MAG-ASAWANG TUBIG MULTI-PURPOSE PROJECT
Presented by:HON. RODOLFO G. VALENCIA
Representative, First District, Oriental Mindoro
Research and Study by:K4 Oriental Mindoro Council, Inc.
NICO P. VALENCIAPresident
o Flood Control o Hydro-Energy Power o Irrigationo Water Resource
![Page 2: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/2.jpg)
54321
![Page 3: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/3.jpg)
OUR MOTHER EARTH
IS IN ASTATE OF
CRISIS
![Page 4: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/4.jpg)
. . . AND WE ARE THE CAUSE
![Page 5: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/5.jpg)
. . .WE POLLUTE THE AIR
![Page 6: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/6.jpg)
. . .WE FILL THE LAND WITH WASTE
![Page 7: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/7.jpg)
WE CUT THE TREES ….WE DID NOT PROTECT AND PRESERVE OUR ENVIRONMENT
![Page 8: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/8.jpg)
AND WHAT ARE THE CONSEQUENCES?
OUR CITIES ARE FLOODING
![Page 9: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/9.jpg)
OUR LAKES ARE DRYING UP
![Page 10: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/10.jpg)
MANY SPECIES ARE FACING THE THREAT OF EXTINCTION
![Page 11: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/11.jpg)
TYPHOONS AND OTHER CALAMITIES ARE INTENSIFYING
TIDAL WAVE IN INDONESIA EARTHQUAKE IN HAITI
![Page 12: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/12.jpg)
TSUNAMI IN JAPAN
![Page 13: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/13.jpg)
IN THE PHILIPPINES. . . WE FACE THE SAME ENVIRONMENTAL PROBLEMS CAUSED BY NATURAL DISASTERS. . .
. . . TYPHOONS
![Page 14: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/14.jpg)
Typhoon “Milenyo” was the strongest typhoon that hit Metro Manila and Bicol in September 29, 2006.
![Page 15: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/15.jpg)
Typhoon “Reming” devastated Albay in November 2006.
![Page 16: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/16.jpg)
Typhoon “Ondoy” was a Disaster to Metro Manila. September 26, 2009
![Page 17: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/17.jpg)
Typhoon “Peping” was the caused of landslide in Baguio. Floods in Northern Luzon. September 30, 2009
![Page 18: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/18.jpg)
Typhoon “Pedring” submerged Roxas Boulevard.September 27, 2011.
![Page 19: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/19.jpg)
Typhoon “Sendong” was a Disaster to Cagayan de Oro.December 19, 2011
![Page 20: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/20.jpg)
Typhoon “Sendong” was earlier forecasted to hit Oriental Mindoro. By God’s grace, Mindoro was sparedDamage Caused:
Massive tragedy to Cagayan de Oro, Iligan CityDeath Toll reached 2000.
![Page 21: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/21.jpg)
. . . FLOODS
ORIENTAL MINDOROIS NOT EXEMPTED TO
NATURAL DISASTERS. . .
TYPHOONS. . .
![Page 22: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/22.jpg)
19931994DISASTER
![Page 23: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/23.jpg)
Oriental Mindoro among 10 most flood-prone areas in RP, says DENRJanuary 26, 2010
Top ten flood prone Provinces:
1. Pampanga2. Nueva Ecija3. Pangasinan4. Tarlac5. Maguindanao6. Bulacan7. Metro Manila8. North Cotabato 9. Oriental Mindoro10. Ilocos Norte
![Page 24: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/24.jpg)
Three Floods Hit Oriental Mindoro in December, 2005December 7, 17, and 27
![Page 25: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/25.jpg)
Floods leave trail of devastation in NaujanJanuary 19, 2010
14,000 affected by floods in NaujanDecember 13, 2010MINDORO POSTS
![Page 26: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/26.jpg)
Intermittent rains triggered flooding in Oriental Mindoro and several areas in Visayas, forcing at least 395 individuals to flee their homes on Tuesday, the National Disaster Risk Reduction and Management Council (NDRRMC) said Wednesday. Southern Luzon and portions of the Visayas experienced rains over the past two days due to the presence of an active low pressure area (LPA) near Palawan, and another one east of southern Mindanao – ABS-CBN
Deluge: The Sinking Philippines – Floods Submerge Oriental Mindoro and Parts of Visayas
![Page 27: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/27.jpg)
100 Katutubong Mangyan, nagsilikas dahil sa banta ng baha.GMA News
![Page 28: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/28.jpg)
Low-lying Calapan City, two other towns in Or. Mindoro to sink in flood 10-yr. time
CALAPAN CITY – In about ten years time, this capital city of Oriental Mindoro and two of its neighboring low-lying towns will submerge in three to seven-meter deep water should a rainfall in a magnitude of what Typhoon “Ondoy” brought to Metro Manila occurs, unless “engineering interventions” be done by the government.This alarming scenario was brought to open by Oriental Mindoro First District Congressman Rodolfo G. Valencia in a press conference here last March 26 as he detailed the recent findings of Norwegian Agency for Development Cooperation (NORAD) regarding the present topographic situation of the province.
![Page 29: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/29.jpg)
OVERFLOWING OF MAG-ASAWANG TUBIG RIVER CAUSED MOST OF THE FLOODING IN THE AREAS OF CALAPAN CITY, NAUJAN, VICTORIA , AND PARTIALLY BACO.
![Page 30: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/30.jpg)
SERIES OF STUDIES, CONSULTATION AND COORDINATIVE MEETINGS WERE
UNDERTAKEN IN THE PAST 30 YEARS - NO POSITIVE RESULT
GABION DIKES ARE TEMPORARY SOLUTIONS.
NOT EFFECTIVE IN MOST AREAS.
![Page 31: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/31.jpg)
RECHANNELING SOLUTIONS: BUCAYAO RIVER RECHANNELING, A PROJECT OF CONG. RGV THRU DPWH (P20 MILLION) COMPLETED 2006.
RESULT: A PARTIAL SOLUTION TO THE FLOODING OF CALAPAN CITY.
![Page 32: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/32.jpg)
DREDGING AND REHABILITATIONOriental Mindoro starts anti-flood plan The Philippine Star, March 30, 2008
CALAPAN CITY – Rep. Rodolfo Valencia of Oriental Mindoro’s 1st District was able to secure latest model of dredging equipment from Finland worth P70 Million. DPWH Sec. H. Ebdane approved the award to First District of Oriental Mindoro.
RESULT: A PARTIAL SOLUTION. CLEARING OF CALAPAN RIVER AND OTHER WATERWAYS IN THE FIRST DISTRICT.
![Page 33: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/33.jpg)
WHY DO WE HAVE
FLOODS IN THE FIRST DISTRICT OF ORIENTAL MINDORO?
![Page 34: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/34.jpg)
THIS IS THE ISLAND OF MINDORO . . .
TOPOGRAPHY
![Page 35: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/35.jpg)
THE FLOW OF WATERS DIVIDES THE ISLAND OF MINDORO . . .
A RAINFALL IN OCCIDENTAL MINDORO DRAINS TO THE LEFT. A RAINFALL IN ORIENTAL MINDORO DRAINS TO THE RIGHT.
![Page 36: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/36.jpg)
BODIES OF WATER IS FORMED IN THE UPLAND OVER TIME
Satellite Image from
October, 1999
Aerial Photography
from 2009, same area
![Page 37: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/37.jpg)
ANOTHER UPLAND AREA
Satellite Image from
October, 1999
Aerial Photography
from 2009, same area
![Page 38: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/38.jpg)
THESE WATERS FLOW TO THE LOWLAND BY FALLS, RIVERS
![Page 39: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/39.jpg)
MOST RIVERS ARE IN THE WATERSHED AREAS OF THE ISLAND
And most Watersheds
are in the North East
Mindoro Area
It comprises 17.62% of
the area of the whole
island of Mindoro.
1508 km2
(14.26 %)
8709 km2
(82.37 %)
355 km2
(3.36%)
![Page 40: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/40.jpg)
THERE ARE FEW BIG RIVERS IN THE WATERSHED AREAS
Blue lines show the
major water flows in the
Mindoro Watersheds.
Waters from the upland
area flow through the
major rivers: Mag-asawng
Tubig River and Bucayao
River.
MAG-ASAWANG TUBIG RIVER
BUCAYAO RIVER
![Page 41: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/41.jpg)
RIVERS CHANGE FLOW OVER TIME . . .
1. River migrate, meander and
shortcut bends.
2. Earthquakes, rainfalls, and
typhoons can cause rivers to suddenly
change course.
3. Landslides and soil erosion can cause
sudden build-up of sediment and
debris, and block existing water
channels.
![Page 42: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/42.jpg)
CHANGES IN RIVER FLOW IS THE CAUSE OF FLOODING
The route shows the
river flow 10 years ago.
The route shows the river
flow at present.
The encircled route changes the volume of
waters flowing in it.
10 YEARS AGOPRESENT ROUTE
![Page 43: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/43.jpg)
“ONE LARGE DELTA”, CATCH BASIN OF FLOOD
Water overflow in Mag-asawangTubig
and Bucayao River
is the cause of flood in the Delta Area.
Baco
Calapan
Naujan
Part of Baco, Calapan,Naujan comprises One
Large Delta in North East
Mindoro.
![Page 44: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/44.jpg)
FLOOD PROGRESS IN THE DELTA AREA
CALAPAN CITY, NAUJAN,
& PART OF BACO
CURRENT TIME
Legend:(Flood Depth in meters)
0.00 - 0.250.26 - 1.001.00 - 5.005.01 - 10.00
AFTER 12 HOURSAFTER 96 HOURSMAXIMUM FLOOD EXTENT
![Page 45: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/45.jpg)
FLOOD SUSCEPTABILITY MAP (BACO, CALAPAN, NAUJAN,
VICTORIA)
![Page 46: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/46.jpg)
WE HAVE A BEAUTIFUL AND PRODUCTIVE PROVINCE. . .
![Page 47: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/47.jpg)
BUT BECAUSE OF FLOODS CAUSED BY MAG-ASAWANG TUBIG RIVER, SOME OF OUR RICEFIELDS HAVE TRANSFORMED INTO THIS . . .
![Page 48: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/48.jpg)
LOST OF LIVES, PROPERTIES AND LIVELIHOOD . . .
![Page 49: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/49.jpg)
WE MUST ACT NOW . . . BEFORE IT’S TOO LATE. . .
. . .
![Page 50: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/50.jpg)
BUT THE BIG QUESTION IS . . .
HOW DO WE DO IT?
. . . NATIONAL AND PROVINCIAL LEADERS AND ALL MINDOREÑOS
MUST WORK HAND IN HAND TO SOLVE THIS PROBLEM . . .
![Page 51: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/51.jpg)
LET US ALL DO IT . . .
THE TIME IS NOW!
![Page 52: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/52.jpg)
LET US ALL DO IT . . .
THE TIME IS NOW!
![Page 53: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/53.jpg)
The PROPOSED SOLUTION:MAG-ASAWANG TUBIG MULTI-PURPOSE PROJECT
Initiated by:HON. RODOLFO G. VALENCIA
Representative, First District, Oriental Mindoro
Research and Study by:K4 Oriental Mindoro Council, Inc.
NICO P. VALENCIAPresident
o Flood Control o Hydro-Energy Power o Irrigationo Water Resource
![Page 54: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/54.jpg)
HOUSE BILL 4899AN ACT PROVIDING THE CONSTRUCTION OF
MAG-ASAWANG TUBIG MULTI-PURPOSE PROJECT
Hon. RGV filed the Bill on 05 July 2011
It will serve as flood control, irrigation system, power and energy, among others.
approximate length of 49 kilometers from Mt. Halcon down to the Calapan Bay and Tablas Strait
The Bill is now pending with the Committee on Public Works and Highways since August 2011.
![Page 55: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/55.jpg)
SCANNED FILE
![Page 56: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/56.jpg)
RELATED INITIATIVES UNDERTAKEN THRU THE OFFICE OF CONG. VALENCIA AND K4
An Orthophoto Map (Satellite Digital) of the
Mag-asawang Tubig, costing about PhP 25
Million, has been obtained.
Its contour mapping will be the basis of
appropriate engineering design and the proper
costing.
![Page 57: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/57.jpg)
Hon. RGV sought the support of local Chief Executives.
On 30 April 2012, the Sangguniang Panlalawigan, the Municipal Mayors and the Sangguniang Bayan of the seven (7) municipalities in the first district have endorsed the approval of the Mag-asawang Tubig Multi-purpose Bill.
The City Government of Calapan has not responded despite the fact that Calapan City is the first hard-hit by flashfloods and the biggest beneficiary of the project.
![Page 58: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/58.jpg)
Memorandum of Understanding (MOU) entered into with DCCD Engineering Corporation, a prominent and credible engineering firm, to undertake preliminary review of the project.
![Page 59: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/59.jpg)
A Memorandum of Agreement (MOA) was executed among RGV, Gov. A. V. Umali, K4 President Nico P. Valencia and Mr. Armando de Rossi of CMC-Asia, Inc. The primary objective to obtain from the European Community at least US$200,000.00 to partly finance the cost of the technical study.
![Page 60: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/60.jpg)
A consultative meeting organized by Hon RGV and the K4 was held last May 17, 2012 at RGV Executive Lounge, Makati City.
Attendees were Gov. Umali, District and Regional Office of the DPWH, Office of Foreign Assisted Projects, DPWH, among others.
HON. RGV TALKING BEFORE THE PARTICIPATNS
![Page 61: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/61.jpg)
GOV. UMALI TALKING BEFORE THE PARTICIPATNSDir. HULLIO B. BELLEZA, center,
Dir. ROGELIO ANG, 2nd from left, OF DPWH
Dr. ARMANDO DE ROSSI, Chairman, CMC-Asia Donor/Solicitor of initial US$200,000.00 for Technical Study
NICO VALENCIA, K4 President, with CONG. RGV and GOV. UMALI
![Page 62: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/62.jpg)
CONSULTATIVE MEETINGPARTICIPANTSMAG-ASAWANG TUBIG MULTI-PURPOSE PROPECT
![Page 63: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/63.jpg)
CONSULTATIVE MEETINGMAG-ASAWANG TUBIG MULTI-PURPOSE PROJECT
Initiated by:
HON. RODOLFO G. VALENCIARepresentative,
First District, Oriental Mindoro
Research and Study by:K4 Oriental Mindoro Council, Inc.
NICO P. VALENCIAPresident
May 17, 2012RGV Executive Lounge, 8th Floor, RGV Bldg, Makati City
![Page 64: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/64.jpg)
THE PAMPANGA MEGADIKE,
A MULTI-BILLION PROJECT
OF THE GOVERNMENT NOW PROTECTING
THE PEOPLE OF PAMPANGA AND OTHER PARTS OF
NORTHERN LUZON.
REFERENCE PROJECT No. 1:
![Page 65: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/65.jpg)
REFERENCE PROJECT No. 2:
THE JALAUR RIVER MULTI-PURPOSE PROJECT II, Barangay Agcala, Calinog, Ilo-ilo.
Components: DAMS, HIGHLINE CANALS, IRRIGATIONBudget P11.2 BillionFund Sources 60% of Funds from Korean export-import bank
40% Counterpart from Philippine GovernmentLaunching May 30, 2012Target Completion 2016
![Page 66: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/66.jpg)
OPERATIONAL PLAN
I. OBJECTIVE The principal objective is to solicit the support of
H.E. President Benigno S. Aquino III and to certify House Bill No. 4899 as a priority,
Ensure its approval by both the House of Representative and the Philippine Senate.
II. DURATION
This Oplan shall officially commence in May 2012 until the closing of the 15th Congress on 30 June 2013.
![Page 67: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/67.jpg)
III. KEY AREAS OF CONCERN
o PLANNING & STUDIESo FINANCE SOURCING FOR PROJECT STUDYo ENGINEERING AND COST ESTIMATESo FORMAL PROJECT STUDYo LEGISLATIVE-EXECUTIVE ACTION
![Page 68: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/68.jpg)
IV. PROJECT ADVANTAGES & BENEFITS
1. Flood Control
2. Hydro Electric Power, 10-MW capacity
3. Irrigation System
4. Water Supply Resource
5. Restoration of vast agricultural lands
6. Development of Eco-Tourism
7. Enhancement of Agricultural Productivity
8. Reforestation and Ecological Balance
![Page 69: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/69.jpg)
V. IMPLEMENTATION STRATEGY
1. Pursue sourcing of US $ 200,000.00 study grant from the European Community.
2. Completion of Preliminary Project Evaluation.
3. Undertake Preliminary Engineering Designs and Cost Estimates, in coordination with DPWH.
4. Coordinate with the Committtee Secretary to calendar H.B. 4899 for consideration/deliberation by the Committee on Public Works and Highways.
5. Obtain support of Committee Members for the approval of the Bill and endorsement to the Committee on Appropriations.
6. Obtain support of Members of the Committee on Appropriations.
7. Follow-up Committee Report of the Committee on Public Works and Highways endorsing the approval of H.B. 4899.
8. Audience with H.E. President Benigno S. Aquino II.
![Page 70: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/70.jpg)
OTHER PROJECTS from the
PROPOSED MAG-ASAWANG MULTI-PURPOSE PROJECT
![Page 71: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/71.jpg)
PROJECT No. 1: HYDROPOWER PROJECT
![Page 72: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/72.jpg)
PROJECT No. 2: IRRIGATION PROJECT
![Page 73: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/73.jpg)
PROJECT No. 3: REFORESTATION
Trees Alongside the Megadike
![Page 74: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/74.jpg)
PROJECT No. 4: TOURISM PROJECT
Infinity Pool
![Page 75: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/75.jpg)
PROJECT No. 5: TRANSFORMATION OF IDLE LANDS TO AGRICULTURAL LAND
![Page 76: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/76.jpg)
PROJECT No. 6: POTABLE WATER RESOURCE
![Page 77: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/77.jpg)
Research and Study by:K4 Oriental Mindoro Council, Inc.
NICO P. VALENCIAPresident
LET’S ALL DO IT . . .
. . .NOW!
![Page 78: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/78.jpg)
Initiated by:HON. RODOLFO G. VALENCIA
Representative, First District, Oriental Mindoro
![Page 79: Mag asawng tubig multi-purpose project](https://reader035.vdocuments.us/reader035/viewer/2022062307/555b8e8fd8b42acd238b4fad/html5/thumbnails/79.jpg)
Compiled and Arranged by:
Oriental Mindoro Council, Inc.
NICO P. VALENCIAPresident