation for DP’s options on remain their house in
ROW or move out of ROW
- PMB and local authorities determine and ensure that
compensation will be at replacement cost at the time of
payment.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 58
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
than 60 m2) Decree 106/2005/ND-CP dt.Aug
17th
, 2005 on the protection of the
high voltage networks. Subsidy
allowance for fireproof materials
and lightning arrestors for the
existing house/building; or ii) Cash
compensation for the whole
residential area which DP occupied
(not only for the impacted areas) and
properties associated with occupied
land at replacement cost. Impacted
land will be obtained by local
authorities; or iii) “Land for land”
with the same area which DP
occupied and cash at replacement
- Replacement land, and resettlement sites development
- DPs receive compensation will demolish the impacted house
areas and reconstruct/or improve their houses themselves.
- Full compensation payment for trees and fruit trees to DPs at least 01 month
before land clearance. If DP is requested for cutting affected trees, PCs or
project provinces will pay money for this work. DP has right for using salvageable trees.
- Full compensation for impacted house and allowances to
DPs at least 05 months before land clearance.
- Payment to DPs will be delivered by PCs and DRCs
- Cleared residential could be used with other restricted
purposes.
- Finance/ land available for rehabilitation and restoration and
well information disclose/ disseminate to DPs and key stake
holders..
- PCs and local authorities will consult with DP who are
eligible to restoration programs for their options and prepare
proposal for restoration programs in the period of RAP
implementation.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 59
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
cost for the affected assets
associated with land. Land occupied
by DP will be obtained by local
authorities.
- Compensation for affected trees and fruit
trees at the replacement cost.
Allowances:
- Relocating allowance of 30 kg of rice
equivalent per person per month in six
months
- Transportation allowance for relocating DP
according to the Compensation Decree
197/2004/ND-CP dated Dec 3rd
, 2004 of
GOV.
- Rehabilitation assistance if DPs
permanently losing business or more than
10% of their incomes.
- Incentive for relocating in a timely manner:
maximum 5,000,000 VND/HH
6 Permanent acquisition
of land for tower
foundations, substation
and access roads etc.
All DPs
occupied land
and properties
associated with
land
permanently
impacted by
towers
-do- For DP losing productive land:
a. Land loss less than 10% of their total
landholdings
- Cash compensation for the lost area if the
remaining plot is still economically viable.
- Cash compensation
for the whole
- Consultation for DP’s options on land compensation.
- PMB and local authorities determine and ensure that
compensation will be at replacement cost at the time of
payment.
- Replacement land, and resettlement sites development.
- DPs receiving compensation will demolish the impacted
areas and reconstruct/or improve their houses themselves.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 60
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
foundations,
substation and
access roads etc.
impacted plot if the
remaining plot is not
economically viable.
- Cash compensation
for properties
associated with land
b. Land loss equal or more than 10% of
their total landholdings:
DP
can
opt for
the
follow
ings:
i)“Land for land”
with the same area
and productive of
impacted area if the
remaining plots are
still economic viable
and for the whole
impacted plots if the
remaining plots are
not economic viable
ii) Cash for land at
the replacement cost.
- Compensation for trees and affected fruit
trees at the replacement cost.
- Full compensation for trees and fruit trees to DPs at least 01 month before
land clearance. If DP is requested for cutting affected trees, PMB will pay money for this work. DP has right for using salvageable trees.
- Full compensation for impacted house and allowances to
DPs at least 03 months before land clearance.
- No award civil work contract before completion of
compensation and reorganizing houses or relocation.
- Payment to DPs will be delivered by PCs and DRCs
- Finance/ land available for compensation/ rehabilitation and
well information disclose/ disseminate.
- PCs and local authorities will consult with DP who are
eligible to restoration for their options and prepare proposal for
restoration programs in the period of RAP implementation.
- DPs will be granted with Land Use Right Certificate without
payment of administrative fees.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 61
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
- Rehabilitation assistance.
For DP losing Residential and garden
land:
- If remaining land is sufficient for
reorganizing (not less than 60 m2): Cash
compensation for lost area and assets
associated with land.
- If remaining land is not sufficient for
reorganizing:
DP can opt for i) cash compensation at
replacement cost for land and assets on land,
or ii) “land for land” compensation for the
whole residential area which DP occupied
(not only for the impacted areas) and
properties associated with occupied land. For
affected house and building, the same
entitlement to DP of categories 3 or 4 or 5.
7 DP impacted on
business or other
services
All DPs
impacted on
business and
other services
-do- (a) Temporary impact on business or other
services.
Compensation for income lost in the
affected time
(b) Permanent impact on business or other
services.
(c) Rehabilitation assistance.
- Full compensation for incomes lost to DPs at least 01 month
before land clearance.
- PCs and local authorities will consult with DP who are
eligible to rehabilitation for their options and prepare
proposal for rehabilitation programs in the period of RAP
implementation.
8 Public Work
Temporary Impacts All impacted
institutional DPs
(who directly
All impacted
institutional
DPs shall be
Alternative measures to maintain the normal
functional of the public work (i.e road,
water supply, drainage system, telephone
Contract (s) with Contractor (s) should bear one article on this
specific responsibility of the contractor (s)
Approach for institutional DPs for cooperation
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 62
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
manage and
operate such
impacted public
work system)
approached in
advance for
cooperation for
impact
mitigation
measure as well
as measure for
maintaining the
normal
functioning of
their impacted
system by the
Contractor (s)
line ect)
Reinstatement after the project construction
All expense on alternative measures to
maintain the normal functioning of the
impacted system shall be born by
Contractor (s)
Arrange and pay the expenses for te alternative measures to
maintain the normal functioning of the impacted system to the
satisfaction of the institutional DPs.
Permanent Impacts -do- -do- Alternative measures to maintain the normal
functional of the public work (i.e road,
water supply, drainage system, telephone
line ect)
All expense on alternative measures to
maintain the normal functioning of the
impacted system shall be born by
Contractor (s)
-do-
Complete the work for “alternative solution” prior to
commencement of the project work.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 63
4. ROUTE AGREEMENT
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 64
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 65
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 66
5. MINUTES OF COMMUNITY CONSULTATION
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 67
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 68
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 69
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 70
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 71
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 72
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 73
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 74
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 75
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 76
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 77
6. SAMPLE QUESTIONNAIRES
QUESTIONNAIRES FOR SOCIO-ECONOMIC SURVEY OF AFFECTED
HOUSEHOLDS
(SubProject: ………………………………………)
I- General information
1. Name of household owner: ............................................. Male Female Set
code: ...........
2. Address:
Works: Project: Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam
province
Province/ city: Ha Nam city
District: ...................................................... Commune/Ward: ...................................................
Hamlet/Village::
..............................................................................................................................
3. Which ethnic group does the household belong to (specify):
................................................................................
4. Family members (dependants and family economic):
Estimated
No. Full name Relation with
household owner
Gende
r Age
Populati
on
Qualificati
on
Occupatio
n and
Employment
status
annual total
income
income
source (VND)
1
2
3
4
5
6
7
8
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 78
9
10
II - Income:
5. Income and income source:
No. Income source Estimated income in 2011
Remarks ( 1000 VND)
1 Salary
2 Cultivation
3 Farming
4 Forestation
5 Service
6 Others (specify)
7 Total
III – Savings and debts:
6. Does the family save money? Yes No
If yes, how much: ..................................... 106 VND
7. Is there any debt in the family? Yes No
If yes, how much: ..................................... 106 VND
II. LIVING CONDITION AND ENVIRONMENTAL HYGIENE
8. Could you please specify which water source is used to drink/serve for routine activities:
(Tick one of following boxes):
1. Unicef well in the family 4. Spring water
2. Unicef public wells 5. Rainwater
or other wells 6. Buying water from mobile tanks
3. Soil wells 7. Using water from irrigation canal
8. Wells to filter water from irrigation canal
9. Which toilet is used by the family?
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 79
(Tick one of following boxes):
1. Septic tank 4. Public restrooms
2. Vietnamese composting toilet 5. Discharging into river, spring and canal
3. Without private WC 6. Using unoccupied land lot, forest edge
10. What is lighting source of your family?
(Tick one of following boxes):
1. National or local power grid 4. Diesel
2. Battery 5. Others (specify)
3. Electric generator ...................................................
11. What are assets and production means of your family? (Specify quantity into column, if
having no, record “0”)
No. Asset category Quantity No. Asset category Quantity
1 Wood chairs and desks 11 Computer
2 Salon sets 12 Boat
3 Radio, music player 13 Ships
4 Video drive 14 Electric pump
5 Black& white TV set 15 Plough/ harrow
6 Color TV set 16 rice milling machine
7 Fridge 17 Car/ passenger car
8 Electric generator 18 Truck
9 Sewing machine 19 Motorbike
10 Telephone
III. Compensation and resettlement
12. Have you ever head about the "Rural Energy" Project?
Yes No
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 80
13. Do you agree to contribute a small part of your land to construct and rehabilitate the
power grid, if the Project requires?
Yes No
14. If your assets are lost, which compensation form would you like to take?
1. Land for land 2. In cash/ in kind 3. Both of them
15. How much does your affected land lot?
Land type……………. Unit price (1000 VND/m2): ................... Value (1000 VND):
...................
16. If it is required to remove houses, land and receive proper compensation from the Project,
are you ready to displace?
Yes: ........................ No: ........................
If "No”, please specify:
.......................................................................................................................................................
.......................................................................................................................................................
...................................................................................................................
17. If displacement is required, do you intend to:
a) live near the previous place: ............................. b) come to other areas in the same
district: ............................
c) within the province: .................... ; d) Come to other provinces: ................. ; I don’t
know: ...................
18. With amount to be compensated/supported, how would you like to use it:
.......................................................................................................................................................
.......................................................................................................................................................
19. Do you think there are other ways to minimize the Project’s adverse impacts on your
family?
- Construct works in the time which crops are unavailable:
- Compensate for lost crops:
- Employ family members of households who lost land to work for contractors:
- Others (specify): .......................................................................................................
...........................................................................................................................................
20. What the most necessary thing do your commune/village need (which demand is the most
important):
.......................................................................................................................................................
.......................................................................................................................................................
Dated …../…../2011
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 81
Field worker: ...........................................................
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 82
7. SAMPLE LEAFLET
The RE2- additional financing using WB loans to recover overload, loss in power
distribution power grid system of 34 communes (towns) in 07 districts, 01 city and 01 town of
Ha Nam province to supply power by rehabilitating and expanding the LV and MV grids.
Investment structure:
DVN: Road construction and installation
of wireline and MV stations
1. Which are households affected by the Project?
All households, agencies and individuals whose land and land-based assets such as
building and architectural structures, trees and crops situated in the ROW (wirelines
and transformer stations) shall be taken with land by the Project.
2. Who shall certify affected land area and assets?
PMU of PC shall provide Communal/District CRC with MV wireline
diagram with position of transformer stations.
The Communal/ District CRC is responsible for determining affected area
and conduct survey and statistics for affected assets.
Affected area is area situated in the ROW of overhead wire lines. ROW is
determined by distance of external cable to the side when the lines stay
(Decree No. 106/2005/ND-CP dated 17th August 2005 of the Government)
- 2m applied for voltage up to 22kV
- 3m applied for voltage up to 35kV
3. What are impact categories?
Permanent impact: Land, buildings & architectural structures, other assets
and trees (4m height) situated in the ROW of wireline and transformer
station.
Temporary impacts: Trees, crops and other assets affected during
construction
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 83
4. Is land in the ROW of wireline and transformer station recovered by the Project?
No. However, use of such land is restricted, only crop cultivation is
allowed and trees must not be higher than 4m.
5. Who shall be and shall not be compensated?
All households and agencies whose assets (land, buildings & architectural
structures, trees and crops) are affected by the Project and persons who
have Certificate of Land Use Rights for their assets before the closing date
shall be compensated and supported.
Encroached land and/or architectural structures after the closing date shall
not be compensated. Owner of such assets must remove their assets.
6. Which compensation price shall be applied?
Compensation price is prepared by the Provincial CRC, reflecting practical market
price of the locality as approved by PPC.
All DPs shall be compensated at replacement price- market price at the date of
compensation – for their affected assets without depreciating and discounting re-
use material value.
Affected land shall be compensated by land with similar grade or in cash.
7. What about the partially affected buildings?
In case affected part does not affect building structure and the remaining is
adequate to live, then the affected part shall be compensated.
In case affected part affects building structure and the remaining is
inadequate to live, then the entire building shall be compensated.
8 When shall DPs receive compensation payment and remove?
DPs shall be compensated with land, buildings & architectural structures,
trees and crops within at least 03 months before land occupation.
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 84
DPs whose assets are partially affected and required to resettle right in their
land shall be compensated with land, buildings & architectural structures,
trees and crops, etc within at least 02 months before land occupation.
DPs with affected trees and crops shall be only compensated at least 01
month before construction.
9. In addition to above benefits, is there any benefit for DPs?
Yes
In addition to compensation for land and other assets, DPs shall receive
transportation allowance and life support, etc. All allowances and supports
shall be specified in the RP.
10. In case DPs are only paid with a part of compensation and allowance but they are
required to remove or conduct site clearance?
DPs who only hand over land or conduct site clearance when receiving all
compensation and other benefits.
11. When receiving compensation, may DPs be required to contribute a certain
amount of money to an organization or is a certain amount of money retained by
the CRC?
No one is representative to collect or retain any amount of money, excepting
compensation expenses and other benefits of DPs.
If such case is available, DPs must promptly notify the DPC and local PMU.
12. Who shall notify DPs about compensation period, land occupation, site clearance
and relevant information?
PMU and CRC are responsible for providing information about benefits of DPs;
RP; compensation policy; compensation unit price; period of compensation
payment, land occupation, site clearance and construction.
13. If DPs disagree with the paramilitary survey findings or other related issues, who
shall receive their claims?
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 85
Claims should be submitted to CPC and provincial power company.
In case DPs disagree with solution of DPCs, they can put forward the claim
to DPC to be solved within 15 working days.
In case DPs disagree with opinions of DPC, their claim may be submitted
to competent court.
DPs are not required to pay any administrative expenses.
14. Who shall supervise compensation work?
Internal supervisors and PMU shall conduct internal supervision of RP, and
PMU shall sign contract with the internal supervisors to conduct external
supervision of RP.
15. What are responsibilities of DPs?
To participate into related community meetings and read all related
information
Prepare related documents such as Certificate of Land Use Rights and
ownership of other properties.
Read and thoroughly understand all related document forms such as socio-
economic survey, detailed asset statistic survey, compensation &
resettlement commitment, etc, and involve in all of these activities.
Remove and conduct site clearance when receiving all compensation and
other benefits.
16. For questions, DPs can contact any following units to have further information:
Households affected by MV wireline
Provincial power company
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 86
APPENDIX 8: CHECKLIST OF HOUSEHOLDS WITH AFFECTED LAND, TREES AND CROPS
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
I Phu Ly city
1. Thanh Chau
Commune
1 Le Tien Thiep 3 1,060 0 6 0.57 0 0 0 26 0 0 0 0 300.000 20
2 Pham Van Doan 6 2,160 0 14 0.65 0 0 0 44 0 0 0 0 300.000 30
3 Nguyen Van Thu 5 1,800 0 12 0.67 0 0 0 0 0 0 0 300.000
4 Pham Van Nam 4 1,440 0 12 0.83 0 0 0 0 0 0 0 300.000
2. Phu Van commune
Unoccupied land 19 50
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 87
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
3. Chau Son commune
Unoccupied land 19 50
4. Quang Trung ward
Unoccupied land 18 50
II BINH LUC
DISTRICT
1. Dinh Xa commune
5 Nguyen Xuan Truong 7 2,860 0 12 0.42 0 0 0 42 0 0 0 0 200.000 30
6 Trinh Thi Luyen 3 1,230 0 14 1.14 0 0 0 44 0 0 0 0 200.000 30
7 Dinh Quang Lam 4 1,630 0 14 0.86 0 0 0 34 0 0 0 0 200.000 20
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 88
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
8 Bui Thi Mai 5 1,825 0 12 0.66 0 0 0 42 0 0 0 0 200.000 30
9 Ha Thi Thanh 3 1,240 0 12 0.97 0 0 0 52 0 0 0 0 200.000 40
2. Boi Cau
10 Dao Tien Vuong 4 1,200 0 26 2.17 0 0 0 236 0 0 0 0 350.000 210
11 Nguyen Ba Nam 6 2,350 0 36 1.53 0 0 0 266 0 0 0 0 350.000 230
12 Le Tien Thang 5 2,100 0 24 1.14 0 0 0 214 0 0 0 0 350.000 190
3. Don Xa commune
Unoccupied land 85 580
4. Bo De commune
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 89
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
Unoccupied land 81 540
5. An Lao commune
Unoccupied land 78 650
6. Tieu Dong
commune
Unoccupied land 36 300
7. Binh Nghia
commune
Unoccupied land 39 200
8. An Ninh commune
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 90
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
Unoccupied land 187 540
9. Trinh Xa commune
Unoccupied land 96 340
10. My Tho commune
Unoccupied land 34 100
11. La Son commune
13 Le Ngoc Luong 5 1,200 8 0.67 0 0 0 58 0 0 0 0 200.000 50
14 Nguyen Huu Toan 4 600 12 2.00 0 0 0 52 0 0 0 0 200.000 40
15 Nguyen Van Nhi 6 800 9 1.13 0 0 0 69 0 0 0 0 200.000 60
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 91
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
16 Bui Quang Hop 4 450 12 2.67 0 0 0 52 0 0 0 0 200.000 40
Unoccupied land 54 250
III THANH LIEM
DISTRICT
1. Liem Tiet commune
17 Nguyen Ngoc Dung 4 1,605 0 6 0.37 0 0 0 26 0 0 0 0 200.000 20
18 Hoang Dinh Thi 4 1,740 0 8 0.46 0 0 0 38 0 0 0 0 200.000 30
19 Nguyen Van Dong 5 2,005 0 6 0.30 0 0 0 26 0 0 0 0 200.000 20
20 Le Thi Hang 3 1,550 0 12 0.77 0 0 0 42 0 0 0 0 200.000 30
21 Nguyen Van Tu 6 1,605 0 12 0.75 0 0 0 42 0 0 0 0 200.000 30
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 92
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
22 Nguyen Van Phung 3 1,740 0 12 0.69 0 0 0 32 0 0 0 0 200.000 20
23 Nguyen Huu Thien 5 2,005 0 12 0.60 0 0 0 42 0 0 0 0 200.000 30
24 Nguyen Van Huy 4 1,550 0 14 0.90 0 0 0 34 0 0 0 0 200.000 20
2. Thanh Luu
commune
25 Nguyen Huu Chinh 4 1,605 0 10 0.62 0 0 0 30 0 0 0 0 200.000 20
26 Nguyen Xuan Luong 4 1,740 0 12 0.69 0 0 0 42 0 0 0 0 200.000 30
27 Pham Thi Duyen 5 2,005 0 12 0.60 0 0 0 62 0 0 0 0 200.000 50
28 Pham Quoc Tuan 3 1,550 0 12 0.77 0 0 0 62 0 0 0 0 200.000 50
3. Liem Tuc commune
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 93
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
Unoccupied land 75 540
4. Thanh Hai
commune
29 Do Van Doan 4 300 8 2.67 0 0 0 138 0 0 0 0 200.000 130
30 Vu Van Kien 4 650 10 1.54 0 0 0 50 0 0 0 0 200.000 40
31 Doan Van Tuyen 3 450 12 2.67 0 0 0 62 0 0 0 0 200.000 50
32 Nguyen Van Phuc 4 350 12 3.43 0 0 0 132 0 0 0 0 200.000 120
33 Vu Van Thang 5 400 8 2.00 0 0 0 128 0 0 0 0 200.000 120
34 Vu Van Phuong 3 320 8 2.50 0 0 0 38 0 0 0 0 200.000 30
35 Duong Thi Xuan 4 320 8 2.50 0 0 0 48 0 0 0 0 200.000 40
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 94
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
36 Pham Van Tho 4 400 12 3.00 0 0 0 102 0 0 0 0 200.000 90
37 Vu Thi Mien 5 520 18 3.46 0 0 0 128 0 0 0 0 200.000 110
5. Thanh Tan
commune
Unoccupied land 84 730
6. Thanh Nghi
commune
38 Luong Van Hung 4 653 13 1.99 0 0 0 12 0 0 0 0 200.000 60
39 Ngo Le Ngai 5 1,124 8 0.71 0 0 0 32 0 0 0 0 200.000 120
40 Hoang Thi Ngan 4 856 12 1.40 0 0 0 14 0 0 0 0 200.000 80
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 95
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
41 Vu Van Vinh 4 745 12 1.61 0 0 0 14 0 0 0 0 200.000 80
42 Vu Van Loi 6 1,346 12 0.89 0 0 0 23 0 0 0 0 200.000 120
43 Nguyen Van Hung 3 256 8 3.13 0 0 0 2 0 0 0 0 200.000 10
44 Ngo Van Quyen 4 996 12 1.20 0 0 0 25 0 0 0 0 200.000 90
45 Tran Van Trien 4 823 8 0.97 0 0 0 8 0 0 0 0 200.000 80
46 Nguyen Van May 4 645 12 1.86 0 0 0 43 0 0 0 0 200.000 200
47 Nguyen Van An 5 1,124 12 1.07 0 0 0 46 0 0 0 0 200.000 230
48 Nguyen Van Tai 3 256 12 4.69 0 0 0 37 0 0 0 0 200.000 150
49 Pham Van Quynh 6 1,365 12 0.88 0 0 0 3 0 0 0 0 200.000 20
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 96
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
50 Le Thi May 3 400 12 3.00 0 0 0 36 0 0 0 0 200.000 270
7. Thanh Binh
commune
51 Le Hong Thanh 4 600 5 0.83 0 0 0 35 0 0 0 0 200.000 30
52 Le Van Sang 5 650 3 0.46 0 0 0 33 0 0 0 0 200.000 30
53 Nhu Thi Duan 4 600 3 0.50 0 0 0 53 0 0 0 0 200.000 50
54 Pham Van Huy 5 450 3 0.67 0 0 0 23 0 0 0 0 200.000 20
55 Dinh Huu Huy 5 530 3 0.57 0 0 0 53 0 0 0 0 200.000 50
56 Le Van Thu 4 400 3 0.75 0 0 0 43 0 0 0 0 200.000 40
57 Dinh Van Le 4 450 3 0.67 0 0 0 23 0 0 0 0 200.000 20
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 97
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
58 Dinh Van Dan 3 320 5 1.56 0 0 0 35 0 0 0 0 200.000 30
59 Pham Dinh Chuong 4 400 5 1.25 0 0 0 35 0 0 0 0 200.000 30
60 Bui Cao Ba 4 300 6 2.00 0 0 0 46 0 0 0 0 200.000 40
8. Liem Can commune
Unoccupied land 77 480
9. Liem Phong
commune
61 Le Van Ba 3 435 15 3.45 0 0 0 115 0 0 0 0 200.000 100
62 Le Van Chan 3 587 18 3.07 0 0 0 108 0 0 0 0 200.000 90
63 Nguyen Manh Nga 3 900 3 0.33 0 0 0 103 0 0 0 0 200.000 100
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 98
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
10. Kien Khe town
64 Vu Van Loi 4 2,500 20 0.80 0 0 0 120 0 0 0 0 200.000 100
65 Dinh Thi Thanh 4 2,600 25 0.96 0 0 0 145 0 0 0 0 200.000 120
66 Duong Viet Dung 4 2,700 30 1.11 0 0 0 150 0 0 0 0 200.000 120
67 Le Hoai Nam 4 2,600 15 0.58 0 0 0 145 0 0 0 0 200.000 130
68 Doan Luc 4 2,700 15 0.56 0 0 0 105 0 0 0 0 200.000 90
Unoccupied land 73 180
IV KIM BANG
DISTRICT
1. Dai Cuong
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 99
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
commune
69 Nguyen Nam Kao 6 2,400 0 12 0.50 0 0 0 72 0 0 0 0 120.000 60
70 Pham Thi Ngoan 3 1,420 0 12 0.85 0 0 0 92 0 0 0 0 120.000 80
71 La Quoc Tam 5 1,815 0 16 0.88 0 0 0 66 0 0 0 0 120.000 50
72 Lai The Vung 4 1,350 0 12 0.89 0 0 0 82 0 0 0 0 120.000 70
73 Lai The Tam 5 1,790 0 18 1.01 0 0 0 138 0 0 0 0 120.000 120
74 Lai Van Lang 7 2,780 0 17 0.61 0 0 0 77 0 0 0 0 120.000 60
2. Thuy Loi commune
75 Hoang Van Hue 6 2,440 0 12 0.49 0 0 0 72 0 0 0 0 300.000 60
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 100
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
76 Hoang Dinh Thi 4 1,500 0 18 1.20 0 0 0 98 0 0 0 0 80.000 80
77 Hoang Xuan Thuy 3 1,240 0 24 1.94 0 0 0 84 0 0 0 0 80.000 60
78 Hua Van Khac 2 890 0 12 1.35 0 0 0 42 0 0 0 0 80.000 30
79 Le Van Hung 5 1,500 0 12 0.80 0 0 0 72 0 0 0 0 80.000 60
80 Nguyen Van Long 3 1,380 0 17 1.23 0 0 0 67 0 0 0 0 80.000 50
3. Kha Phong
commune
81 Tran Xuan Chau 7 2,560 0 24 0.94 0 0 0 54 0 0 0 0 120.000 30
82 Nguyen Xuan Huynh 5 1,920 0 18 0.94 0 0 0 78 0 0 0 0 120.000 60
83 Nguyen Duc Thanh 4 1,450 0 22 1.52 0 0 0 72 0 0 0 0 120.000 50
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 101
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
84 Nguyen Dinh Tu 4 1,630 0 18 1.10 0 0 0 103 0 0 0 0 120.000 85
85 Duong Quan Thuan 3 1,140 0 30 2.63 0 0 0 55 0 0 0 0 120.000 25
4. Ngoc Son commune
86 La Van Dich 5 2,020 0 24 1.19 0 0 0 69 0 0 0 0 120.000 45
87 Hoang Van Doan 5 2,315 0 12 0.52 0 0 0 67 0 0 0 0 120.000 55
88 Hoang Van Hung 3 1,080 0 18 1.67 0 0 0 138 0 0 0 0 120.000 120
89 Nguyen Thi Nga 4 1,530 0 12 0.78 0 0 0 77 0 0 0 0 120.000 65
90 Nguyen Van Thuong 5 1,800 0 22 1.22 0 0 0 142 0 0 0 0 120.000 120
91 Tran Van Lan 5 2,070 0 14 0.68 0 0 0 149 0 0 0 0 120.000 135
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 102
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
5. Van Xa commune
92 Nguyen Ngoc Truong 3 1,360 0 24 1.76 0 0 0 244 0 0 0 0 120.000 220
93 Hua Van Tuan 4 1,630 0 28 1.72 0 0 0 153 0 0 0 0 120.000 125
94 Nguyen Ngoc Dung 6 2,170 0 18 0.83 0 0 0 193 0 0 0 0 120.000 175
95 Le Thi Ha 3 1,340 0 24 1.79 0 0 0 224 0 0 0 0 120.000 200
96 La Van Que 5 2,070 0 28 1.35 0 0 0 253 0 0 0 0 120.000 225
97 Nguyen Van Ty 4 1,815 0 21 1.16 0 0 0 336 0 0 0 0 120.000 315
6. Que town
98 Dinh Quang Huy 4 1,400 0 12 0.86 0 0 0 72 0 0 0 0 180.000 60
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 103
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
99 Le Van Hay 6 2,700 0 12 0.44 0 0 0 102 0 0 0 0 10.000 90
100 Hoang Tho 3 1,320 0 12 0.91 0 0 0 52 0 0 0 0 60.000 40
101 Nguyen Xuan Duc 5 1,900 0 18 0.95 0 0 0 98 0 0 0 0 250.000 80
102 Trinh Ngoc Thai 4 1,400 0 12 0.86 0 0 0 92 0 0 0 0 60.000 80
103 Nguyen Thi Hang 4 1,500 0 12 0.80 0 0 0 102 0 0 0 0 60.000 90
104 Uong Thi Tra My 3 1,050 0 16 1.52 0 0 0 106 0 0 0 0 110.000 90
7. Tan Son commune
105 Vu Thi Cong 4 645 24 3.72 0 0 0 144 0 0 0 0 120.000 120
106 Dinh Thi Thuong 4 725 22 3.03 0 0 0 142 0 0 0 0 120.000 120
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 104
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
107 Dinh Van Duong 4 489 18 3.68 0 0 0 198 0 0 0 0 120.000 180
108 Ha Van Ban 3 536 24 4.48 0 0 0 114 0 0 0 0 120.000 90
109 Ha Van Man 4 247 12 4.86 0 0 0 132 0 0 0 0 120.000 120
110 Nguyen Thi Nam 3 612 24 3.92 0 0 0 104 0 0 0 0 120.000 80
111 Phan Thi Phuong 4 576 22 3.82 0 0 0 182 0 0 0 0 120.000 160
112 Duong Minh Nguyet 4 496 24 4.84 0 0 0 114 0 0 0 0 120.000 90
113 Nguyen Van Luong 3 415 21 5.06 0 0 0 121 0 0 0 0 100
V LY NHAN DISTRICT
1. Nhan Binh
commune
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 105
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
114 Cao Van Chung 3 1,200 20 1.67 0 0 0 70 0 0 0 0 120.000 50
Unoccupied land 10 100
2. Bac Ly commune
Unoccupied land 29 50
3. Hop Ly commune
115 Nguyen Viet Hien 4 1,200 12 1.00 0 0 0 92 0 0 0 0 120.000 80
116 Nguyen Viet Thuan 3 1,000 8 0.80 0 0 0 68 0 0 0 0 120.000 60
117 Do Van Suu 4 900 14 1.56 0 0 0 154 0 0 0 0 120.000 140
118 Nguyen Van Thin 5 1,200 12 1.00 0 0 0 112 0 0 0 0 120.000 100
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 106
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
119 Do Van Luc 4 1,200 6 0.50 0 0 0 106 0 0 0 0 120.000 100
120 Nguyen Van Bang 4 800 8 1.00 0 0 0 58 0 0 0 0 120.000 50
121 Nguyen Van Duan 4 350 6 1.71 0 0 0 26 0 0 0 0 120.000 20
122 Do Van Ung 4 650 8 1.23 0 0 0 138 0 0 0 0 120.000 130
4. Vinh Tru town
Unoccupied land 35 150
VI DUY TIEN
DISTRICT
1. Chau Son commune
Unoccupied land 51 390
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 107
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
2. Tan Hiep commune
Unoccupied land 66 680
3. Moc Nam commune
123 Chu Dinh Tu 4 1,200 18 1.50 0 0 0 78 0 0 0 0 220.000 60
Unoccupied land 98 380
5. Dong Van town
124 Nguyen Van Man 4 360 0 10 2.78 0 0 0 90 0 0 0 0 80.000 80
125 Vu Van Van 4 144 7 4.86 0 0 0 17 0 0 0 0 120.000 10
126 Bui Van Loc 4 496 10 2.02 0 0 0 50 0 0 0 0 120.000 40
Subproject : Rural Energy - Additional Financing - Phase 4 - Ha Nam Province Report : Resettlement Plan (RP)
THANG LONG POWER DEVELOPMENT JOINT STOCK COMPANY 108
No.
Name of District/
Commune and
affected household
owner
Num
ber
of
famil
y
mem
ber
(pers
on)
Total
land
area
of
house
hold
(m2)
Permanent impact Impact on assets Impacts on trees
(crops)
Impa
ct on
other
asset
s
Other impact
Temporary
impact (land)
(m2) Affec
ted
resid
ential
land
Affec
ted
prod
uctio
n
land
Public
land Rate
of
land
acqui
sition
(%)
Quant
ity
and
catego
ry of
affect
ed
assets
Perma
nently
affecte
d
buildi
ngs
Temp
oraril
y
affect
ed
buildi
ngs
Tre
es
(Tre
es)
Rice
(crop)
(m2)
Othe
rs
(spec
ify)
Exa
mple
:
Tom
b,
grav
e,
wells
(quan
tity
&
type)
Ren
tal
land
Bus
ines
s
Impact
on
income
(VND/y
ear)
(m2) (m2) (m2)
Produ
ction
land
Public
land
Unoccupied land 114 1310
Total: 527 1,747 1,458 295 10,208 10.140 8.640