Geotechnical Engineering Report
Malek Smadi, Ph.D., P.E.Principal Engineer - GEOTILL - Fishers, Indiana
[email protected] - www.geotill.com
![Page 2: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/2.jpg)
The Geotechnical report provides critical and vital information for … Owners.
Architects.
Engineers.
Contractors.
Being able to understand and analyze the Geotechnical report to avoid costly mistakes is in the best interest of all the project players.
![Page 3: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/3.jpg)
Why the Geotechnical Report is Important …Why the Geotechnical Report is Important …Why the Geotechnical Report is Important …Why the Geotechnical Report is Important …Why the Geotechnical Report is Important …Why the Geotechnical Report is Important …Why the Geotechnical Report is Important …Why the Geotechnical Report is Important …
![Page 4: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/4.jpg)
![Page 5: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/5.jpg)
The foundation of this slender building in Adapazari failed and the building leaned onto its neighbor
![Page 6: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/6.jpg)
Understanding The Implications of the Geotechnical Report will Achieve: On Time.
On Budget.
& Failure Free Project.
![Page 7: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/7.jpg)
Introduction. Project Description. Field Exploration and Testing. Site Conditions. Design Recommendations. General Construction Procedures and
Recommendations. Appendix A: Maps. Appendix B: Logs. Appendix C: Test Results. Appendix D: Engineering Analyses.
Geotechnical Report Contents
![Page 8: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/8.jpg)
Identify the project by location and name.
Briefly outline the scope of the investigation.
Introduction
![Page 9: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/9.jpg)
Location including the beginning and ending station.
Overview of the structures.
Project Description
![Page 10: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/10.jpg)
Methods and equipment used to bore the soils.
Field Exploration and Testing
![Page 11: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/11.jpg)
Soil Boring Logs contain: Soil Densities Stiffness Blow Counts Recovery Water Content Atterberg
Limits Unconf. Comp. Ground Water
Field Exploration and Testing
![Page 12: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/12.jpg)
Field Exploration and Testing
![Page 13: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/13.jpg)
Methods and equipment used to test the soils. Field Exploration and Testing
![Page 14: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/14.jpg)
Regional and Site Geology.
Subsurface Conditions.
Ground Water Conditions.
Landslides and other Concerns such as Sink Hole or Fracturing Problems.
Seismic Classification.
Site Conditions
![Page 15: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/15.jpg)
Subsurface Conditions.
Site Conditions
Sand & GravelSiltstoneSilt/SandstoneSandstoneLoamSandy LoamClay LoamClay Sandy LoamSandy Clay LoamSilty LoamShale
![Page 16: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/16.jpg)
Foundations.
Modification of Existing Subsurface Materials.
Retaining Walls.
Site Grading and Earthwork.
Pavements.
Pavement Subsurface Drainage.
Design Recommendations
![Page 17: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/17.jpg)
Design Recommendations Foundations: Spread Footings Driven Piles Drilled Shafts Micropiles
![Page 18: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/18.jpg)
Design Recommendations Retaining Walls : MSE Walls Modular Block Wall
Conventional Cantilever Walls Soldier Pile and Lagging Walls
![Page 19: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/19.jpg)
Pile Installation.
Site Preparation.
Fill Compaction.
Foundation Excavations.
Erosion Protection.
Construction Dewatering.
General Construction Procedures and Recommendations
![Page 20: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/20.jpg)
How much time do I have ?
How much money do I have ?
What is the likelihood that this site has been previously developed?
Can I save money later by spending it now?
Evaluation Factors
![Page 21: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/21.jpg)
Higher Up-Front cost generally means less likelihood for Claims.
Lower Up-Front cost + shorter schedule generally means higher likelihood for Claims.
Most Cost Efficient
![Page 22: Geotechnical report by Dr. Malek Samdi of GEOTILL](https://reader033.vdocuments.us/reader033/viewer/2022051405/587f65051a28ab9b398b5b31/html5/thumbnails/22.jpg)
QUESTIONS
Malek Smadi, Ph.D., P.E.Principal Engineer - GEOTILL - Fishers, [email protected] - www.geotill.com