P.H. Welshimer Memorial Library Milligan College, Tennessee
Library Space Re-Design
BCLA Professional Development Day, May 17-18, 2012 University of Charleston, West Virginia
![Page 2: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/2.jpg)
Does the College need to build additional library space? The College can probably avoid building additional library space if it can reduce the footprint in the building of both the print collections and the library staff.
What might the College do in the near- and mid-term to reshape experimentally the way the Welshimer Library is used. The report describes a number of relatively low-cost experiments in the use of library space. These experiments could guide a transformation of library programs over the next few years, [and] make the library a much more frequent and successful choice for study among students.
Scott Bennett, The Future of the P.H. Welshimer Library, March 2006
![Page 3: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/3.jpg)
Library behind the glass (ca. 2006) “Look but don’t touch. Please don’t feed the librarians!”
![Page 4: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/4.jpg)
“The Squeeze” (ca. 2006) Because it’s all about security.
![Page 5: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/5.jpg)
Reclaiming dead space (ca. Summer 2007) Circulation desk moves out into the entrance lobby.
![Page 6: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/6.jpg)
Initial efforts to open sight lines (ca. Summer 2006) Reference area on Main Floor.
![Page 7: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/7.jpg)
Initial efforts to open sight lines (ca. Summer 2006) Reference area on Main Floor.
![Page 8: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/8.jpg)
Architectural Plans (March 2008) Open sightlines and more user spaces. But focus is still collection “heavy”.
![Page 9: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/9.jpg)
Main Floor (front) after remodel (Summer 2010)
![Page 10: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/10.jpg)
Library Work Area and Offices on (back) Main Floor (Summer 2010) Hey, what are you doing with all our stuff!
![Page 11: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/11.jpg)
Main Floor (back) today 1,600 sq. ft. of prime real estate for users (work area moved to Basement).
![Page 12: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/12.jpg)
Dismantling the Basement Floor “Labyrinth” (Summer 2011)
![Page 13: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/13.jpg)
Same view of the Basement Floor today
![Page 14: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/14.jpg)
Another view of the Basement Floor today We can actually breathe down here now!
![Page 15: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/15.jpg)
On to the Second Floor stacks (front) (Summer 2011) Tight aisles and packed shelves in desperate need of weeding.
![Page 16: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/16.jpg)
On to the Second Floor stacks (front) (Summer 2011) Tight aisles and packed shelves in desperate need of weeding.
![Page 17: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/17.jpg)
Second Floor stacks (front) today New user seating areas!
![Page 18: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/18.jpg)
Second Floor stacks (front) today New user seating areas and wider aisles!
![Page 19: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/19.jpg)
Second Floor stacks (back) (Summer 2011)
![Page 20: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/20.jpg)
Second Floor stacks (back) (Spring-Summer 2012) We now have space for some additional seating!
![Page 21: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/21.jpg)
8,8
66
12
,35
5
19
,22
3
24
,98
3
34
,41
7
7,9
40
12
,77
5
18
,52
3 2
4,4
78
29
,30
6
0
5000
10000
15000
20000
25000
30000
35000
40000
2007/2008 2008/2009 2009/2010 2010/2011 2011/2012
He
adco
un
t To
tal
Headcount (hour-visits) by Semester
Fall
Spring
The proof is in the usage numbers!
![Page 22: Library Space Re-Designlibrary.milligan.edu/wp-content/...space-redesign.pdf · space by relocated library work areas to facilitate a significant increase in user space on the Main](https://reader033.vdocuments.us/reader033/viewer/2022060502/5f1c38d0a88197632a6d05ef/html5/thumbnails/22.jpg)
• Opening the view, and breathing life into dead spaces: Reconfiguration of Main Floor Lobby, Circulation Desk and Reference areas beginning in 2006 to reverse the perception that the library was an unattractive and unwelcoming place, oppressively dominated (ironically) by books and shelving. The impact of just opening the space was dramatic. We also radically relaxed noise and food restrictions. (Low cost: Countertop and labor.)
• Shifting the focus from “library-centric” to “user-centric”: Re-prioritizing
space by relocated library work areas to facilitate a significant increase in user space on the Main Floor. (This was accompanied, much to our delighted surprise by a re-decoration of the Main Floor—paint, carpet, and some casual furniture—in the summer 2010, funded by the President’s Office. Project cost $45,000.)
• Users invade the stacks: Significant reduction in the library lending book
collection to create new user spaces on the Second and Basement Floors. (Low cost: Tables and chairs and area rugs, labor.)