GROUP 7GROUP 7 GROUP MEMBERS:GROUP MEMBERS:RAZIN BARWIN BT ABDUL SAMAD(AA09195)RAZIN BARWIN BT ABDUL SAMAD(AA09195)
NASHITOH BT ABDUL HALIM(AA09184)NASHITOH BT ABDUL HALIM(AA09184)
MOHD IFAR BIN MOHD HASRI(AA09188)MOHD IFAR BIN MOHD HASRI(AA09188)
TYPES OF MATERIALSTYPES OF MATERIALSUSED FOR BUILDING USED FOR BUILDING
CONSTRUCTION...CONSTRUCTION...
INTRODUCTIONINTRODUCTION...
WHAT....WHAT....
Why building collapse...??Why building collapse...?? Bad design.Bad design. Not strict monitoring by engineer.Not strict monitoring by engineer. The contractor pursuit to complete The contractor pursuit to complete
the project quickly.the project quickly.
Effect of unsuitable Effect of unsuitable material used...material used...
Cause building damageCause building damage Government will be lost Government will be lost The economy of country will be The economy of country will be
downdown..
Solutions...Solutions... Tighten law by government.Tighten law by government. Monitor the work progress.Monitor the work progress.
-- To define the problems in the To define the problems in the building construction.building construction.
-- To determine the effects of this To determine the effects of this issue.issue.
-- To determine the solution which are To determine the solution which are to solve the problems are related to to solve the problems are related to building construction.building construction.
Research question...Research question... We have distribute the question We have distribute the question
among civil engineering student.among civil engineering student. We prepared about 30 set of We prepared about 30 set of
question.question. We have 15 male and 15 female We have 15 male and 15 female
student answered the question.student answered the question. We analyse the result using graph We analyse the result using graph
and chart.and chart.
Data Data Analysis... Analysis...
0
2
4
6
8
10
12
14
Design faults Faults on construction
site
Product failure Natural disastersN
o. o
f Res
pond
ent
Cause failure of a building.Cause failure of a building.
- respondent is design faults.respondent is design faults.
- faults on construction.faults on construction.
- product failure.product failure.
- Natural- Natural disastersdisasters
Party That Should Be Responsible In Dealing With Damage Buildings
0
2
4
6
8
10
12
14
16
18
Clients Architects Engineers Tow n PlannersN
O. o
f Res
pond
ent
Parties should be responsible Parties should be responsible in dealing with damage in dealing with damage
building.building.
- town planners.- town planners.
- architects.- architects.
-clients-clients
- engineers.- engineers.
The Efficien Way To Improve The Responsible Perties In A Construction Project
0
2
4
6
8
10
12
No.
of R
espo
nden
t Federal Government should have astable policy on building approvals
Proper Training and monitoring ofpersonnel for the job
Qualif ied professionals should beengaged
More law s tightened
The efficien way to improve the The efficien way to improve the responsible parties in a construction responsible parties in a construction
project.project.
Qualified professionals should be Qualified professionals should be engaged.engaged.
Proper training and monitoring of Proper training and monitoring of personal of the job.personal of the job.
More laws tightened.More laws tightened.
Federal government should have Federal government should have stable policy on building stable policy on building
approvals.approvals.
CONCLUSION...
the type of material used on site, it depend on type of construction.the type of material used on site, it depend on type of construction.
quality, price and relatedquality, price and related
~THE END~~THE END~