I-5 North Coast Corridor Project Phase 1 (CM/GC)
![Page 2: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/2.jpg)
Flatiron-Skanska-Stacy and Witbeck (FSSW)
FSSW Joint Venture is comprised of nationally recognized contractors:
• Flatiron West, Inc.
• Skanska USA Civil West California District Inc.
• Stacy and Witbeck, Inc.
![Page 3: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/3.jpg)
Flatiron-Skanska-Stacy and Witbeck (FSSW)
• Local Contractors
• Leading CMGC experienced firms
• Significant CALTRANS and SANDAG contracting experience
• Dedicated to supporting small, local and minority business
![Page 4: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/4.jpg)
North Coast Corridor Project Overview
• 14 Miles of HOV between L. Santa Fe and Hwy 78 • New Sound and Retaining Walls • Bridge Reconstruction • Pavement Widening and Reconstruction • 4 Miles of LOSSAN Double Track • Rail Bridge replacement • Lagoon Enhancement
![Page 5: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/5.jpg)
5
NCC PHASE 1
![Page 6: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/6.jpg)
![Page 7: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/7.jpg)
![Page 8: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/8.jpg)
![Page 9: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/9.jpg)
![Page 10: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/10.jpg)
![Page 11: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/11.jpg)
![Page 12: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/12.jpg)
![Page 13: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/13.jpg)
• CM/GC team selected based on qualifications and experience
• CM/GC consults with Owner during the design phase
• CM/GC evaluates costs, schedule and constructability
• Multiple segment GMPs issued for bid
What is CM/GC
![Page 14: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/14.jpg)
Minority Goals
• I-5 Highway and Lagoon Work: DBE Goal for Pre-Construction
Services: 5.1 percent
• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent
• DBE Goals for Construction Services will be determined near
completion of Pre-Construction Services
![Page 15: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/15.jpg)
Potential Opportunities Construction Phase
• Articulated Concrete Block • GRE Wall Materials • Quality Control • Asphalt Paving • Grind Existing Concrete Pavement • Railroad Signals • Biological Monitoring • Ground Anchors and Soil Nails • Railroad Track Materials • Bridge Concrete Barrier • Guardrail • Reinforcing Steel • Bridge Demolition • Habitat Restoration • Revegetation and Planting • Channel Lining • Hydrographic Surveys • Rip Rap • CIDH Pile • Jack and Bore • Roadside Signs • Clear and Grub • Joint Seal • Roadway Concrete Barrier • Cold Plane Asphalt • Landscape and Irrigation • Shotcrete • Concrete Supply • Masonry • Slope Protection • Construction Area Signs • Minor Concrete • Striping • Driven Pile • Miscellaneous Metal • Survey • Electrical • Miscellaneous Iron and Steel • SWPPP • Environmental Compliance Officer • Overhead Signs • Transparent Soundwalls • Erosion Control • Pipe Supply
![Page 16: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/16.jpg)
Assistance to DBE/UDBE/SBE Firms
• FSSW is committed to helping Caltrans and SANDAG meet/exceed its overall U/DBE goals
• Work packages will be broken down into economically feasible portions of work
• FSSW is available to assist subcontractors in obtaining bonding, lines of credit, and insurance as required
• Project website to facilitate communication of project opportunities and events
![Page 17: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/17.jpg)
PROJECT WEBSITE – i5northcoast.com
![Page 18: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/18.jpg)
REGISTER ON THE WEBSITE TO STAY INFORMED
![Page 19: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/19.jpg)
DBE RESOURCES AND WORKSHOPS
![Page 20: I-5 North Coast Corridor Project Phase 1 (CM/GC) Outreach Presentation.pdf• LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services](https://reader034.vdocuments.us/reader034/viewer/2022050311/5f72e067c08a2a75363a115d/html5/thumbnails/20.jpg)
Contact Information