• Summary of year’s activities– Forsyth/Wiens Recoveries– Cascadia Construction and TRM Deployment (testing)– Staffing
• Upcoming plans/schedule– Cascadia deep deployment (2011)– Mariana deployment (2012)– Chile deployment (2012)– Cascadia recoveries/turnaround (2012)
• Development– Completed/ongoing projects– Future projects
Forsyth Recoveries (S of Shatsky)
Site Depth, m Acoustics Release Data
14 6002 Good No release
12 5788 Good 1 wt dropped after ~2h 244/370
9 5933 Good 1 wt dropped after ~2h 150/370
8 6007 Good Normal release 372/372
5 5994 None
2 5752 None
Faulty burnwires: Sites 9, 12, 14?
Sites 2, 5: implosion or early release ?
Wiens Lau Recoveries
• 21 of 22 recovered• 13 had OBMs
• OK performance,• Some bad channels
• Depth restriction 5000 m• No low-pressure leaks
Inventories (instruments and people)
• ~29 standard OBS (5 TCs; 24 L4s)• 30 (20 TRM; 10 standard) in Cascadia fleet (considerable overlap in design)
• People: 3 core, 5 peak– Engineer Gassier– Engineer Koczynski– Technician Oletu– Technicians Stolzmann, Brusa
Cascadia Construction/Deployment
2 test cruises in LI Sound (battery issues; instrument survived 3’ drop)Corrosion test in LI sound
Made decision early 2011 to add popup buoys
Construction:
Possible TRM delays became apparent ~ April/May
Steel supplier/coater overwhelmed (19 tons in 900 pcs)
Estimated 5+ instruments ready for deployment cruise
10 standard Cascadia OBSs on track for October 2011
New standard OBS
TRM OBS
Cascadia Deployment
15 delivered for cruise
TRM Deployment Cruise July, 2011
15 deployed9 with popups
Heave challenges
1 TRM fell
1 tilted
1 recovered
Some had temperaturesensors
Major fishing collaboration
TRM Recovery
2011-12 Activities
• Cascadia Standard deployment, October 2011• Mariana experiment (Wiens) Jan/Feb 2011
– 10 standard OBSs– 5 moored instruments– Temperature sensors ?
• Chile experiment (Trehu) April/May 2011– 10 standard OBSs– Flowmeters
• Cascadia Recoveries/Turnaround [All summer…]
Completed Development
• Switched to Trillium Compact leveling system in Al tube
• TRMs developed and built• OBS dataloggers redesigned: batteries separated• APG dataloggers incorporated into OBSs• TRM deployment/recovery approaches
2011-12 Development Directions
• New FPGA for APG logger• Atomic clocks• TRM tweaks• Mariana moored instruments• Adding SIO flowmeters to standard OBSs • Incorporate broadband sensor• New OBS datalogger• Deep OBS
Issues
• Confidence has increased (5 years)• But… recognize need to consolidate.
• Last year, working flat-out. May be false economy given per-instrument and data costs.
• Data: Backlog is critical problem. First Forsyth
experiment site to DMC yesterday.