Planning Partners:
Alamo
Alton
Donna
Edcouch
Edinburg
Elsa
Granjeno
Hidalgo
Hidalgo County
La Joya
La Villa
McAllen
Mercedes
Mission
Palmhurst
Palmview
Peñitas
Pharr
Progreso
Progreso Lakes
San Juan
Sullivan City
Weslaco
Additional Partners: FHWA
FTA
LRGVDC Transit
TxDOT
Fish & Wildlife
McAllen Transit
Rio Grande Valley Partnership
Weslaco Chamber of Commerce
Economic Development of Reynosa
Economic Development of Rio Bravo
Gobierno de Tamaulipas
San Juan Economic Development
Hidalgo County RMA
July 30, 2008 Raymond Sanchez Jr. District Transportation Planner TxDOT Pharr District offices RE: FY 2008-2011 TIP, Amendment #2 Mr. Sanchez, Enclosed are five (5) copies of the FY 2008-2011 TIP, Amendment #2 for the Hidalgo County MPO, adopted at the TPC on July 17, 2008 as well as the Resolution. The HCMPO swapped the Nolana project, CSJ 1802-02-008, total cost of $9,521,253 for I Road, CSJ 0921-02-132, total cost $5,147,552. One copy (1) is for your office, and we ask that your forward the remaining four (4) copies to TPP for their distribution to FHWA, FTA and PTN. If I can answer any questions for you please do not hesitate to contact me at your convenience. Sincerely, Andrew A. Canon Transportation Director cc: Tammy Stone, Transportation Planner, TPP (S) file
Administrative Agent: Lower Rio Grande Valley Development Council
311 N. 15th ST., McAllen, TX, 78501-4705
Administrative Agent: Lower Rio Grande Valley Development Council 311 N. 15th ST., McAllen, TX, 78501-4705
FY 2008-2011 TRANSPORTATION IMPROVEMENT PROGRAM - Hidalgo County MPOTBD=to be determinedYOE=year of expenditurCSJ= Control-Section-Jo C=Construction
CE=Construction EngineeriE and PE=Preliminary EngiR and ROW=Right-of-Way
EM , HP, Demo=Federal Earmark, High Priority, De
NOV '08 REV
20102010 2010 20102010201020102010201020102010 2010 2010 2010 2010 2010 2010 2010
0921-02-132
01-Sep-09
I Road
Widen to 4 Lanes
1.9
CSJHwy
Descriptio
Let Dat
Yr of Exp Constr Cost
Construction Estimate
abilitation/PrevMaintMetro Corridors
idge Replace/Rehab
SafetyEnhancements
Misc-Demo-HiPriorityDistrict Discretionary
Strategic PriorityLocal Funds
Total Const Fundi
ROW Utilities Cost
Length (M
PHASE
1
MTP Prj HC-126
C XROWPE
$0$0$0
$0$0
$2,000,000$0
$420,000
$4,156,733
$0
12
111098
62
TOTAL PROJECT C $5,147,552
$4,000,000
$4,160,000
$0
Indirect Cost: $206,752
Contingencies Cost: $291,200
CE Cost: $249,600
PE Cost: $240,000
Bid Amt $0
Additional Comments
Hidalgo County EDC reduction=82%; therefore, 80/16.44/3.6. Cityof Edinburg EDC reduction=87%; therefore, 80/17.44/2.6.
Project History
Added by Nov '08 Rev, Replaced 1802-02-008 (Nolana)
Type of Amendme Added Project
Revision D 01-Nov-08
TIP Wrk Classifica Added Capacity Roadway Expansion
Limits - Fr US 281
Limits - To Owassa Rd
Remarks P-1
Remarks P-7
2010
Project Spon TxDOT
Bond Financing $0Other Financing $0
TIP Status: TIP
City Edinburg
County Hidalgo
xDOT District Pharr
e Date for YOE Cost 01-Jan-08
ID# 155
I RoadNam
Total Program C $4,156,733
Sum F $ $2,989,386.40
Sum L $ $535,838.72Sum S $ $631,507.88
% F 71.92%% S 15.19%% L 12.89%
PROGRAM COST BREAKDOWN
12
Metro Mobility7 $1,736,733
Wednesday, October 29, 2008 Page 1 of 1
FY 2008-2011 TRANSPORTATION IMPROVEMENT PROGRAM - Hidalgo County MPOTBD=to be determinedYOE=year of expenditurCSJ= Control-Section-Jo C=Construction
CE=Construction EngineeriE and PE=Preliminary EngiR and ROW=Right-of-Way
EM , HP, Demo=Federal Earmark, High Priority, De
1804-01-057
01-Dec-08
SP 115
WIDEN TO 6 LANE DIVIDED
3
CSJHwy
Descriptio
Let Dat
Yr of Exp Constr Cost
Construction Estimate
abilitation/PrevMaintMetro Corridors
idge Replace/Rehab
SafetyEnhancements
Misc-Demo-HiPriorityDistrict Discretionary
Strategic PriorityLocal Funds
Total Const Fundi
ROW Utilities Cost
Length (M
PHASE
1
MTP Prj HC-51
C XROWPE
$600,000$4,400,000
$0
$0$0
$0$0$0
$14,000,000
$9,000,000
12
111098
62
TOTAL PROJECT C $16,808,925
$13,461,538
$14,000,000
$0
Indirect Cost: $695,800
Contingencies Cost: $980,000
CE Cost: $700,000
PE Cost: $433,125
Bid Amt $0
Additional Comments
Funding is based on the proposed 2008 SMP spreadsheet agreed to at consensus mtg w/TPP March 16, 2007.
Project History
10CBI funds
Type of Amendme Revised for Year of Expenditure & Total Project Costs
Revision D 01-Feb-08
TIP Wrk Classifica Added Capacity Roadway Expansion
Limits - Fr FM 1016
Limits - To SP241 @ SP115 IN HIDALGO
Remarks P-1
Remarks P-7
2009
Project Spon TxDOT
Bond Financing $0Other Financing $0
TIP Status: TIP
City Hidalgo
County Hidalgo
xDOT District Pharr
e Date for YOE Cost 01-Dec-07
ID# 2
S 23rd StNam
Total Program C $14,000,000
Sum F $ $11,200,000.00
Sum L $ $0.00Sum S $ $2,800,000.00
% F 80.00%% S 20.00%% L 0.00%
PROGRAM COST BREAKDOWN
12
Metro Mobility7 $0
0863-01-050
01-Oct-08
FM 493 ext
Construct 4 lane roadway
0.25
CSJHwy
Descriptio
Let Dat
Yr of Exp Constr Cost
Construction Estimate
abilitation/PrevMaintMetro Corridors
idge Replace/Rehab
SafetyEnhancements
Misc-Demo-HiPriorityDistrict Discretionary
Strategic PriorityLocal Funds
Total Const Fundi
ROW Utilities Cost
Length (M
PHASE
1
MTP Prj HC-116
C XROWPE
$0$0$0
$0$0
$2,000,000$0$0
$4,000,000
$2,000,000
12
111098
62
TOTAL PROJECT C $4,914,800
$3,846,154
$4,000,000
$0
Indirect Cost: $198,800
Contingencies Cost: $280,000
CE Cost: $240,000
PE Cost: $196,000
Bid Amt $0
Additional Comments
Project History
Split from CSJ: 0921-02-107
Type of Amendme Revised for Year of Expenditure & Total Project Costs
Revision D 01-Feb-08
TIP Wrk Classifica Added Capacity Roadway Expansion
Limits - Fr US 281 Military Highway
Limits - To GSA Facility at New International Bridge
Remarks P-1
Remarks P-7
2009
Project Spon TxDOT
Bond Financing $0Other Financing $0
TIP Status: TIP
City
County Hidalgo
xDOT District Pharr
e Date for YOE Cost 01-Oct-07
ID# 154
FM 493 extNam
Total Program C $4,000,000
Sum F $ $3,200,000.00
Sum L $ $0.00Sum S $ $800,000.00
% F 80.00%% S 20.00%% L 0.00%
PROGRAM COST BREAKDOWN
12
Metro Mobility7 $0
20102010 2010 20102010201020102010201020102010 2010 2010 2010 2010 2010 2010 2010
1802-02-008
01-Apr-10
FM 3461
WIDEN TO 6 LANE ARTERIAL
1.746
CSJHwy
Descriptio
Let Dat
Yr of Exp Constr Cost
Construction Estimate
abilitation/PrevMaintMetro Corridors
idge Replace/Rehab
SafetyEnhancements
Misc-Demo-HiPriorityDistrict Discretionary
Strategic PriorityLocal Funds
Total Const Fundi
ROW Utilities Cost
Length (M
PHASE
1
MTP Prj HC-113
C XROWPE
$3,623,360$0$0
$0$0
$4,218,240$0$0
$7,841,600
$0
12
111098
62
TOTAL PROJECT C $9,521,253
$7,250,000
$7,841,600
$35,000
Indirect Cost: $389,728
Contingencies Cost: $548,912
CE Cost: $392,080
PE Cost: $313,933
Bid Amt $0
Additional Comments
Project History
DELETED NOV '08, REPLACED W/ 0921-02-132 (I Rd)
Type of Amendme Revised for Year of Expenditure & Total Project Costs
Revision D 01-Feb-08
TIP Wrk Classifica Added Capacity Roadway Expansion
Limits - Fr FM 2061 (MCCOLL RD) E
Limits - To US 281
Remarks P-1
Remarks P-7
2010
Project Spon TxDOT
Bond Financing $0Other Financing $0
TIP Status: TIP
City Pharr
County Hidalgo
xDOT District Pharr
e Date for YOE Cost 01-Jan-08
ID# 69
NolanaNam
Total Program C $7,841,600
Sum F $ $6,273,280.00
Sum L $ $0.00Sum S $ $1,568,320.00
% F 80.00%% S 20.00%% L 0.00%
PROGRAM COST BREAKDOWN
12
Metro Mobility7 $0
Wednesday, October 29, 2008 Page 2 of 7
PHARR DISTRICT FY 2008 THRU FY 2011 TRANSPORTATION IMPROVEMENT PROGRAM
SUMMARY of CONSTRUCTION FUNDING REVENUE & FINANCIAL CONSTRAINT and PROGRAMMED AMOUNTS1-REH/PM 2-MC 3-UC 4-SC 6-BR 7-MM 8-SAF 9-ENH 10-MISC 11-DD 12-SP LCL TOTAL
Constraint Program Constraint Program Constraint Program Constraint Program Constraint Program Constraint Program Constraint Program Constraint Program Constraint Program Constraint Program Constraint Program Constraint Program Constraint Program
NOTE: 2008 List does not include projects let from 2006-2008 TIP
10,944,672$ 10,994,672$ -$ -$ -$ -$ 5,441,013$ 5,441,013$ -$ -$ 2,000,000$ 2,000,000$ -$ -$ 6,000,000$ 6,000,000$ 2,000,000$ 2,000,000$ 9,000,000$ 9,000,000$ 3,000,000$ 3,000,000$ 38,385,685$ 38,435,685$
BMPO Projects -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
HCMPO Projects -$ -$ -$ -$ -$ -$ -$ -$ -$ 2,000,000$ 2,000,000$ -$ -$ -$ -$ 6,000,000$ 6,000,000$ 2,000,000$ 2,000,000$ 9,000,000$ 9,000,000$ 3,000,000$ 3,000,000$ 22,000,000$ 22,000,000$
HSBMPO Projects -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
RURAL Projects 10,944,672$ 10,944,672$ -$ -$ 5,441,013$ 5,441,013$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 16,385,685$ 16,385,685$
10,944,672$ 10,944,672$ -$ -$ -$ -$ 5,441,013$ 5,441,013$ -$ -$ 2,000,000$ 2,000,000$ -$ -$ -$ -$ 6,000,000$ 6,000,000$ 2,000,000$ 2,000,000$ 9,000,000$ 9,000,000$ 3,000,000$ 3,000,000$ 38,385,685$ 38,385,685$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000$
46,794,000$ 46,794,000$ 4,400,000$ 4,400,000$ -$ 32,604,144$ 32,604,144$ 3,692,000$ 3,692,000$ -$ -$ -$ 68,118,616$ 68,118,616$ 27,504,460$ 27,504,460$ -$ -$ 166,772$ 166,772$ 183,279,992$ 183,279,992$
BMPO Projects 4,000,000$ 4,000,000$ -$ -$ -$ -$ 884,000$ 884,000$ -$ -$ -$ -$ -$ 24,918,616$ 24,918,616$ 4,750,460$ 4,750,460$ -$ 126,772$ 126,772$ 34,679,848$ 34,679,848$ HCMPO Projects 7,308,000$ 7,308,000$ 4,400,000$ 4,400,000$ -$ -$ -$ 2,808,000$ 2,808,000$ -$ -$ -$ -$ -$ -$ 28,600,000$ 28,600,000$ 2,922,000$ 2,922,000$ -$ 40,000$ 40,000$ 46,078,000$ 46,078,000$
HSBMPO Projects 1,916,000$ 1,916,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 14,600,000$ 14,600,000$ 7,092,000$ 7,092,000$ -$ -$ -$ 23,608,000$ 23,608,000$ RURAL Projects 33,570,000$ 33,570,000$ -$ -$ 32,604,144$ 32,604,144$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 12,740,000$ 12,740,000$ -$ -$ -$ 78,914,144$ 78,914,144$
46,794,000$ 46,794,000$ 4,400,000$ 4,400,000$ -$ -$ 32,604,144$ 32,604,144$ 3,692,000$ 3,692,000$ -$ -$ -$ -$ -$ -$ 68,118,616$ 68,118,616$ 27,504,460$ 27,504,460$ -$ -$ 166,772$ 166,772$ 183,279,992$ 183,279,992$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
33,830,025$ 33,830,025$ -$ 15,978,741$ 15,978,741$ 79,100,000$ 79,100,000$ 2,514,720$ 2,514,720$ -$ -$ -$ 5,140,000$ 5,140,000$ 20,223,872$ 20,223,872$ -$ -$ 595,840$ 595,840$ 157,383,198$ 157,383,198$
BMPO Projects 2,385,465$ 2,385,465$ -$ 15,978,741$ 15,978,741$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 18,364,206$ 18,364,206$ HCMPO Projects 10,623,360$ 7,000,000$ -$ -$ -$ -$ 1,027,520$ 1,027,520$ 1,736,733$ 1,736,733$ -$ -$ -$ -$ 2,000,000$ 2,000,000$ 12,576,960$ 10,358,720$ -$ 595,840$ 595,840$ 28,560,413$ 22,718,813$
HSBMPO Projects 4,326,400$ 4,326,400$ -$ -$ -$ -$ 1,000,480$ 1,000,480$ -$ -$ -$ -$ -$ -$ -$ 5,483,712$ 5,483,712$ -$ -$ -$ 10,810,592$ 10,810,592$ RURAL Projects 16,494,800$ 16,494,800$ -$ -$ 79,100,000$ 79,100,000$ 486,720$ 486,720$ -$ -$ -$ -$ -$ 3,140,000$ 3,140,000$ 2,163,200$ 2,163,200$ -$ -$ -$ 101,384,720$ 101,384,720$
33,830,025$ 30,206,665$ -$ -$ 15,978,741$ 15,978,741$ 79,100,000$ 79,100,000$ 2,514,720$ 2,514,720$ 1,736,733$ 1,736,733$ -$ -$ -$ -$ 5,140,000$ 5,140,000$ 20,223,872$ 18,005,632$ -$ -$ 595,840$ 595,840$ 159,119,931$ 153,278,331$ -$ -$ -$ -$ -$ (1,736,733)$ -$ -$ -$ -$ -$ -$ (1,736,733)$ 4,104,867$
24,320,832$ 24,320,832$ 35,500,000$ 35,500,000$ 8,000,000$ 8,000,000$ 38,957,000$ 38,957,000$ 18,475,889$ 18,475,889$ 11,136,154$ 11,136,154$ -$ 1,828,627$ 1,828,627$ 43,302,390$ 43,302,390$ 11,680,646$ 11,680,646$ -$ -$ 2,977,492$ 2,977,492$ 196,179,030$ 196,179,030$
BMPO Projects -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 15,452,390$ 15,452,390$ 3,624,320$ 3,624,320$ -$ 1,679,719$ 1,679,719$ 20,756,429$ 20,756,429$ HCMPO Projects 5,869,152$ 5,869,152$ 35,500,000$ 35,500,000$ -$ 3,487,077$ 3,487,077$ 11,136,154$ 11,136,154$ -$ -$ -$ -$ 19,250,000$ 19,250,000$ 780,000$ 780,000$ -$ 749,184$ 749,184$ 76,771,567$ 76,771,567$
HSBMPO Projects 1,701,952$ 1,701,952$ -$ 8,000,000$ 8,000,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 6,327,360$ 6,327,360$ -$ -$ -$ 16,029,312$ 16,029,312$ RURAL Projects 16,749,728$ 16,749,728$ -$ -$ 38,957,000$ 38,957,000$ 14,988,812$ 14,988,812$ -$ -$ -$ 1,828,627$ 1,828,627$ 8,600,000$ 8,600,000$ 948,966$ 948,966$ -$ 548,589$ 548,589$ 82,621,722$ 82,621,722$
24,320,832$ 24,320,832$ 35,500,000$ 35,500,000$ 8,000,000$ 8,000,000$ 38,957,000$ 38,957,000$ 18,475,889$ 18,475,889$ 11,136,154$ 11,136,154$ -$ -$ 1,828,627$ 1,828,627$ 43,302,390$ 43,302,390$ 11,680,646$ 11,680,646$ -$ -$ 2,977,492$ 2,977,492$ 196,179,030$ 196,179,030$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
115,889,529$ 115,889,529$ 39,900,000$ 39,900,000$ 23,978,741$ 23,978,741$ 156,102,157$ 156,102,157$ 24,682,609$ 24,682,609$ 13,136,154$ 13,136,154$ -$ 1,828,627$ 1,828,627$ 122,561,006$ 122,561,006$ 61,408,978$ 61,408,978$ 9,000,000$ 9,000,000$ 6,740,104$ 6,740,104$ 575,227,905$ 575,227,905$
BMPO Projects 6,385,465$ 6,385,465$ -$ 15,978,741$ 15,978,741$ -$ 884,000$ 884,000$ -$ -$ -$ -$ -$ 40,371,006$ 40,371,006$ 8,374,780$ 8,374,780$ -$ 1,806,491$ 1,806,491$ 73,800,483$ 73,800,483$
HCMPO Projects 23,800,512$ 20,177,152$ 39,900,000$ 39,900,000$ -$ -$ -$ 7,322,597$ 7,322,597$ 14,872,887$ 14,872,887$ -$ -$ -$ -$ 55,850,000$ 55,850,000$ 18,278,960$ 16,060,720$ 9,000,000$ 9,000,000$ 4,385,024$ 4,385,024$ 173,409,980$ 167,568,380$
HSBMPO Projects 7,944,352$ 7,944,352$ -$ 8,000,000$ 8,000,000$ -$ 1,000,480$ 1,000,480$ -$ -$ -$ -$ -$ 14,600,000$ 14,600,000$ 18,903,072$ 18,903,072$ -$ -$ -$ 50,447,904$ 50,447,904$
RURAL Projects 77,759,200$ 77,759,200$ -$ -$ 156,102,157$ 156,102,157$ 15,475,532$ 15,475,532$ -$ -$ -$ 1,828,627$ 1,828,627$ 11,740,000$ 11,740,000$ 15,852,166$ 15,852,166$ -$ 548,589$ 548,589$ 279,306,271$ 279,306,271$
115,889,529$ 112,266,169$ 39,900,000$ 39,900,000$ 23,978,741$ 23,978,741$ 156,102,157$ 156,102,157$ 24,682,609$ 24,682,609$ 14,872,887$ 14,872,887$ -$ -$ 1,828,627$ 1,828,627$ 122,561,006$ 122,561,006$ 61,408,978$ 59,190,738$ 9,000,000$ 9,000,000$ 6,740,104$ 6,740,104$ 576,964,638$ 571,123,038$ -$ -$ -$ -$ -$ (1,736,733)$ -$ -$ -$ -$ -$ -$ (1,736,733)$ 4,104,867$
Note: Preliminary Engineering , ROW, Contstruction Engineering, Contingencies and Indirect Costs are constrained STATEWIDE and are included in the STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM.
Financial Constraint
Districtwide Project Total
2008
annual project totals
Financial Constraint
Districtwide Project Total
2009
annual project totals
annual project totals
Financial Constraint
Districtwide Project Total
2010
annual project totals
Financial Constraint
Districtwide Project Total
2011
TIP
TO
TA
L
Financial Constraint
TIP 4-YR
TOTAL
Districtwide Project Total
T:\PHRPLNG\T I P\FY 2008 - FY 2011 TIP Revisions\AUG 2008\08-08-08 Aug 08 Rev Fin Cons Wrksht.xls Printed: 8/8/2008 11:39 AM
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- DD
7-M
etro
Mob
ility
11-D
ist D
isc
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(L
ocal
, Bon
d, e
tc)
Spec
ial S
tudy
Tra
nsit
- FT
A 5
307
Tra
nsit
- Sta
te 5
307
Tra
nsit
- Loc
al
TO
TA
L
Spri
ng F
Y 0
4 Sp
ring
C
MS
Fore
cast
Cos
t Eff
Bas
e Y
r L
OS
Fore
case
LO
S
TO
TA
L S
CO
RE
1
LS LUMP SUM HC-1 LS 1Various Rehabilitation and Preventive Maintenance, Traffic Signal and Operations
Various $ 187,570,000 187.57 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 187.57
2
FM 491 0861-01-053 LET Jul 05
SH 107 S 7.5 Mi 2.54 Mi N of US 83 HC-1 1 7.5 2Reconstruct, Add Shoulders & Add New Bridge Structure & Approaches
$ 6,804,984 6.80 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 6.80 $ 6.80
3
FM 2221 0069-03-012 Let Sep 05
Citrus City 0.80 Mi W of FM 492
Int'n @ Jara Chinas Rd HC-1 1 5.5 2 Rehabilitate Pavement & Add
Shoulders $ 4,387,802 4.39 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.39 $ 4.39
FM 2221 2416-02-004 Int'n of 7 Mi Rd S
Int'n of US 83 in La Joya HC-1 1 6.3 2 Rehabilitate Pavement & Add
Shoulders $ 4,229,691 4.23 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.23 $ 4.23
1- REH/PM
Proposed Project Data Funding Information (in million $) & Financial ConstraintExisting Roadway Data
CATEGORY-1: PREV. MAINT./REHAB
Forecast Roadway Data Project Score
From To
Special Study- Further study needed to analyze Projects out of financial constraint because of cost inflation
Lin
e N
umbe
rs
Syst
em S
ort
* - Projects reranked per DC group Based upon 2030 Traffic Volumes
Sour
ce o
f Pro
ject
New
Fin
anci
al C
ateg
ory
Roa
dway
4 Let Sep '05Joya Shoulders
5
Bus 83 S FM 2061 (McColl Rd) FM 2220 (Ware Rd) HC-1a 1 Install ITS Equipment (Scats System) REV 5'7 0039-03-900 $ 627,850 0.63 $ 0.63 $ 0.63
6
McColl Rd On McColl, Orangewood Dicker HC-202 10
1 3Construct 4 ln Roadway Construct 2 lane roadway with 4 lane transitions REV 9/07 0921 02 191
$ 4,200,000 2.00 2.20 $ 4,125,000.00
7
SH 107 N Conway FM 495 FM 1924 (3Mi-
BuddyOwens) HC-224 1,7Widen to 6 lane divided REV 9/07 0528-01-085
$ 6,100,000 $ 3 $ 3 $ 6,100,000.00
8
SH 107 N Conway
FM 1924 (3Mi-BuddyOwens) FM 676 HC-225 1,7 Widen to 6 lane divided
REV 9/07 0528-01-086 $ 9,100,000 $ 5 $ 5 $ 9,100,000
$ -
1
On US 83 .5 Mi W of Showers Rd East Inspiration/Bus 83 HC-56 SMP 2 - C 4.4 4 250 P Art 37,130 F 15.00% 6 49,129 F 61,404 B 350 Reconstruct Frontage Roads
0039-17-142, 147, 148 Palmview $ 10,100,000 $ 10,403,000 $ - $ 10.40 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 10.40 5 17 25 20 67
2
OnFM 494 (Shary Rd) TMMP
FM 1924 SH 495 HC-36 OM 2 2 2 70 M Art 15,350 F 4.20% 6 13,486 F 22,524 F 120 Widen to 4 Lane Divided McAllen $ 4,750,000 $ 4,892,500 $ - $ 4.89 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.89 25 13 25 0 63
3
On FM 2221 (Jara Chinas) FM 2221 US 83 HC-23 OM 2 6.26 2 70 RMC 2,090 B 0.00% 4 12,691 E 2,672 A 120 Widen to 4 Lane Divided Rural La Joya $ 11,737,500 $ 12,089,625 $ - $ 12.09 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 12.09 15 17 5 20 57
4
OnSH 364 (former FM 2894 Ext) (La
FM1924(3Mi-BuddyOwens) SH 495 (Mi 1 N) HC-48 OM 2 2 2 50 P Art 8,610 D 8.00% 6 17,970 F 22,194 B 120 Widen to 4 Lane Divided Palmview $ 3,750,000 $ 3,862,500 $ - $ 3.86 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.86 15 6 15 20 56
2- MCCATEGORY-2: METRO CORRIDORS
4 Homa Rd)
5
On SP 115 (S 23rd St) US 83 Spur 241 HC-51 SMP 2 - C 6.9 4 270 P Art 28,415 F 5.00% 6 36,784 F 42,549 F 150 Widen to 6 Lane Divided Urb Hidalgo $ 18,000,000 $ 20,000,000 $ - $ 20.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 20.00 25 6 25 0 56
6
On US 281 FM 490 FM 2812 HC-53 OM 2 4.6 4 300 P Art 12,033 B 10.00% 4 34,849 F 48,006 B 350 Convert to 4 Lane Interstate County $ 20,000,000 $ 20,600,000 $ - $ 20.60 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 20.60 25 6 5 20 56
7
OnUS 281 (Military Hwy)
US 281 E Mile 3 E - Cameron County Line
HC-55 SMP 2 - C 22.1 2 100 MinArt 7,700 C 15.00% 4 10,976 F 15,956 D 150
Widen to 4 Lane Divided Rural 0220-01-901, 902 903; 0220-02-900; 0220-01-023
Various $ 46,444,445 $ 46,444,445 $ - $ 46.44 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 46.44 15 6 10 10 41
8
On FM 2220 (Ware Rd) SH 107 S. FM 1924 (3 mile) HC-19 SMP 2 - C 4.6 2 80 M Art 7,090 D 4.60% 6 9,792 F 21,347 E 120 Widen to 6 Lane Divided
2094-01-038; 2094-01-039 McAllen $ 34,150,000 $ 34,150,000 $ - $ 34.15 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 34.15 15 0 15 5 35
9
On FM 3072 US 281 FM 907 HC-26 OM 2 (7) 3.8 2 80 Coll 7,962 B 2.00% 4 12,345 F 6,359 A 120 Widen to 4 Lane Divided County/Phr $ 7,125,000 $ 7,338,750 $ - $ 7.34 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.34 15 6 5 25 51
10
OnFM 494 (Shary Rd) TMMP
FM 1924 SH 107 HC-37 TMP 2 4.3 2 70 M Art 14,330 F 4.60% 4 13,486 F 19,071 E 120 Widen to 4 LanesMission/Palmhurst/
Alton $ 8,062,500 $ 8,304,375 $ - $ 8.30 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 8.30 15 6 25 5 51
11
Off Mid Valley Connector US 83 US 281 HC-45 SMP
TMP 2 - C 8.7 0 40 TE 18,390 F 25.00% 4 32,994 F 6,030 A NA Extend Controlled Access Expressway to Border
Mc/Phr/Co RMA
REV 9/07 $ 150,000,000 $ 154,500,000 $ - $ 154.50 $ - $ - $ - $ - $ - $ - $ - $ - $ - 84.00 $ - $ - $ - $ - $ 238.50 0 0 25 25 50
12
On SH 107 FM 2220 (Ware Rd) Jackson Rd HC-46 2 4.2 4 152 P Art 24,346 F 2.80% 4 29,791 F 28,461 F 150 Widen to 6 Lane Divided McA/Edb $ 4,000,000 $ 4,120,000 $ - $ 4.12 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.12 25 0 25 0 50
On US 83 Starr County Line La Joya Loop HC-57 OM 2 3.3 2 200 P Art 17,486 F 10.00% 6 44,601 F 45,574 B 350 Widen to 4 Lane Expressway County $ 35,000,000 $ 36,050,000 $ - $ 36.05 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 36.05 5 0 25 20 5013
14
OnFM 1925 (North Arterial)
FM 907 FM 493 HC-12 2 LRP 2 4.1 2 80 RMC 7,370 D 4.50% 4 14,160 F 21,583 E 120 Widen to 4 Lane Divided County $ 7,687,500 $ 7,918,125 $ - $ 7.92 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.92 15 13 15 5 48
15
On US 83 @ Bicentennial HC-58 SMP 2 - C 0.5 4 300 EXP 68,977 F 10.00% 6 98,912 F 110,253 F 350 Add Additional Lanes McAllen $ 2,000,000 $ 2,060,000 $ - $ 2.06 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.06 15 6 25 0 46
10
On FM 1015 SH 107 Mile 12 N Rd HC-2 OM 2 4.5 2 80 Coll 10,090 E 4.20% 4 16,432 F 15,517 A 120 Widen to 4 Lane Divided 1228-03-900 County $ 8,437,500 $ 8,690,625 $ - $ 8.69 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 8.69 15 0 20 10 45
11
On FM 1925 Ware Rd FM 2061 HC-9 SMP 2 - C 3.8 2 80 Col 11,110 F 5.00% 4 13,181 F 13,588 B 120 Widen to 4 Lane Divided 1803-01-900 Edinburg $ 6,000,000 $ 6,180,000 $ - $ 6.18 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 6.18 0 0 25 20 45
12
On FM 2061 (Jackson Rd)
11/2 Mile S. of Ridge Rd FM 3072 HC-16 SMP 2 - C 3.98 4 120 PART 13,970 F 5.00% 4 16,094 F 15,715 F 120
Improve traffic signal and add through lanes and ctl. Rev TIP 2'06 Cost = $8,119,615
McA/Phr $ 3,750,000 $ 8,119,615 $ 8,119,615 $ - $ 6.87 $ - $ - $ - $ - $ - 1.25 $ - $ - $ - $ - $ - $ - $ - $ - $ 8.12 20 0 25 0 45
13
On FM 1925 FM 2993 W FM 2220 (Ware Rd) HC-11 OM 2 3 2 80 RMC 4,800 C 5.00% 4 11,038 E 3,063 A 120 Widen to 4 Lane Rural County $ 5,625,000 $ 5,793,750 $ - $ 5.79 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 5.79 0 13 10 20 43
14
On FM 2812 TMMP US 281 2 mi E of US 281 HC-24 TMP 2 2 2 120 RMC 2,610 B 0.00% 4 13,463 F 6,968 A 120 Widen to 4 Lane $ 3,750,000 $ 3,862,500 $ - $ 3.86 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.86 0 13 5 25 43
15
OnFM 494 (Shary Rd) TMMP 0864 01 056
FM 1924 FM 676 HC-37a TMP 2 3 2 70 M Art 14,331 F 4.60% 4 13,486 F 19,072 E 120 Widen to 4 Lanes Rev TIP 11'05, Added Project
Mission/Palmhurst/
Alton $ 5,000,000 $ 5,150,000 $ 5.15 $ 5.15 0 13 25 5 43
11
On FM 1015 FM 1925 (W) SH 107 HC-3 OM 2 1.5 2 80 RMC 4,840 C 2.00% 4 7,763 D 8,583 A 120 Widen to 4 Lane Divided Edcouch $ 3,375,000 $ 3,476,250 $ - $ 3.48 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.48 15 0 10 15 40
Printed 11/3/2008 11:23 AMUpdated: 02/23/06
375
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- DD
7-M
etro
Mob
ility
11-D
ist D
isc
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(L
ocal
, Bon
d, e
tc)
Spec
ial S
tudy
Tra
nsit
- FT
A 5
307
Tra
nsit
- Sta
te 5
307
Tra
nsit
- Loc
al
TO
TA
L
Spri
ng F
Y 0
4 Sp
ring
C
MS
Fore
cast
Cos
t Eff
Bas
e Y
r L
OS
Fore
case
LO
S
TO
TA
L S
CO
RE
Proposed Project Data Funding Information (in million $) & Financial ConstraintExisting Roadway Data Forecast Roadway Data Project Score
From To
Special Study- Further study needed to analyze Projects out of financial constraint because of cost inflation
Lin
e N
umbe
rs
Syst
em S
ort
* - Projects reranked per DC group Based upon 2030 Traffic Volumes
Sour
ce o
f Pro
ject
New
Fin
anci
al C
ateg
ory
Roa
dway
12
OnFM 1925 (North Arterial)
FM 493 E FM 88 HC-13 2 LRP 2 2.7 2 80 RMC 5,450 C 0.00% 6 16,608 F 16,712 C 120 Widen to 4 Lane Divided County $ 5,062,500 $ 5,214,375 $ - $ 5.21 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5.21 15 0 10 15 40
13
OnSH 336 (S 10th St) TMMP
S 2nd St. US 281 Military Hwy (widening of Bridge) HC-47 TMP 2 4.8 4 80 P Art 21,530 F 4.60% 6 39,171 F 39,149 F 120 Widen to 6 Lanes
2966-01-009
McAllen/Hidalgo/C
ounty $ 11,400,000 $ 11,742,000 $ - $ 11.74 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 11.74 15 0 25 0 40
14
On FM 2062 Ext US 83 S Bus 83 HC-18 OM 2 0.85 2 60 COLL 5,220 C 5.00% 4 14,453 E 6,504 B 100 Widen to 4 Lane Divided Plmv/Co $ 1,445,000 $ 1,488,350 $ - $ 1.49 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 1.49 0 13 10 15 38
15
On FM 492 FM 2221 S FM 1924 HC-30 OMU 2 4 2 80 Coll 6,780 B 0.00% 4 12,419 E 4,395 A 120 Widen to 4 Lane Divided $ 7,500,000 $ 7,725,000 $ - $ 7.73 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.73 0 13 5 20 38
16
On FM 907 (Alamo Rd) SH 107 Nolana HC-40 OM 2 4.8 2 90 RMC 7,470 C 2.00% 4 14,125 E 21,334 E 120 Widen to 4 Lane Divided $ 9,000,000 $ 9,270,000 $ - $ 9.27 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9.27 15 13 10 0 38
12
On FM 1016 US 83 Military Hwy HC-4 TMP 2 2.15 2 80 P Art 10,860 E 4.20% 6 24,863 F 32,251 F 120 Widen to 6 Lanes $ 5,106,250 $ 5,259,438 $ - $ 5.26 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5.26 10 6 20 0 36
13
OnFM 494 (Shary Rd) TMMP
FM 676 SH 107 HC-37b TMP 2 1.3 2 70 M Art 14,332 F 4.60% 4 13,486 F 19,073 E 120 Widen to 4 Lanes Rev TIP 11'05, Added Project
Mission/Palmhurst/
Alton $ 3,062,000 $ 3,153,860 $ 3.15 $ 3.15 0 6 25 5 36
14
On FM 2221 FM 492 Jara Chinas Rd HC-21 OM 2 10.13 2 70/120 RMC 10,800 E 0.00% 4 15,843 E 19,635 E 120 Widen to 4 Lane Divided Rural La Joya $ 18,993,750 $ 19,563,563 $ - $ 19.56 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 19.56 15 0 20 0 35
15
On SH 495 Ext (Mile 1 N) SH 495 (Abram Rd) SH 364 (La Homa Rd) HC-50 OM 2 3 2 70 Coll 7,840 D 2.00% 8 25,784 F 21,372 E 100
Reconstruct to New 4 Lane Divided 0865-01-082
Palmview $ 6,750,000 $ 6,952,500 $ - $ 6.95 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 6.95 15 0 15 5 35
16
On SP 241 US 281 Military Hwy GSA Facilities @ Hidalgo HC-52 SMP 2 -C 1 26,690 F 25.00% 6 34,137 F 34,136 D
Widen to 6 Lane Divided Arterial 0255-09-900
$ 2,000,000 $ 2,600,900 $ - $ 2.60 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.60 0 0 25 10 35
17
On FM 1427 US 83 Abram HC-7 OM 2 6.4 2 80 Coll 4,190 B 2.00% 4 9,481 D 2,138 A 80 Widen to 4 Lane Divided County $ 12,000,000 $ 12,360,000 $ - $ 12.36 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 12.36 0 13 5 15 33
18
On FM 1427 Abram E & N Bus 83 HC-8 OM 2 2.1 2 80 Coll 2,710 B 2.00% 4 9,221 D 2,518 A 80 Widen to 4 Lane Divided Penitas/Mis $ 3,937,500 $ 4,055,625 $ - $ 4.06 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.06 0 13 5 15 33
19
OffMile 1 North(SH 495 ext.)
FM 1423 FM 1015 HC-44 OM 2 9 2 60 PART 0 NA 8.30% 4 0 F 9,303 D 120 Extend 2 Lane FM Road County $ 6,187,500 $ 6,373,125 $ - $ 6.37 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 6.37 0 23 10 33
20
On FM 492 FM 1924 US 83 HC-31 OM 2 2.4 2 60 U Col 6,320 C 2.00% 4 9,841 D 4,174 A 120 Widen to 4 Lane County $ 4,500,000 $ 4,635,000 $ - $ 4.64 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.64 0 6 10 15 31
21
OnUS 281 0255-07-110 Mar'06
SH 107 Bus 281 (North Side) HC-54 SMP 2 - C 3.1 4 350 EXP 49,968 C 25.00% 6 56,946 E 78,366 C 350Widen to 6 Lane Expressway 0255-07-110 Rev TIP 11 '05, Added project
Edb/Phr $ 33,500,000 $ 40,049,434 $ 40,049,434 $ - $ 40.05 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 40.05 5 6 10 10 31
22
On FM 1925 Kenyon FM 907 HC-10 TMP 2 1 2 80 Col 8,520 D 4.30% 4 15,556 E 16,487 C 120 Widen to 4 Lane Divided Edinburg $ 2,250,000 $ 2,317,500 $ - $ 2.32 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.32 5 0 15 10 30
23
On FM 2221 SH 364 (LaHoma Rd) FM 681 (N) HC-22 2 0.6 2 7,780 B 0.00% 4 16,097 F 15,160 C Widen to 4 Lane Divided 0862-01-037 TXDOT $ 1,500,000 $ 1,545,000 $ - $ 1.55 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.55 10 0 5 15 30
24
On FM 493 Champion St US 281 HC-32 OM 2 6.1 2 60 Coll 7,380 C 5.70% 4 7,716 C 7,269 B 120 Widen to 4 Lane Donna $ 10,370,000 $ 10,681,100 $ - $ 10.68 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 10.68 15 0 10 5 30
25
On FM 2220 (Ware Rd) FM 1925 SH 107 HC-20 SMP 2 - C 2.6 2 3,140 B 4.60% 4 7,420 C 13,772 B Widen to 4 Lane Divided
2094-01-902 McAllen $ 4,375,000 $ 4,506,250 $ - $ 4.51 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.51 15 13 5 5 28
26
On FM 1425 Mi 9 N Rd US 83 HC-5 OM 2 3 2 Var COLL 4,450 C 5.00% 4 11,850 E 22,210 E NA Widen to 4 Lane Rural County $ 5,625,000 $ 5,793,750 $ - $ 5.79 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 5.79 0 17 10 0 27
27
On FM 491 SH 107 Mile 10 N HC-28 ? 2 4.8 2 90 RMC 4,280 C 2.00% 4 8,104 E 11,081 D 120 Widen to 4 Lane Divided $ 4,500,000 $ 4,635,000 $ - $ 4.64 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.64 5 6 10 5 26
On FM 88 FM 1925 Mile 12 N Rd HC-39 OM 2 6 2 100 M Art 11,450 E 2.00% 4 14,883 E 20,128 E 120 Widen to 4 Lane Divided 0698 03 080 079 County $ 11,250,000 $ 11,587,500 $ - $ 11.59 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 11.59 0 6 20 0 26
28
O 88 9 5 e N d C 39 O 6 00 t , 50 .00% ,883 0, 8 0 0698-03-080, 079 Cou ty $ , 50,000 $ ,587,500 $ $ .59 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ .59 0 6 0 0 26
29
On FM 88 0698-03-080 0.25 Mi N Of Mi 16 S 0.05 Mi N of Mi 12 HC-39a OM 2 4.2 2 100 M Art 11,450 E 2.00% 4 14,883 E 20,128 E 120
Widen to 4 Lane Divided 0698-03-080 Rev TIP 02'06, limits & Cost = $8 000 000
County $ 8,000,000 $ 8,000,000 $ 8.00 $ 8.00 0 6 20 0 26
30
OnFM 1925 (North Arterial)
FM 88 E FM 491 HC-14 2 LRP 2 3.9 2 80 RMC 4,260 C 5.00% 4 5,011 E 7,160 B 121 Widen to 4 Lane Divided County $ 7,312,500 $ 7,531,875 $ - $ 7.53 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.53 0 0 10 15 25
Printed 11/3/2008 11:23 AMUpdated: 02/23/06
376
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- DD
7-M
etro
Mob
ility
11-D
ist D
isc
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(L
ocal
, Bon
d, e
tc)
Spec
ial S
tudy
Tra
nsit
- FT
A 5
307
Tra
nsit
- Sta
te 5
307
Tra
nsit
- Loc
al
TO
TA
L
Spri
ng F
Y 0
4 Sp
ring
C
MS
Fore
cast
Cos
t Eff
Bas
e Y
r L
OS
Fore
case
LO
S
TO
TA
L S
CO
RE
Proposed Project Data Funding Information (in million $) & Financial ConstraintExisting Roadway Data Forecast Roadway Data Project Score
From To
Special Study- Further study needed to analyze Projects out of financial constraint because of cost inflation
Lin
e N
umbe
rs
Syst
em S
ort
* - Projects reranked per DC group Based upon 2030 Traffic Volumes
Sour
ce o
f Pro
ject
New
Fin
anci
al C
ateg
ory
Roa
dway
31
On FM 2993 (West Loop) FM 1925 S SH 107 HC-25 OM 2 3.6 2 80 RMIC 3,440 B 0.00% 4 10,431 E 9,378 B 120 Widen to 4 Lane Rural County $ 6,750,000 $ 6,952,500 $ - $ 6.95 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 6.95 0 0 5 20 25
32
On FM 493 FM 1925 S SH 107 HC-33 OM 2 1.9 2 80 RMC 4,920 C 0.00% 4 7,746 D 5,310 A 120 Widen to 4 Lane Divided La Blanca $ 3,230,000 $ 3,326,900 $ - $ 3.33 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 3.33 0 0 10 15 25
33
On FM491 Mile 10 N Rd US 83 HC-43 OM 2 3 2 90 RMC 4,280 C 2.00% 4 15,262 E 12,473 C 120 Widen to 4 Lane Divided $ 5,100,000 $ 5,253,000 $ - $ 5.25 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5.25 5 0 10 10 25
34
On US 83 @ Bryan Rd HC-59 OM 12 0.5 4 300 EXP 45,119 C 10.00% 6 93,600 78,136 D 350Construct New Overpass to Accommodate Prop Anzalduas Int'l Brdg
Mission $ 50,000,000 $ 51,500,000 $ - $ 51.50 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 51.50 5 0 10 10 25
35
On FM 396 Ext (Bryan Rd) US 83
Proposed Anzalduas Int'l Bridge GSA Facilities
HC-27 OM 2 (7) 4.7 4 120 P Art 0 0 2.00% 4 0 29,868 F 120 Construct 4 Lane International Bridge Connection Mission $ 17,000,000 $ 17,510,000 $ - $ 17.51 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 17.51 0 21 0 0 21
36
On FM 907 (Alamo Rd) Ridge Rd US 281 (Military
Hwy) HC-41 OM 2 (7) 6.2 2 80 Coll 6,670 C 2.00% 4 9,792 D 15,948 C 120 Widen to 4 Lane Divided County $ 11,625,000 $ 11,973,750 $ - $ 11.97 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 11.97 0 6 10 5 21
37
On FM 2062 Bus 83 S Bentsen State Park HC-17 OM 2 2.7 2 40 COLL 8,270 D 5.00% 4 1,422 B 2,491 B 80 Widen to 4 Lane Divided County $ 5,062,500 $ 5,214,375 $ - $ 5.21 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 5.21 0 0 15 5 20
38
On FM 491 FM 1925 S SH 107 HC-29 OMU 2 1.5 2 60 RMC 7,090 D 2.00% 4 4,784 C 6,708 B 120 Widen to 4 Lane Divided La Villa $ 2,550,000 $ 2,626,500 $ - $ 2.63 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.63 0 0 15 5 20
39
On FM 493 SH 107 S Mile 10 N HC-34 OM 2 6.3 2 80 RMC 5,490 C 4.00% 4 11,778 E 12,484 C 120 Widen to 4 Lane Divided Donna $ 11,812,500 $ 12,166,875 $ - $ 12.17 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 12.17 0 0 10 10 20
40
On FM 88 FM 1925 SH 107 HC-39c OM 2 1.654 2 100 M Art 11,450 E 2.00% 4 14,883 E 20,128 E 120Widen to 4 Lane Divided 0698-03-080, 079 Rev TIP 02'06, limits & Cost
County $ 4,901,580 $ 4,901,580 $ 4.90 $ 4.90 0 0 20 0 20
41
On FM 88 0698-03-084 SH 107 0.05 Mi N of Mi 12 HC-39b OM 2 0.25 2 100 M Art 11,450 E 2.00% 4 14,883 E 20,128 E 120
Widen to 4 Lane Divided 0698-03-084, 079 Rev TIP 02'06, limits & Cost
County $ 966,494 $ 966,494 $ 0.97 $ 0.97 0 0 20 0 20
42
On FM 681 FM 681 (N) @ FM 2221 SH 107 HC-38 2 1.9 2 7,780 B 1.00% 4 23,172 F 19,784 E Widen to 4 Lane Divided 0669-01-043 TXDOT $ 3,000,000 $ 3,090,000 $ - $ 3.09 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.09 0 6 5 5 16
43
On FM 1425 SH 107 MILE 9 N HC-6 OM 2 5.2 2 2,890 B 5.00% 4 7,225 C 9,456 B Widen to 4 Lane Divided County $ 9,750,000 $ 10,042,500 $ - $ 10.04 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 10.04 0 0 5 5 1043
44
OnFM 907 (Alamo Rd) TMMP
FM 1925 SH 107 HC-42 TMP 2 2 2 90 RMC 3,010 B 2.00% 4 12,480 E 13,813 D 120 Widen to 4 Lanes $ 3,750,000 $ 3,862,500 $ - $ 3.86 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.86 0 0 5 5 10
45
On SH 495 0.359 mile N US 83 0.347 mile S US 83 HC-49 SMP 2 - C 0.7 340 A 2.00% 2,555 B 1,515 AConstruct underpass and approaches 0865-01-085
Palmview $ 5,000,000 $ 5,150,000 $ - $ 5.15 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5.15 5 0 0 5 10
46
OnFM 1925 (North Arterial)
FM 491 Cameron County Line HC-15 2 LRP 2 4 2 NA 4.50% 4 0 1,094 A New Location 4 Lane Divided
arterial $ 9,000,000 $ 9,270,000 $ - $ 9.27 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9.27 0 0 5 5
47
On US 83-LaJoya Loop Starr County Line FM 1427 HC-60 TMP
LRP 2 9.3 0Toll
Expressway
0 NA 12.00% 4 53,914 F 66,046 E 350 Toll Road 4 Lane 0039-02-040
La Joya RMA
REV 9/07 0039 02
$ 100,000,000 $ 103,000,000 $ - $ 103.00 $ - $ - $ - $ - $ - $ - $ - $ - 25 25 $ - $ - $ - $ - $ 153.00 0 0 5 5
48
On FM 494 (Shary Rd) FM 1016 S&W&N FM 1016 HC-35 TIP 2 4 2 100 RMA 2,150 A 0.00% 4 1,911 A 5,487 A 120 Widen to 4 Lane Divided McA/Mis $ 7,500,000 $ 7,725,000 $ - $ 7.73 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.73 0 0 0 0 0
49
Various Various Various HC-61Various ITS on Major Corridors; Further Study Needed for ITS Plan
County McAllen $ 40,000,000 $ 41,200,000 $ 94,499,574 $ - $ 41.20 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 41.20 0
A difference of $ 881,369,519 $ 916,779,178 $ 35,409,659
Printed 11/3/2008 11:23 AMUpdated: 02/23/06
377
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- DD
7-M
etro
Mob
ility
11-D
ist D
isc
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(L
ocal
, Bon
d, e
tc)
Spec
ial S
tudy
Tra
nsit
- FT
A 5
307
Tra
nsit
- Sta
te 5
307
Tra
nsit
- Loc
al
TO
TA
L
Spri
ng F
Y 0
4 Sp
ring
C
MS
Fore
cast
Cos
t Eff
Bas
e Y
r L
OS
Fore
case
LO
S
TO
TA
L S
CO
RE
Proposed Project Data Funding Information (in million $) & Financial ConstraintExisting Roadway Data Forecast Roadway Data Project Score
From To
Special Study- Further study needed to analyze Projects out of financial constraint because of cost inflation
Lin
e N
umbe
rs
Syst
em S
ort
* - Projects reranked per DC group Based upon 2030 Traffic Volumes
Sour
ce o
f Pro
ject
New
Fin
anci
al C
ateg
ory
Roa
dway
75
LS Lump Sum Various Various HC-63 6Various On/Off System Bridge Replace/Rehab & RR Grade Separation
Various $ 13,050,000 $ - $ - $ - $ - $ - 13.05 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 13.05
76
OffCR 6882 Inspiration Rd 0921-02-145
@ Edinburg Main Canal .25 Mi N of Mi HC-63a 6
Replace Bridge & Fix Approaches 0921-02-145
$ 400,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
77
Off Mi 2 W @ Drain Ditch .2 Mi S of FM 1925 HC-63b 6
Replace Bridge & Fix Approaches 0921-02-147
$ 400,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Off 5th St Over Main Supply Ch l STR NO L001-40-001 HC-64 6
Replace Bridge & Reconstruct Approaches $ 450,000 $ - $ - $ - $ - $ - 0.45 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.45
6- BRCATEGORY-6: BRIDGE
78Channel pp
0921-02-915,
79
Off CR - County Rd
@ 0.6 Mi E of JCT FM 491 @ drainage ditch' HC-65 6
Replace Bridge & Fix Approaches 0921-02-931
$ 320,000 $ - $ - $ - $ - $ - 0.32 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.32
80
Off CR 232 @ Willacy Main Canal HC-66 6 Replace Bridge & Approaches 0921-02-063 $ 390,000 $ - $ - $ - $ - $ - 0.39 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.39
81
OffCR 342 (Charles green)
Over irrigation canal HC-67 6Replace Bridge & Repair Approaches 0921-02-930
$ 300,000 $ - $ - $ - $ - $ - 0.30 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.30
82
Off CR 344 @ Drainage Ditch HC-68 OM 6 0.6 Bridge Replacement $ 820,000 $ - $ - $ - $ - $ - 0.82 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.82
83
Off CR 629 (Old Military Rd) Over main drain HC-69 6 0.1 Replace Bridge & Approaches
0921-02-911 $ 274,000 $ - $ - $ - $ - $ - 0.27 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.27
84
Off CS 170 (14th St) @ Llano Grande HC-70 OM 6 0.1
Replace Bridge & Repair Approaches 0921-02-138
Mercedes $ 738,000 $ - $ - $ - $ - $ - 0.74 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.74
85
On FM 2557 Main floodway STR 1429-01-002 2.5 mi S of Bus 83 HC-71 6
Replace Bridge & Fix Approaches 1429-01-029
$ 625,000 $ - $ - $ - $ - $ - 0.63 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.63
86
Off Idela Dr @ Drainage Ditch HC-72 6 Replace Bridge & Approaches 0921-02-060 $ 250,000 $ - $ - $ - $ - $ - 0.25 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.25
Off Mi 151/2 N Rd
@ N Floodway Pilot Ch l HC-73 6 Replace Bridge & Approaches
0921 02 062 $ 320,000 $ - $ - $ - $ - $ - 0.32 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.32 87
Off Rd Channel HC 73 6 0921-02-062 $ 320,000 $ $ $ $ $ 0.32 $ $ $ $ $ $ $ $ $ $ $ 0.32
88
Off Mile 41/2 RD Over Main Supply Channel
STR NO AA08-55-001 HC-74 6
Replace Bridge & Reconstruct Approaches 0921-02-910
$ 424,000 $ - $ - $ - $ - $ - 0.42 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.42
89
Off Moore Rd (CR 790) @ Drainage Ditch HC-75 OM 6 0.1
Replace Bridge & Repair Approaches 0921-02-901
Phr $ 315,000 $ - $ - $ - $ - $ - 0.32 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.32
90
Off Nittler Rd over willacy main canal HC-76 6 Replace Bridge & Approaches 0921-02-098 $ 480,000 $ - $ - $ - $ - $ - 0.48 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.48
91Off Schunior Rd Over N Main Drain STR No AA03-71-001 HC-77 6 0.1
Replace Bridge & Reconstruct Approaches 0921-02-913
$ 274,000 $ - $ - $ - $ - $ - 0.27 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.27
$ 19,830,000
Printed 11/3/2008 11:23 AMUpdated: 02/23/06
378
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- DD
7-M
etro
Mob
ility
11-D
ist D
isc
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(L
ocal
, Bon
d, e
tc)
Spec
ial S
tudy
Tra
nsit
- FT
A 5
307
Tra
nsit
- Sta
te 5
307
Tra
nsit
- Loc
al
TO
TA
L
Spri
ng F
Y 0
4 Sp
ring
C
MS
Fore
cast
Cos
t Eff
Bas
e Y
r L
OS
Fore
case
LO
S
TO
TA
L S
CO
RE
Proposed Project Data Funding Information (in million $) & Financial ConstraintExisting Roadway Data Forecast Roadway Data Project Score
From To
Special Study- Further study needed to analyze Projects out of financial constraint because of cost inflation
Lin
e N
umbe
rs
Syst
em S
ort
* - Projects reranked per DC group Based upon 2030 Traffic Volumes
Sour
ce o
f Pro
ject
New
Fin
anci
al C
ateg
ory
Roa
dway
1
Off Jackson Ave Bicentennial Ave 2nd St HC-130 OMU 7 1 2 50 Coll 13,060 F 2.00% 4 9,548 E 14,201 D 80 Widen to 4 Lane McAllen $ 1,375,000 $ 1,416,250 $ - $ - $ - $ - $ - $ - 1.42 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.42 25 13 25 5 68
2
Off Airport Drive (Weslaco) Bus 83 US 83 HC-85 OM 7 0.9 2 60 M Art 11,060 F 2.00% 4 11,592 F 8,488 B 80 Widen to 4 Lane Weslaco Wes-Pr. $ 1,237,500 $ 1,274,625 $ - $ - $ - $ - $ - $ - 1.27 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.27 15 6 25 20 66
3
Off Pike Blvd Westgate (Mile 6 W) US 83 HC-159 OMU 7 1.9 4 50 M Art 11,200 B 2.00% 4 22,108 F 15,389 B 100 Widen to 4 Lane Divided Weslaco $ 3,230,000 $ 3,326,900 $ - $ - $ - $ - $ - $ - 3.33 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.33 25 13 5 20 63
OnFM 1924 1802-01-031 FM 492 (Abram Rd) SH 107 HC-109 TIP 7,8 4.2 2 90 Col 13,760 E 7.30% 4 18,210 F 16,490 C 120
Widen to 4 Lane Divided - Improve Traffic Signal, Add Palmhurst $ 6,000,000 $ 11,250,000 $ 11,250,000 $ - $ - $ - $ - $ - $ - 9.75 1.50 $ - $ - $ - $ - $ - $ - $ - $ - $ 11.25 25 0 20 15 60
7-MMCATEGORY-7: METRO MOBILITY/REHAB & CATEGORY-11: DISTRICT DISCRETIONARY
Revised Estimate TIP 05'06
4 Aug '06( ) , , , ,
Thru Lanes & CLTL 1802 01 031 Rev TIP 05'06
, , , , , ,
5
On FM 907 (Alamo Rd) Bus 83 Ridge Road Rancho
BlancoHC-118 OM 7 0.7 2.4 90 M Art 11,280 F 2.00% 4 11,942 F 15,599 B 120
Widen to 4 Lane Divided Rev TIP 05'06 Revised Estimate
Alamo $ 1,575,000 $ 7,700,000 $ 7,700,000 3.85 $ - $ - $ - $ - $ - 3.85 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.70 15 0 25 20 60
6
Off Sugar Rd Schunior Ave SH 107 HC-171 OM 7 0.7 2 50 M Art 15,550 F 2.00% 4 8,814 D 11,080 B 100 Widen to 4 Lane Edinburg $ 962,500 $ 991,375 $ - $ - $ - $ - $ - $ - 0.99 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.99 25 0 25 10 60
7
OffBicentennial Blvd (Hoehn Rd)
SH 107 Oxford-Hobbs HC-91 OMU 7 1.5 4 40 MART 7,600 D 0.00% 4 19,635 F 7,600 A 80 Construct New 4 Lane Rdwy McAllen $ 3,375,000 $ 3,476,250 $ - $ - $ - $ - $ - $ - 3.48 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.48 0 17 15 25 57
8
Off Cesar Chavez Sioux Rd Ridge Rd HC-99 OM 7 2.7 2 80 Coll 8,290 D 2.00% 4 10,202 E 11,786 B 100 Widen to 4 Lane Alamo SanJuan Pr. $ 3,712,500 $ 3,823,875 $ - $ - $ - $ - $ - $ - 3.82 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.82 25 0 15 15 55
9
Off Bicentennial Blvd Oxford - Hobbs Trenton Rd HC-89 OMU 7 1.1 4 0 MAR
T 11,310 E 2.00% 4 18,666 F 10,022 B 100 Construct 4 Lane McAllen $ 2,475,000 $ 2,549,250 $ - $ - $ - $ - $ - $ - 2.55 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.55 0 13 20 20 53
10
Off I Rd US 281 Nolana Loop HC-126 OM 7 3 2 90 Coll 13,670 E 5.00% 4 15,208 F 17,403 D 120Widen to 4 Lane Divided 0921-02-102 Rev TIP 11'05 change funding, limits & estimate
Edb/Phr/SJ/Co $ 3,000,000 $ 3,090,000 $ - $ - $ - $ - $ - $ - 3.09 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.09 15 6 20 10 51
11
Off Bridge Ave 10th St Pike Blvd HC-93 OMU 7 2 2 50 Coll 9,480 E 2.00% 4 10,533 E 9,851 B 80 Widen to 4 Lane Weslaco $ 2,750,000 $ 2,832,500 $ - $ - $ - $ - $ - $ - 2.83 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.83 15 0 20 15 50
12
On Bus 83 FM 1015 0.7 Mi. E SP 31 (Fldway) HC-95 TIP 11
1 1.7 3 130 P Art 11,231 D 4.20% 4 15,527 F 18,774 D 100Widen to 4 Lane Divided Urb 0039-04-080 Rev TIP 11 '05, Added Project
Mercedes $ 4,700,000 $ 5,390,298 2.70 $ - $ - $ - $ - $ - 2.70 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5.39 25 0 15 10 50
On FM 3461 - N l L FM 2061 (McColl Rd) US 281 HC-113 7,11,1 1.8 4 27,530 F 1.00% 6 35,414 F 34,599 F Widen to 6 Lanes McAllen $ 5,000,000 $ 5,150,000 2.50 $ - $ - $ - $ - $ - 5.15 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.65 25 0 25 0 50
Revised Estimate TIP
13
On Nolana Loop FM 2061 (McColl Rd) US 281 HC 113 7,11,1 1.8 4 27,530 F 1.00% 6 35,414 F 34,599 F Widen to 6 Lanes McAllen $ 5,000,000 $ 5,150,000 2.50 $ $ $ $ $ 5.15 $ $ $ $ $ $ $ $ $ $ 7.65 25 0 25 0 50
14
Off Nolana Loop FM 2220 (Ware Rd) SH 336 (10th St) HC-155a 7 2.25 4 P Art 33,540 F 1.00% 6 48,500 F 48,756 F Widen to 6 Lane TXDOT TXDOT $ 3,000,000 $ - $ - $ - $ - $ - $ - 3.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.00 25 0 25 0 50
15
Off Nolana Loop SH 336 (10th St) FM 2061 (McColl Rd) HC-155a 7 1.1 4 P Art 33,540 F 1.00% 6 48,500 F 48,756 F Widen to 6 Lane Rev TIP
11'05, changed limits & costTXDOT TXDOT $ 2,385,000 $ - $ - $ - $ - $
- $ - 2.39 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.39 25 0 25 0 50
16
Off Goodwin Rd Bus 83 FM 492 HC-122 OMU 7 3 2 48 COLL 3,150 B 2.00% 4 23,806 F 8,920 B 120 Widen to 4 Lane County County Pr. $ 4,125,000 $ 4,248,750 $ - $ - $ - $ - $ - $ - 4.25 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.25 0 23 5 20 48
17
Off Nolana Loop FM 494 Bentsen Rd HC-153 OM 7 0.8 4 0 M Art 0 NA 0.00% 4 21,211 F 2,848 A 120 Construct New 4 Lane McAllen/Palmhurst $ 1,360,000 $ 1,400,800 $ - $ - $ - $ - $ - $ - 1.40 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.40 0 23 25 48
18
Off Sam Houston Blvd US281 I Rd HC-163 OM 7 1.02 2 70 MIN
ART 7,180 B 2.00% 3 20,705 F 12,718 E 80 Add Left Turn Center Lane Pharr $ 701,250 $ 722,288 $ - $ - $ - $ - $ - $ - 0.72 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.72 15 23 5 5 48
19
Off Bicentennial Blvd Trenton Rd Nolana Loop HC-90 OM 7 2 4 50 M
ART 23,570 F 2.00% 4 32,784 F 21,074 E 100 Construct 4 Lane Divided McAllen $ 4,500,000 $ 4,635,000 $ - $ - $ - $ - $ - $ - 4.64 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.64 0 17 25 5 47
20
Off Sugar/ Polk SH 495 Jackson(FM 3362) HC-174 City 7 2 2 40 coll 11,140 F 2.00% 4 12,000 F 22,252 E 40 Widen to 4 Lane Divided Pharr $ 3,400,000 $ 3,502,000 $ - $ - $ - $ - $ - $ - 3.50 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.50 0 17 25 5 47
21
Off 6th St (Weslaco) Westgate Drive Bus 83 HC-83 OM 7 2.3 2 60 M Art 9,100 D 2.00% 4 6,192 B 10,312 B 80 Widen to 4 Lane Weslaco $ 3,162,500 $ 3,257,375 $ - $ - $ - $ - $ - $ - 3.26 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.26 25 6 15 0 46
Off Canton Rd FM 2061 Bus 281 HC-98 OM 7 2 2 60 M Art 7 800 C 5 00% 4 9 598 E 13 431 B 80 Widen to 4 Lane Edinburg $ 2 750 000 $ 2 832 500 $ - $ - $ - $ - $ - $ - 2 83 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2 83 15 6 10 15 4622
Off Canton Rd FM 2061 Bus 281 HC 98 OM 7 2 2 60 M Art 7,800 C 5.00% 4 9,598 E 13,431 B 80 Widen to 4 Lane Edinburg $ 2,750,000 $ 2,832,500 $ $ $ $ $ $ 2.83 $ $ $ $ $ $ $ $ $ $ 2.83 15 6 10 15 46
23
OnFM 1925 (North Arterial)
Bus 281 1803-02-019 Oct '05
US 281 HC-103 TIP 7,8 2.5 2 80 Col 12,520 F 4.30% 4 16,416 F 18,563 D 120Widen to 4 Lane Divided Urb 1803-02-019 Rev MTP Aug '05
Edinburg Edn.Pr. $ 2,640,714 $ 2,640,714 $ - $ - $ - $ - $ - $ - 2.64 $ - $ - $ - $ - $ - $ - $ - $ - $ 2.64 5 6 25 10 46
24
On FM 493 Mile 10 N Rd US 83 HC-115 OM 11 1.36 2 90 Coll 9,060 D 4.00% 4 13,910 F 19,417 D 120 Widen to 4 Lane Divided Donna $ 2,550,000 $ 3,013,147 1.51 $ - $ - $ - $ - $ - 1.51 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.01 15 6 15 10 46
Rev Aug '05
Printed 11/3/2008 11:23 AMUpdated: 02/23/06
379
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- DD
7-M
etro
Mob
ility
11-D
ist D
isc
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(L
ocal
, Bon
d, e
tc)
Spec
ial S
tudy
Tra
nsit
- FT
A 5
307
Tra
nsit
- Sta
te 5
307
Tra
nsit
- Loc
al
TO
TA
L
Spri
ng F
Y 0
4 Sp
ring
C
MS
Fore
cast
Cos
t Eff
Bas
e Y
r L
OS
Fore
case
LO
S
TO
TA
L S
CO
RE
Proposed Project Data Funding Information (in million $) & Financial ConstraintExisting Roadway Data Forecast Roadway Data Project Score
From To
Special Study- Further study needed to analyze Projects out of financial constraint because of cost inflation
Lin
e N
umbe
rs
Syst
em S
ort
* - Projects reranked per DC group Based upon 2030 Traffic Volumes
Sour
ce o
f Pro
ject
New
Fin
anci
al C
ateg
ory
Roa
dway
25
Off Mile 5 Ext. FM 2221 FM 492 HC-143 TMP 11 6.5 2 MART 0 F 0.00% 4 3,150 B 8,128 A Extend 2 Lane FM Road County $ 4,468,750 $ 4,602,813 $ - $ - $ - $ - $ - $ - 4.60 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.60 0 21 25 0 46
26
Off Sioux Rd I Rd FM 1426 HC-167 OMU 7 0.8 2 60 M Art 3,140 A 5.00% 4 15,474 E 12,533 B 80 Widen to 4 Lane SJ SJ Pr. $ 1,100,000 $ 1,133,000 $ - $ - $ - $ - $ - $ - 1.13 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.13 25 6 0 15 46
27
FM 1015 1228-03-027 Aug '06
Mile 12 N Rd. Mi 9 Rd HC-108 TIP 7, 8 3 2 80 Coll 10,090 E 4.20% 4 16,432 F 15,517 A 120Widen to 4 Lane Divided - Improve Traffic Signal, Add Thru Lanes & CLTL 1228 03 027: Rev 2'06 TIP
County $ 10,500,000 9.00 1.50 15 0 20 10 45
28
OnFM 1924 1802-01-029 Mar '06
SH 107 FM 494 (Shary Rd) HC-110 TIP 7,8 2 2 100 Col 15,210 F 4 20,750 F 11559 B 120Widen to 4 Lane Divided - Improve Traffic Signal, Add Thru Lanes & CLTL 1802 01 029 Rev TIP 2'06 for
Palmhurst $ 4,500,000 $ 9,792,217 $ 9,792,217 $ - $ - $ - $ - $ - $ - 9.01 0.78 $ - $ - $ - $ - $ - $ - $ - $ - $ 9.79 0 0 25 20 45
Revised Estimate TIP
29
On FM 907 (Alamo Rd) Nolana US 83 HC-119 OM 7 2.34 2 90 M Art 18,220 F 2.00% 4 22,316 F 20,571 E 120 Widen to 4 Lane Divided Rev
TIP 05'06 Revised Estimate Alm/Co $ 4,387,500 $ 9,700,000 $ 9,700,000 4.85 $ - $ - $ - $ - $ - 4.85 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9.70 15 0 25 5 45
30
I Rd 0921-02-102 Mar '06
Nolana Loop SH 495 HC-126 OM 7 3 2 90 Coll 13,670 E 5.00% 4 15,208 F 17,403 D 120
Widen to 4 Lane Divided 0921-02-102 Rev TIP 11'05 change funding, limits & estimate
Edb/Phr/SJ/Co $ 6,898,213 $ 6,898,213 $ - $ - $ - $ - $ - $ - 3.76 $ - $ - $ 3 $ - $ - $ - $ - $ - $ - $ 6.90 15 0 20 10 45
31
Off Hutto Rd US 83 Expressway Bus 83 HC-125 City 7 0.7 2 50 COLL 5,600 B 5.00% 4 11,955 F 5,559 A 80 Widen to 4 Lane Donna Donna Pr. $ 962,500 $ 991,375 $ - $ - $ - $ - $ - $ - 0.99 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.99 0 13 5 25 43
32
Off Mile 2 W Rd TMMP Mile12N US 83 HC-140 TMP 7 5 2 40 COLL 4,690 C 2.00% 4 11,687 F 6,067 B 100 Widen to 4 Lane Mer/Co $ 6,875,000 $ 7,081,250 $ - $ - $ - $ - $ - $ - 7.08 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.08 0 13 10 20 43
33
On Bus 83 .2 Mi W of FM 491 0.20 East of Cameron County Line HC-96 TIP 11 2.8 2 94 P Art 9,300 E 2.00% 4 19,616 F 51,187 F 100
Widen to 4 Lane Divided 0039-04-095 Rev TIP 11 '05, Added Project
Mercedes/Co $ 7,100,000 $ 9,561,924 4.78 $ - $ - $ - $ - $ - 4.78 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9.56 0 21 20 0 41
34
Off Dicker Rd TMMP Spur 115 Jackson Rd HC-104 TMP 7 2.9 4 COLL 5,960 A 2.00% 6 15,264 F 9,180 A 120 Widen to 4 Lane Divided McAllen $ 5,437,500 $ 5,600,625 $ - $ - $ - $ - $ - $ - 5.60 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5.60 10 6 0 25 41
35
On FM 1015 Floodway S US 281 (Military Hwy) HC-107 OM 11 2.5 2 120 RMC 13,880 E 4.20% 6 22,688 F 27,537 E 120
Widen to 4 Lane Divided 1228-04-013, Rev RLB 12-12-05 Rev TIP 02'06, Added Project
Wes/Prog $ 4,687,500 $ 6,812,000 3.41 $ - $ - $ - $ - $ - 3.41 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 6.81 15 0 20 5 40
36
OnFM 1925 (North Arterial)
US 281 1803-02-022 Oct '05
Kenyon HC-111 TIP 7,8 2.5 2 80 Col 12,520 F 4.30% 4 16,416 F 18,563 D 120 Widen to 4 Lane Divided Urb 1803-02-022 Rev MTP Aug '05 Edinburg Edn.Pr. $ 5,918,788 $ 5,918,788 $ - $ - $ - $ - $ - $ - 4.42 1.50 $ - $ - $ - $ - $ - $ - $ - $ - $ 5.92 5 0 25 10 40
Rev Aug '05
36
37
Off Mile 6 W Rd Mile 11 North US 83 HC-148 OM 7 3 2 50 COLL 9,630 E 2.00% 4 4,796 B 6,480 A 100 Widen to 4 Lane WeslacoCount/We
s-Pr./TXDO
T
$ 4,125,000 $ 4,248,750 $ - $ - $ - $ - $ - $ - 4.25 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.25 15 0 20 5 40
38
On FM 676 SH 107 Taylor Rd HC-117a TMP 7 3 2 40 RMC 6,210 C 2.00% 4 17,306 F 23,658 F 120 Widen to 4 Lane Alton/County $ 5,625,000 2.81 $ - $ - $ - $ - $ - 2.81 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5.63 15 13 10 0 38
39
Off Owassa Rd US 281 Cesar Chavez HC-156 OMU 7 3.1 2 50 P Art 3,280 A 2.00% 4 5,421 B 21,293 B 100 Widen to 4 Lane Phr/SJ/Co $ 4,262,500 $ 4,390,375 $ - $ - $ - $ - $ - $ - 4.39 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.39 15 23 0 0 38
40
Off Oxford (Hobbs) Ware Rd FM 1926 (Depot Rd) HC-158 OMU 7 0.9 4 40 COLL 0 NA 0.00% 4 9,491 F 4,019 A 80 Construct New 4 Lane McAllen $ 1,237,500 $ 1,274,625 $ - $ - $ - $ - $ - $ - 1.27 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.27 0 13 25 38
41
Off Schunior Ave MonMack Rd FM 2061 (McColl Rd) HC-164 City 7 0.5 2 50 None 25,220 F 2.00% 4 6,400 B 11,380 B 80 Widen to 4 Lane Edinburg $ 687,500 $ 708,125 $ - $ - $ - $ - $ - $ - 0.71 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.71 0 13 25 0 38
42
Off Schunior Ave FM 2061 (McColl Rd) Sugar Rd HC-165 OM 7 1 2 60 M Art 7,570 B 2.00% 4 10,800 F 15,537 E 80 Widen to 4 Lane Edinburg $ 1,375,000 $ 1,416,250 $ - $ - $ - $ - $ - $ - 1.42 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.42 15 13 5 5 38
43
On Mile 3/Buddy Owens FM 2221 FM 492 HC-141 LRP 7 6 2 40 COL 1,300 A 5.00% 4 12,052 F 7,737 B 120 Widen to 4 Lane County TXDOT $ 4,125,000 $ 4,248,750 $ - $ - $ - $ - $
- $ - 4.25 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.25 0 17 0 20 37
44
Off Mile 6 W Rd SH 107 Mile 11 N HC-147 OM 7 5.5 2 50 Coll/None 3,680 B 2.00% 4 8,114 C 3,632 A 100 Widen to 4 Lane Wesl/Co Wes-Pr. $ 7,562,500 $ 7,789,375 $ - $ - $ - $ - $ - $ - 7.79 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.79 15 6 5 10 36
Off Schunior Ave Sugar Rd Closner Blevd HC-166 City 7 1 2 50 M Art 11,840 F 2.00% 4 15,961 F 20,416 E 80 Widen to 4 Lane Edinburg $ 1,375,000 $ 1,416,250 $ - $ - $ - $ - $ - $ - 1.42 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.42 0 6 25 5 36
Revised Estimate TIP 05'06
45
46
Off Border Ave 18th St Bus 83 HC-92 OMU 7 1.4 2 50 Coll 7,020 C 2.00% 4 5,867 B 7,746 B 80 Widen to 4 Lane Weslaco $ 1,925,000 $ 1,982,750 $ - $ - $ - $ - $ - $ - 1.98 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.98 25 0 10 0 35
47
Off Jackson Rd Schunior St SH 107 HC-131 OM 7 0.5 2 60 M Art 5,980 B 2.00% 4 7,269 B 6,604 A 100 Widen to 4 Lanes Edinburg $ 687,500 $ 708,125 $ - $ - $ - $ - $ - $ - 0.71 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.71 25 0 5 5 35
48
Off Mile 6 N/ 18th St FM 88 Mile 2 W HC-146 OMU 7 3.2 2 50
M Art/No
ne7,840 C 3.20% 4 8,600 D 6,801 B 80 Widen to 4 Lane Wesl/Mer $ 4,400,000 $ 4,532,000 $ - $ - $ - $ - $ - $ - 4.53 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.53 15 0 10 10 35
Printed 11/3/2008 11:23 AMUpdated: 02/23/06
380
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- DD
7-M
etro
Mob
ility
11-D
ist D
isc
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(L
ocal
, Bon
d, e
tc)
Spec
ial S
tudy
Tra
nsit
- FT
A 5
307
Tra
nsit
- Sta
te 5
307
Tra
nsit
- Loc
al
TO
TA
L
Spri
ng F
Y 0
4 Sp
ring
C
MS
Fore
cast
Cos
t Eff
Bas
e Y
r L
OS
Fore
case
LO
S
TO
TA
L S
CO
RE
Proposed Project Data Funding Information (in million $) & Financial ConstraintExisting Roadway Data Forecast Roadway Data Project Score
From To
Special Study- Further study needed to analyze Projects out of financial constraint because of cost inflation
Lin
e N
umbe
rs
Syst
em S
ort
* - Projects reranked per DC group Based upon 2030 Traffic Volumes
Sour
ce o
f Pro
ject
New
Fin
anci
al C
ateg
ory
Roa
dway
49
On SP 433 (Main St-Donna) US 83 Bus 83 HC-169 OM 11 0.8 2 60 M Art 11,340 F 0.00% 4 8,351 C 8,963 A 100 Widen to 4 Lane Divided Donna Donna Pr. $ 1,360,000 $ 1,400,800 0.68 $ - $ - $ - $ - $ - 1.40 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.08 0 0 25 10 35
50
Off Tower Rd Bus 83 Ridge Rd HC-175 OMU 7 1.3 2 60 Coll 7,410 C 2.00% 4 9,716 E 11,167 C 100 Widen to 4 Lane Alamo $ 1,787,500 $ 1,841,125 $ - $ - $ - $ - $ - $ - 1.84 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.84 15 0 10 10 35
92
Off Mile 6 N (Mercedes)
FM 491 E to Mile 1 East Mile 1 East HC-78 OM 11 0.5 2 COLL 1,560 A 2.00% 4 15,307 E 9,004 B Widen to 4 Lane Mercedes $ 687,500 $ 708,125 $ - $ - $ - $ - $ - $ - 0.71 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.71 0 13 0 20 33
93
Off Trenton Rd US 281 FM 1423 HC-177 OM 7 5.8 2 50 MART 5,130 C 5.00% 4 8,611 E 16,904 E 120 Construct 4 Lane County Coun-Pr $ 7,975,000 $ 8,214,250 $ - $ - $ - $ - $ - $ - 8.21 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 8.21 5 17 10 0 32
94
Off 2 Mile Line N Rd SH 364 (La Homa Rd) SH 107 HC-80 City 7 2.5 2 52.5 COLL 3,550 B 2.00% 4 14,335 F 10,184 B 100 Widen to 4 Lane Mission $ 3,437,500 $ 3,540,625 $ - $ - $ - $ - $ - $ - 3.54 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.54 0 6 5 20 31
95
Off Colbath Ave FM 2220 Taylor Rd HC-101 OM 7 1 2 40 COLL 5,070 C 0.00% 4 4,187 B 15,671 E 80 Widen to 4 Lane McAllen $ 1,375,000 $ 1,416,250 $ - $ - $ - $ - $ - $ - 1.42 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.42 0 21 10 0 31
96
Off Inspiration Rd US 83 Military Hwy HC-128 OMU 7 3.1 2 40 PART 4,380 C 0.00% 4 11,522 E 8,538 B 100 Widen to 4 Lane Mission $ 4,262,500 $ 4,390,375 $ - $ - $ - $ - $ - $ - 4.39 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.39 0 6 10 15 31
97
Off Mile 5 N Rd Taylor Rd Ware Rd HC-144 OM 11 1 2 80 Coll 6,400 B 0.00% 4 17,158 F 21,904 E 120 Widen to 4 Lane Divided McAllen $ 1,700,000 $ 1,751,000 $ - $ - $ - $ - $ - $ - 1.75 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.75 15 6 5 5 31
98
Off Military Hwy FM 494 FM 1427 (Abram) HC-149 OM 7 6 4 0 MART 733 A 0.00% 4 0 F 5,039 A 100 Construct 4 Lane Mission $ 10,200,000 $ 10,506,000 $ - $ - $ - $ - $ - $ - 10.51 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 10.51 0 6 0 25 31
99
Off Bryan Rd FM 676 (Mi 5 N) Bus 83 HC-94 OM 7 4 2 40 COLL 10,590 E 2.00% 4 4,050 B 6,383 A 100 Widen to 4 Lane DividedAlton/Palmhurst/Mi
ssionTXDOT $ 6,800,000 $ 7,004,000 $ - $ - $ - $ - $
- $ - 7.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.00 5 0 20 5 30
100
Off Sugar Rd FM 1925 Schunior Ave HC-172 OM 7 0.7 2 50M
Art/None
4,970 C 2.00% 4 8,015 D 10,234 C 100 Widen to 4 Lane County $ 962,500 $ 991,375 $ - $ - $ - $ - $ - $ - 0.99 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.99 15 0 10 5 30
101
Off Sugar Rd Trenton Rd Sioux Rd HC-173 OM 7 3.1 2 80M
Art/None
6,440 B 2.00% 4 8,511 D 22,476 E 100 Widen to 4 Lane Edb/Phr/Co $ 4,262,500 $ 4,390,375 $ - $ - $ - $ - $ - $ - 4.39 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.39 5 23 5 5 28
Off Delta Blvd US 83 Mile 9 N Rd HC-226 OM 7 1.8 4 100 MART 0 NA 15.00% 4 8,273 E 16,718 C 100 Construct 4 Lane Weslaco $ 3,060,000 $ 3,151,800 $ - $ - $ - $ - $ - $ - 3.15 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.15 0 17 10 27
102
103
Off S McColl Rd Dicker Rd Orange Wood HC-162 City 7 2.5 NA NA COLL 0 NA 0.00% 2 8,342 E 4,036 C 80 Construct new 2Lane Pharr $ 1,718,750 $ 1,770,313 $ - $ - $ - $ - $ - $ - 1.77 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.77 17 10 27
104
Off Victoria Rd Mile 10 N Rd US 83 HC-179 City 7 0.6 2 50 COLL 3,800 C 2.00% 4 5,531 B 12,516 D 100 Widen to 4 Lane Co/Don $ 825,000 $ 849,750 $ - $ - $ - $ - $ - $ - 0.85 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.85 0 17 10 0 27
105
Off Nebraska Ave (Alamo) Cesar Chavez Border Ave HC-151 OMU 7 2.5 2 60 COLL 1,750 B 0.00% 4 8,137 C 19,150 E 80 Widen to 4 Lane Alamo $ 3,437,500 $ 3,540,625 $ - $ - $ - $ - $ - $ - 3.54 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.54 0 21 5 0 26
106
On Bus 83 US 83 (E side) East to US 83 (W side) HC-97 TIP 7 5.1 2 60 M Art 17,250 F 5.00% 4 26,150 F 23,081 F 100 Widen to 4 Lane Divided 0039-02-043, 049, 057
Mi/Plmv/Co $ 9,875,000 $ 10,171,250 5.09 $ - $ - $ - $ - $ - 5.09 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 10.17 0 0 25 0 25
107
Off Daffodil Ave Taylor Rd FM 2220 (Ware Rd) HC-102 City 7 1.5 2 60 Coll 4,000 B 2.00% 4 13,069 F 11,320 B 100 Widen to 4 Lane McAllen/Mission $ 2,062,500 $ 2,124,375 $ - $ - $ - $ - $ - $ - 2.12 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.12 0 0 5 20 25
108
Off Dove(Owassa) FM 2061 (McColl Rd) US 281 HC-106 OM 7 1.7 2 40 M Art 4,410 B 2.00% 4 7,444 C 9,245 B 100 Widen to 4 Lane Mcallen/Pharr $ 2,337,500 $ 2,407,625 $ - $ - $ - $ - $ - $ - 2.41 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.41 15 0 5 5 25
109
On FM 493 US 281 Proposed Donna Int'l Bridge HC-116 OM 11 1.5 4 0 m Art 0 NA 20.00% 4 9,689 F 7,730 A 120 Construct 4 Lane Connection to
Proposed International Bridge Donna Donna Pr. $ 2,812,500 $ 2,896,875 $ - $ - $ - $ - $ - $ - 2.90 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.90 0 0 25 25
110
On FM 676 FM 492 (Abram Rd) SH 364 (La Homa Rd) HC-117a TMP 7 2.41 2 40 RMC 6,210 C 2.00% 4 17,306 F 23,658 F 120Widen to 4 Lane Rev TIP 05'06 Revised Estimate
Alton/County $ 8,250,000 $ 8,250,000 4.13 $ - $ - $ - $ - $ - 4.13 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 8.25 15 0 10 0 25
On FM 676 SH 364 (La Homa Rd) to SH 107 HC-117a TMP 7 2.39 2 40 RMC 6,210 C 2.00% 4 17,306 F 23,658 F 120 Widen to 4 Lane Alton/Cou
nty $ 8,217,140 4.11 $ - $ - $ - $ - $ - 4.11 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 8.22 15 0 10 0 25111
y
112
Off Goodman Rd US 83 FM 2221 HC-121 OMU 7 8 2 60 COLL 7,280 D 2.00% 4 11,946 E 11,362 C 120 Widen to 4 Lane County $ 11,000,000 $ 11,330,000 $ - $ - $ - $ - $ - $ - 11.33 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 11.33 0 0 15 10 25
113
Off Jackson Rd Russell Rd Schunior St HC-133 TMP 7 1 2 Coll 3,120 B 2.00% 4 7,786 D 7,573 B Widen to 4 Lane Edinburg $ 1,375,000 $ 1,416,250 $ - $ - $ - $ - $ - $ - 1.42 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.42 10 0 5 10 25
Printed 11/3/2008 11:23 AMUpdated: 02/23/06
381
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- DD
7-M
etro
Mob
ility
11-D
ist D
isc
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(L
ocal
, Bon
d, e
tc)
Spec
ial S
tudy
Tra
nsit
- FT
A 5
307
Tra
nsit
- Sta
te 5
307
Tra
nsit
- Loc
al
TO
TA
L
Spri
ng F
Y 0
4 Sp
ring
C
MS
Fore
cast
Cos
t Eff
Bas
e Y
r L
OS
Fore
case
LO
S
TO
TA
L S
CO
RE
Proposed Project Data Funding Information (in million $) & Financial ConstraintExisting Roadway Data Forecast Roadway Data Project Score
From To
Special Study- Further study needed to analyze Projects out of financial constraint because of cost inflation
Lin
e N
umbe
rs
Syst
em S
ort
* - Projects reranked per DC group Based upon 2030 Traffic Volumes
Sour
ce o
f Pro
ject
New
Fin
anci
al C
ateg
ory
Roa
dway
114
Off Sioux Rd (La Vista Ave) FM 2061 (McColl Rd) US 281 HC-168 OM 7 1.8 2 40 M Art 1,260 A 5.00% 4 19,757 F 19,800 F 80 Widen to 4 Lane McA/Phr/
Co $ 2,475,000 $ 2,549,250 $ - $ - $ - $ - $ - $ - 2.55 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.55 25 0 0 0 25
115
Off Sprague Ave Bus 281 SH 336 (N 10th St) HC-170 City 7 3 2 40 COLL 7,790 C 0.00% 4 9,934 E 10,486 B 80 Widen to 4 Lane Edinburg $ 4,125,000 $ 4,248,750 $ - $ - $ - $ - $ - $ - 4.25 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.25 0 0 10 15 25
116
On US 83 FM 1427 0.25Mi W of FM 2221 HC-178a TXD
OT 11 3 4 300 EXP 40,990 F 10.00% 6 43,457 F 44,808 F 350 Wided to 6lanes TXDOT $ 3,500,000 $ 3,605,000 3.61 $ 3.61 0 0 25 0 25
117
On US 83 0.5 Mi E of Bus 83 FM 1427 HC-178b TXDOT 11 1 4 300 EXP 41,170 F 10.00% 6 43,031 F 43,837 F 350 Widen to 6lanes TXDOT $ 1,500,000 $ 1,545,000 1.55 $ 1.55 0 0 25 0 25
118
Off Alberta Rd US 281 FM 1423 HC-86 County 7 5.6 2 40 COLL 1,970 A 2.00% 4 5,999 C 1,271 A 80 Widen to 4 Lane County $ 7,700,000 $ 7,931,000 $ - $ - $ - $ - $ - $ - 7.93 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.93 0 13 0 10 23
119
Off Bentsen Palm Drive 1 Mile Line Rd US 83 HC-88 OMU 7 0.2 2 60 COLL 7,280 C 0.00% 4 13,092 F 20,156 F 100 Widen to 4 Lane Palmview $ 275,000 $ 283,250 $ - $ - $ - $ - $ - $ - 0.28 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.28 0 13 10 0 23
120
Off Nolana Loop FM 493 FM 88 HC-154 OM 7 5.5 2 0 MART 0 NA 2.00% 4 0 A 18,265 E 120 Construct New 4 Lane County $ 7,562,500 $ 7,789,375 $ - $ - $ - $ - $ - $ - 7.79 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.79 0 23 0 23
121
Off Hall Acres 2nd St (McAllen) US 281 HC-123 OM 7 2.4 2 60 COLL 6,830 B 5.00% 4 11,560 F 19,227 F 80 Widen to 4 Lane McA/Phr $ 3,300,000 $ 3,399,000 $ - $ - $ - $ - $ - $ - 3.40 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.40 0 17 5 0 22
122
Off Wichita Ave SH 336 (S 10th St) 2nd St HC-181 City 7 0.6 2 50 COLL 6,620 B 0.00% 4 5,327 B 13,989 F 80 Widen to 4 Lane McAllen $ 825,000 $ 849,750 $ - $ - $ - $ - $ - $ - 0.85 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.85 0 17 5 0 22
123
Off 2 Mile Line N Rd Ware Rd FM 1926 (23rd St) HC-81 TMP 7 1 2 52.5 COLL 6,100 B 2.00% 4 16,229 E 12,843 C 100 Widen to 4 Lane McAllen $ 1,375,000 $ 1,416,250 $ - $ - $ - $ - $ - $ - 1.42 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.42 0 6 5 10 21
124
Off Abram Rd Bus 83 FM 2221 HC-84 OMU 11 7 2 40 COLL 1,950 A 0.00% 4 11,511 E 24,200 F 80 Widen to 4 Lane Plmv/Co Count Pr. $ 9,625,000 $ 9,913,750 $ - $ - $ - $ - $ - $ - 9.91 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9.91 0 21 0 0 21
125
Off Alberta Rd McColl Rd Bus 281 HC-87 City 7 1.85 2 60 M Art 2,660 A 2.00% 4 16,369 F 12,994 C 80 Widen to 4 Lane Edinburg $ 2,543,750 $ 2,620,063 $ - $ - $ - $ - $ - $ - 2.62 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.62 0 6 0 15 21
126
Off Cesar Chavez FM 2128 Sioux Rd HC-100 OMU 7 6.3 2 60 COLL 6,330 C 2.00% 4 7,214 D 11,518 C 100 Widen to 4 Lane County $ 8,662,500 $ 8,922,375 $ - $ - $ - $ - $ - $ - 8.92 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 8.92 0 6 10 5 21
127
Off Freddy Gonzalez FM 2061 SH 336 (N 10th St) HC-120 OMU 7 1 2 60 M Art 6,120 B 2.00% 4 8,486 D 12,178 B 100 Widen to 4 Lane Edinburg $ 1,375,000 $ 1,416,250 $ - $ - $ - $ - $ - $ - 1.42 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.42 0 6 5 10 21
128
Off Hall Acres US 281 FM 907 HC-124 OM 7 3.8 2 100 M Art 1,150 A 0.00% 4 5,854 B 16,384 E 100 Widen to 4 Lane Phr/SJ $ 5,225,000 $ 5,381,750 $ - $ - $ - $ - $ - $ - 5.38 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5.38 0 21 0 0 21
129
Off Los Ebanos Rd FM1924(3MI-BuddyOwens) Bus 83 HC-135 City 7 3 2 50 COLL 4,960 C 0.00% 4 7,335 B 3,441 A 80 Widen to 4 Lane
Palmhurst/Mission/C
ounty $ 4,125,000 $ 4,248,750 $ - $ - $ - $ - $ - $ - 4.25 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.25 0 6 10 5 21
130
Off Mile 1 East Mile 11 North US 83 HC-136 OMU 7 1.3 2 45 COLL 1,360 A 2.00% 4 23,129 F 36,582 F 100 Improve widen to 4 Lane Mercedes $ 1,750,000 $ 1,802,500 $ - $ - $ - $ - $ - $ - 1.80 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.80 0 21 0 0 21
131
Off 2 Mile Line N Rd* SH 107 Taylor Rd HC-82 OM 7 3 2 52.5 COLL 4,370 C 2.00% 4 12,322 E 13,072 C 100 Widen to 4 Lane Mission Mis-Pr. $ 4,000,000 $ 4,120,000 $ - $ - $ - $ - $ - $ - 4.12 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.12 0 0 10 10 20
132
Off Inspiration Rd 2 Mile Line Rd US 83 HC-129 City 7 2 2 40 Coll 4,420 C 2.00% 4 8,992 D 9,962 B 100 Widen to 4 Lane Mission $ 2,750,000 $ 2,832,500 $ - $ - $ - $ - $ - $ - 2.83 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.83 0 0 10 10 20
133
Off Jackson Rd FM 1925 Russell Rd HC-132 City 7 2 2 1,970 A 2.00% 4 6,452 C 4,639 A 120 Widen to 4 Lane Edinburg $ 3,750,000 $ 3,862,500 $ - $ - $ - $ - $ - $ - 3.86 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.86 10 0 0 10 20
134
Off Kennedy Ave Taylor Rd FM 2220 (Ware Rd) HC-134 OMU 7 1 2 0 COLL 0 NA 0.00% 4 7,594 F 7,604 B 80 Construct New 4 Lane McAllen $ 1,375,000 $ 1,416,250 $ - $ - $ - $ - $ - $ - 1.42 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.42 0 0 20 20
135
Off Mile 17 N Rd Mile 6 West FM 491 HC-139 County 7 5 2 40 COLL 4,440 C 2.00% 4 6,388 D 6,481 B 80 Widen to 4 Lane County $ 6,875,000 $ 7,081,250 $ - $ - $ - $ - $ - $ - 7.08 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.08 0 0 10 10 20
136
Off Mile 4 1/2 West Rd SH 107 Mile 9 North Rd HC-142 OMU 7 7.5 2 40 COLL 2,800 B 0.00% 4 6,549 C 4,888 A 100 Widen to 4 Lane County $ 10,250,000 $ 10,557,500 $ - $ - $ - $ - $ - $ - 10.56 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 10.56 5 0 5 10 20
137
Off Mile 6 1/2 W Rd Mile 12 North Mile 5 N Rd HC-145 Coun
ty 7 7 2 40 COLL 3,220 B 0.00% 4 10,878 E 8,654 B 80 Widen to 4 Lane Wesl/Co $ 9,625,000 $ 9,913,750 $ - $ - $ - $ - $ - $ - 9.91 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9.91 0 0 5 15 20
Printed 11/3/2008 11:23 AMUpdated: 02/23/06
382
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- DD
7-M
etro
Mob
ility
11-D
ist D
isc
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(L
ocal
, Bon
d, e
tc)
Spec
ial S
tudy
Tra
nsit
- FT
A 5
307
Tra
nsit
- Sta
te 5
307
Tra
nsit
- Loc
al
TO
TA
L
Spri
ng F
Y 0
4 Sp
ring
C
MS
Fore
cast
Cos
t Eff
Bas
e Y
r L
OS
Fore
case
LO
S
TO
TA
L S
CO
RE
Proposed Project Data Funding Information (in million $) & Financial ConstraintExisting Roadway Data Forecast Roadway Data Project Score
From To
Special Study- Further study needed to analyze Projects out of financial constraint because of cost inflation
Lin
e N
umbe
rs
Syst
em S
ort
* - Projects reranked per DC group Based upon 2030 Traffic Volumes
Sour
ce o
f Pro
ject
New
Fin
anci
al C
ateg
ory
Roa
dway
138
Off Moore Field Rd * FM 2221 US 83 HC-150 OMU 7 6.5 2 50 COLL 3,780 C 0.00% 4 10,535 E 11,878 C 80 Widen to 4 Lane County $ 8,937,500 $ 9,205,625 $ - $ - $ - $ - $ - $ - 9.21 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9.21 0 0 10 10 20
139
Off Nolana (Earling Rd) FM 1426 FM 493 HC-152 OM 7 7.6 2 40 None 390 A 1.00% 4 5,808 C 8,504 B 120 Widen to 4 Lane Divided County Count Pr. $ 14,250,000 $ 14,677,500 $ - $ - $ - $ - $ - $ - 14.68 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 14.68 15 0 0 5 20
140
Off Trenton Rd (Mile 13 1/2) FM 1423 FM 1015 HC-178 OM 7 7.5 2 40 COLL 0 NA 2.00% 4 6519 E 5,879 A 120 Construct New 4 Lane Divided County $ 14,000,000 $ 14,420,000 $ - $ - $ - $ - $ - $ - 14.42 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 14.42 0 0 20 20
141
Off Mile 11 N Rd Mile 6 West FM 491 HC-137 County 7 6 2 50 COLL 2,360 B 0.00% 4 3,901 C 9,228 C 100 Widen to 4 Lane County $ 8,250,000 $ 8,497,500 $ - $ - $ - $ - $ - $ - 8.50 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 8.50 0 13 5 0 18
142
Off I Rd Rancho Blanco US 281 (Military Hwy) HC-127 OM 7 4.5 2 40 COLL 830 A 5.00% 2 6,605 D 10,039 D 100 Construct 2 Lane w/ Shoulders Phr/Co/SJ $ 3,000,000 $ 3,090,000 $ - $ - $ - $ - $ - $ - 3.09 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.09 0 17 0 0 17
143
OffRoosevelt (Mile 12 1/2 N rd)
FM 1423 FM 88 HC-160 County 7 5.3 2 55 COLL 2,490 B 0.00% 4 10,185 C 6,826 B 100 Widen to 4 Lane County $ 7,287,500 $ 7,506,125 $ - $ - $ - $ - $ - $ - 7.51 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7.51 0 6 5 5 16
144
Off 10th St Ext FM 1925 SH 107 HC-79 OM 7 2.5 2 Var COLL 0 NA 0.00% 4 5,836 E 7,572 B NA Construct New 4 Lane Edinburg/County Count Pr. $ 4,250,000 $ 4,377,500 $ - $ - $ - $ - $ - $ - 4.38 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.38 0 0 15 15
145
OnFM 2061 (McColl Rd) 1939-01-046 Jan '06
FM 1925 SH 107 HC-112 TIP 7 2.5 2 80 M Art 8,780 C 4.50% 4 21,410 F 22,514 E 120Widen to 4 Lane Divided 1939-01-046 Jan'06
McA/Edb/Co
$ 4,687,500 $ 5,307,360 $ 5,307,360 1.88 $ - $ - $ - $ - $ - 3.43 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 5.31 5 0 10 0 15
146
Off Mile 12 N Rd Mile 6 West FM 1015 HC-138 County 7 3 2 45 COLL 2,790 B 0.00% 4 8,979 D 6,633 B 80 Widen to 4 Lane County $ 4,125,000 $ 4,248,750 $ - $ - $ - $ - $ - $ - 4.25 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.25 0 0 5 10 15
147
OffViolet Ave/Minnessota *
FM 2061 (McColl Rd) US 281 HC-180 City 7 2 2 50 COLL 1,520 A 0.00% 4 5,873 B 11,322 B 80 Widen to 4 Lane McAllen $ 2,750,000 $ 2,832,500 $ - $ - $ - $ - $ - $ - 2.83 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.83 0 13 0 0 13
148
Off Doolittle Rd * FM 1925 FM 2812 HC-227 City 7 2 2 45 None 4,880 C 2.00% 4 6,342 B 8,805 B 100 Widen to 4 Lane Divided w/ Br Edb/Co $ 3,400,000 $ 3,502,000 $ - $ - $ - $ - $ - $ - 3.50 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.50 $0 0 10 0 10
149
OnFM 492 0862-01-039 Aug '06
FM 1924 E 0.4 Mi West on FM 492 HC-114 TIP 11 0.4 2 9,130 B 2.00% 4 11,663 F 12,532 A
Construct 4 Lane Divided Rev TIP 05'06 Revised Estimate - Rev TIP Estimate 12'06
TXDOT $ 1,400,000 $ 1,400,000 0.70 0.70 $ 1.40 0 5 5 10
150
Off Tower Rd SH 107 US 83 HC-176 OMU 7 4.5 2 60 COLL 1,140 A 2.00% 4 6,737 C 9,460 B 100 Widen to 4 Lane Alamo $ 6,187,500 $ 6,373,125 $ - $ - $ - $ - $ - $ - 6.37 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 6.37 5 0 0 5 10
Revised Estimate TIP 05'06
151
Off Owassa Rd * Cesar Chavez FM 1423 HC-157 OMU 7 3 2 50 COLL 830 A 2.00% 4 7,801 C 9,245 B 100 Widen to 4 Lane County $ 4,000,000 $ 4,120,000 $ - $ - $ - $ - $ - $ - 4.12 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 4.12 0 0 0 5 5
152
Off Russell Rd * Doolittle FM 907 HC-161 City 7 1.5 2 50 COLL 1,630 A 0.00% 4 9,921 D 9,783 C 80 Widen to 4 Lane County $ 2,000,000 $ 2,060,000 $ - $ - $ - $ - $ - $ - 2.06 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2.06 0 0 0 5 5
218
Off Wisconsin Rd * .25 miles E of 2nd St US 281 HC-182 OMU 7 2.9 2 50 Coll 1,210 A 0.00% 4 16,108 E 16,106 E 80 Widen to 4 Lane Edinburg $ 3,850,000 $ 3,965,500 $ - $ - $ - $ - $ - $ - 3.97 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 3.97 0 0 0 0 0
219
OnFM 1925 (North Arterial)
US 281 Bus 281 Rev Aug '05
Kenyon HC-105 TIP 7,81.9 2.5 Rev Aug
2 80 Col 12,520 F 4.30% 4 16,416 F 18,563 D 120Widen to 4 Lane Divided Urb 1803-02-022 & 1803-02-019 Edinburg Edn.Pr. $ 3,396,117 $ - $ - $ - $ - $ - $ - - $ - $ - $ - $ - $ - $ - $ - $ - $ -
220
On FM 676 FM 492 (Abram Rd) Taylor Rd HC-117 TMP 7 7.8 2 40 RMC 6,210 C 2.00% 4 17,306 F 23,658 F 120 Widen to 4 Lane Alton/County $ 14,625,000 $ 15,063,750 7.31 $ - $ - $ - $ - $ - 15.06 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 22.38 15 13 10 0
221
Off Nolana Loop FM 2220 (Ware Rd) FM 2061 (McColl Rd) HC-155a 7 3 4 P Art 33,540 F 1.00% 6 48,500 F 48,756 F
Widen to 6 Lane Added only a portion to TIP See next Project ,Rev TIP 11'05, changed limits & cost
TXDOT TXDOT $ 6,130,000 $ 6,313,900 $ - $ - $ - $ - $ - $ - 6.31 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 6.31 25 0 25 0
219
On SH 364 FM 1924 FM 676 HC-182a 11 Construct 4 Lane Divided Urban Rev 5'07 2966-01-011
$ 11,700,000 11.70 $ 11.70
220
SH 107 US 281 East East of FM 493 HC-227 11 Construct 6 lane Divided Rual REV 9/07 0342-01-074
$ 11,400,000 11.40 $ 11,400,000.00
A difference of $ 447,931,117 $ 527,788,726
8- SAFCATEGORY-8: SAFETY $ 79,857,609
1
On FM 495 FM 1926 2nd St HC-185 OM 8 1.6 4 80 P Art 21,630 F 5.00% 4 47,263 40,743 F 80 Add Left Turn Lanes McAllen $ 2,000,000 $ - $ - $ - $ - $ - $ - $ - 2.00 $ - $ - $ - $ - $ - $ - $ - $ - $ 2.00 25 17 25 0 67
2
On SP 115 (S 23rd St) Bus 83 S US 83 HC-189 OM 8 1 4 60 P Art 24,770 F 3.10% 4 27,800 35,136 F 150 Add Left Turn Lane McAllen $ 1,500,000 $ - $ - $ - $ - $ - $ - $ - 1.50 $ - $ - $ - $ - $ - $ - $ - $ - $ 1.50 25 17 25 0 67
3
On FM 1926 (23rd St) SH 495 Bus 83 HC-184 TIP 8 0.9 4 60 P Art 30,890 F 0.25% 4 32,958 29,184 F 120 Add Left Turn Lanes McAllen $ 1,000,000 $ - $ - $ - $ - $ - $ - $ - 1.00 $ - $ - $ - $ - $ - $ - $ - $ - $ 1.00 25 13 25 0 63
4
On SH 336 (S 10th St) SH 495 S Houston St HC-188 OM 8 1.5 4 60 P Art 26,080 F 0.00% 4 28,896 F 30,781 F 80 Add Left Turn Lanes McAllen $ 2,550,000 $ - $ - $ - $ - $ - $ - $ - 2.55 $ - $ - $ - $ - $ - $ - $ - $ - $ 2.55 15 0 25 0 40
5
Off Mile 10 N Rd FM 493 Mile 2 W HC-186 County 8 5.9 2 47.5 COLL 3,670 B 5.00% 4 10,423 9,303 B 100 Horizontal & Vertical Curves
and add 2 travel lanes County $ 7,612,500 $ - $ - $ - $ - $ - $ - $ - 7.61 $ - $ - $ - $ - $ - $ - $ - $ - $ 7.61 0 0 5 20 25
6
Off Mile 6 N Rd Inspiration Rd FM 1926 (N 23rd St) HC-187 OMU 8 6.4 2 40 COLL 1,930 A 2.00% 4 7,479 7,937 B 100 Realign 4 Lane McA/Co $ 8,300,000 $ - $ - $ - $ - $ - $ - $ - 8.30 $ - $ - $ - $ - $ - $ - $ - $ - $ 8.30 0 0 0 20 20
221
LS Lump Sum Various Various HC-183 LS 8 Various Safety Improvements Various $ 8,790,000 $ - $ - $ - $ - $ - $ - $ - 8.79 $ - $ - $ - $ - $ - $ - $ - $ - $ 8.79
$ 31,752,500
228
LS Lump Sum Various Various HC-190 LS 9 Various Transportation Enhancements Various $ 30,000,000 $ - $ - $ - $ - $ - $ - $ - $ - 30.00 $ - $ - $ - $ - $ - $ - $ - $ 30.00 0 0 0
229 $ 30,000,000
230 CATEGORY-10: MISCELLENEOUS
9-ENH
10- MIS
CATEGORY-9: ENHANCEMENTS
Printed 11/3/2008 11:23 AMUpdated: 02/23/06
383
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- DD
7-M
etro
Mob
ility
11-D
ist D
isc
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(L
ocal
, Bon
d, e
tc)
Spec
ial S
tudy
Tra
nsit
- FT
A 5
307
Tra
nsit
- Sta
te 5
307
Tra
nsit
- Loc
al
TO
TA
L
Spri
ng F
Y 0
4 Sp
ring
C
MS
Fore
cast
Cos
t Eff
Bas
e Y
r L
OS
Fore
case
LO
S
TO
TA
L S
CO
RE
Proposed Project Data Funding Information (in million $) & Financial ConstraintExisting Roadway Data Forecast Roadway Data Project Score
From To
Special Study- Further study needed to analyze Projects out of financial constraint because of cost inflation
Lin
e N
umbe
rs
Syst
em S
ort
* - Projects reranked per DC group Based upon 2030 Traffic Volumes
Sour
ce o
f Pro
ject
New
Fin
anci
al C
ateg
ory
Roa
dway
231
Off Mile 2 W Rd SH 107 Mile 12N HC-217 OM 10 4.5 2 40 COLL 4,690 C 2.00% 2 10,153 6,067 C 100Widen to 2 Lane Rural Rdwy 0921-02-090 LET May 2005
Mer/Co $ 1,724,403 $ - $ - $ - $ - $ - $ - $ - $ - $ - 1.50 $ - 0.23 $ - $ - $ - $ - $ 1.72 0 23 10 15 48
232
Off I Rd US 281 SH 495 HC-192 TIP 7 3 2 90 Coll 13,670 E 5.00% 4 15,208 F 17,403 D 120 Widen to 4 Lane Divided Edb/Phr/SJ/Co $ 4,100,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - 1.24 $ - 2.86 $ - $ - $ - $ - $ 4.10 15 0 20 10 45
233
SH 336 Near McAllen Miller International Airport HC-193 10 0.1 Relocation of 10th St. Near
McAllen Miller International $ 3,000,000 0.75 2.25 $ 3,000,000.00
234
FM 493 US 281 US 83 HC-194 10 7Widen to 4 lane divided & Construct Overpass @ US 281 REV 9/07 0863-01-047
$ 6,250,000 6.25 $ 6,250,000.00
235
Hid Int'l Br @ Hidalgo International Bridge HC-195 10 0 Construct SB Enforcement
Facility, Install Electronic Veh. $ 3,974,000 2.35 1.62 $ 3,974,000.00
236
Mi 6 W Mi 6 W from US 83 SH 107 HC-196 10 1.5 Reconstruction & Widen to 4 lns $ 8,000,000 3.50 4.50 $ 8,000,000.00
237
Nolana FM 1426 FM 88 (Nolana Loop) HC-197 10 9 Widen & Reconstruct to 4 ln, min. $ 17,000,000 2.00 15.00 $ 17,000,000.00
238
Mi 2 W Mile 12 N, South US 83_(Mile 2 West) HC-198 10 1.5 Reconstruct & Widen to 2 ln rdwy with shoulders $ 2,400,000 1.00 1.40 $ 2,400,000.00
239
Hid Co Loop New Location, SP 600/US 281 FM 1427 HC-199 10 12 Hidalgo County Loop $ 25,000,000 1.00 24.00 $ 25,000,000.00
240
Donna Rio Bravo Bridge FM 493 Rio Grande River
GSA Complex Rio Br HC-200 10,11 0.1 Donna/Rio Bravo International Bridge and Approaching $ 10,000,000 3.88 2.12 $ 10,000,000.00
241
Reg. Access MultiModal Center
FM 1016 & SP 115 HC-201 10 0.1Access to Regional MultiModal Center at FM 1016 & SP 115 0921-02-183
$ 3,200,000 $ 3,200,000 2.00 6.80 $ 2,560,000.00
242
McColl Rd On McColl, Mil Hwy 0.5 Mi S of Mil Hwy HC-203 10 0.5 Construct 4 ln Roadway $ 600,000 0.40 0.20 $ 600,000.00
Hid Co Loop Hidalgo County Loop @ VA locations Hid County Loop HC-204 10 0.0. Hidalgo County Loop $ 2,000,000,000 0.49 2.00 $ 2,000,000,000.00
243VA locations
244
US 83 Jackson/Bus 83 Taylor Rd HC-204a 10LCS
Landscape Improvements Rev 5'07 0039-17-157
$ 1,000,000 0.50 0.50 $ 1,000,000.00
245
BSIF Pharr/ Rey
Located in Vicinity of GSA Facility Pharr HC-228 10
Construction of One-Stop Border Inspection Facility REV 9/07 0921-02-173
$ 14,600,000 $ 14,600,000.00
246
US 281 At 'I' Road HC-229 10 CBI
Widen to 4 lane Divided Rural & Construct Overpass & 'I' Road REV 9/07 0220-01-023
$ 7,000,000 $ 7,000,000.00
247
Hid Int'l Bridge At Hid Int'l Bridge HC-230 10
CBIImprovements at Hidalgo Int'l Bridge REV 9/07 0921-02-909 $ 1,000,000 $ 1,000,000.00
248
Pharr Int'l Bridge
At Pharr/ Reynosa Int'l Bridge HC-231 10
CBI
Improvements at Pharr/ Reynosa Int'l Bridge REV 9/07 0921-02-911; 0921-02-193
$ 5,600,000 $ 6,850,000 $ 6,850,000.00
249
Progreso Int'l Bridge / Moore Rd
At Progeso Int'l Bridge HC-232 10 CBI
Improvments at Progresso Int'l Bridge REV 9/07 0921-02-191
$ 1,000,000 $ 1,000,000.00
250
Misc. Various HC-191 10Misc.- Landscape, RR Grade Crossing Impr, CBI-Non added capacity roadway, etc. REV 9/07
$ 5,000,000 $ 5,000,000.00
$ 2,120,448,403
1 Off Dove Ave Bentsen .25 Mi W of FM 2220 HC-214 City 13 0.25 4 0 MART
0 NA 2.00% 4 0 11,108 B 100 Construct New 4 Lane McAllen $ 425,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0.43 $ - $ - $ - $ - $ 0.43 0 17 20 37
CATEGORY-15: HIDALGO COUNTY LOOP REGIONALLY SIGNIFICANT PROJECTS
2
Off Bentsen Rd FM 1924 SH 495 HC-208 City 13 2 2 40 COLL 4,110 B 5.00% 4 9,105 3,784 A 80 Widen to 4 Lane McAllen $ 3,400,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 3.40 $ - $ - $ - $ - $ 3.40 0 6 5 25 36
3
Off Bentsen Rd Bus 83 US 83 HC-210 OMU 13 1 2 40 COLL 5,220 B 2.00% 4 5,317 9,455 B 80 Widen to 4 Lane McAllen $ 1,375,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 1.38 $ - $ - $ - $ - $ 1.38 0 6 5 20 31
4
Off Sarah Ave FM 2220 (Ware Rd) SP 115 (S 23rd ST) HC-219 City 13 0.4 2 50 COLL 3,160 B 0.00% 4 0 15,133 E 80 Widen to 4 Lane McAllen $ 680,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0.68 $ - $ - $ - $ - $ 0.68 0 21 5 5 31
5
Off Taylor Rd US 83 Augusta Ave HC-220 OM 13 2 4 40 COLL 2,018 A 2.00% 4 0 5,373 A 80 Construct New 4 Lane McAllen $ 3,400,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 3.40 $ - $ - $ - $ - $ 3.40 0 6 0 25 31
6
Off Bentsen Rd Edinburg Main Canal HC-209 OM 6 0.1 2 40 COLL 4,000 C 5.00% 4 7,424 8,642 B 80 Widen Bridge McA/Co $ 137,500 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0.14 $ - $ - $ - $ - $ 0.14 0 0 10 20 30
7
Off Bentsen Rd 8 Mile Line FM 1924 HC-211 OMU 13 5 2 50 COLL 2,280 B 2.00% 4 4,555 4,988 A 80 Widen to 4 Lane McA/Co $ 6,875,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 6.88 $ - $ - $ - $ - $ 6.88 0 0 5 25 30
8
Off Bentsen Rd SH 495 Bus 83 HC-212 OMU 13 1 2 40 COLL 5,220 C 2.00% 4 7,966 5,199 B 80 Widen to 4 lane Divided McAllen $ 1,700,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 1.70 $ - $ - $ - $ - $ 1.70 0 0 10 20 30
9
Off Mile 4 N Rd @ Edinburg Main Canal HC-218 OM 13 0.1 1 25 COLL 2,900 A 2.00% 4 6,178 10,379 B 100 Widen Bridge to 4 lanes McAllen $ 200,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0.20 $ - $ - $ - $ - $ 0.20 0 6 0 20 26
10
Off 29th Street (McAllen) Jordan Ave Covina Ave HC-206 OMU 13 0.8 2 0 COL 0 NA 2.00% 4 0 1,477 A 80 Construct new 4 lane McAllen $ 1,100,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 1.10 $ - $ - $ - $ - $ 1.10 0 0 25 25
11
Off 29th Street (McAllen) SH 107 Mile 6 N Rd (Oxford-
Hobbs) HC-207 OMU 13 1.5 4 40 COLL 430 A 0.00% 4 0 55 A 80 Widen to 4 Lane McAllen $ 2,550,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 2.55 $ - $ - $ - $ - $ 2.55 0 0 0 25 25Printed 11/3/2008 11:23 AMUpdated: 02/23/06
384
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- DD
7-M
etro
Mob
ility
11-D
ist D
isc
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(L
ocal
, Bon
d, e
tc)
Spec
ial S
tudy
Tra
nsit
- FT
A 5
307
Tra
nsit
- Sta
te 5
307
Tra
nsit
- Loc
al
TO
TA
L
Spri
ng F
Y 0
4 Sp
ring
C
MS
Fore
cast
Cos
t Eff
Bas
e Y
r L
OS
Fore
case
LO
S
TO
TA
L S
CO
RE
Proposed Project Data Funding Information (in million $) & Financial ConstraintExisting Roadway Data Forecast Roadway Data Project Score
From To
Special Study- Further study needed to analyze Projects out of financial constraint because of cost inflation
Lin
e N
umbe
rs
Syst
em S
ort
* - Projects reranked per DC group Based upon 2030 Traffic Volumes
Sour
ce o
f Pro
ject
New
Fin
anci
al C
ateg
ory
Roa
dway
12
Off Daffodil Ave @ Edinburg Main Canal HC-213 OM 13 0.1 2 60 Coll 6,550 B 2.00% 4 9,181 9,849 B 100 Widen Bridge McAllen $ 400,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0.40 $ - $ - $ - $ - $ 0.40 0 0 5 20 25
13
Off Lark Ave (4 Mile Line) Taylor Rd 29th St - McAllen HC-216 City 13 1.5 2 50 Coll 3,133 B 2.00% 4 10,220 10,036 B 100 Widen to 4 Lane McAllen $ 2,550,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 2.55 $ - $ - $ - $ - $ 2.55 0 0 5 20 25
14
Off I Rd Ridge Rd Rancho Blanco HC-215 OM 13 1.6 2 40 COLL 2,680 A 5.00% 4 8,502 11,008 B 100 Widen to 4 Lane Phr/Co/SJ $ 2,200,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 2.20 $ - $ - $ - $ - $ 2.20 0 0 0 20 20
15
Off Martin Avenue 6th Street 10th Street HC-233 City 13 0.25 2 40 COLL 3,370 A 2.00% 4 7,966 7,216 B 80 Widen to 4 Lane McAllen $ 343,750 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0.34 $ - $ - $ - $ - $ 0.34 0 0 0 20 20
251
Off Hidalgo County Loop Various Various HC-205 RMA
Construct New Hidalgo County Loop: Phase I = 2 lane Rural & Phase II = 4 lane Control'd Access
$ 2,000,000,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 2,000.00 $ - $ - $ - $ - $ 2,000.00
$ 2,027,336,250
267
No Projects No Projects No Projects 4 No Projects No Projects - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
-
268
On Transit Operations & Maintenance HC-222 OM 14 NA 0.00% 0 NA Transit Program - Operations Various $ 17,579,200 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 9.28 2.32 $ 11.60 0 25 0 0 25
269
On Transit Capital HC-223 OM 14 NA 0.00% 0 NA Transit Program - Capital Various $ 11,604,025 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 5.90 11.90 $ 17.80 0 25 0 0 25
$ 29,183,225 $ 5,587,851,014 $ 5,587,851,014 245.41 915.53 - - 19.03 510.22 38.28 30.00 32.00 25.00 2,202.01 - 9.28 5.90 14.25 4,046.92
NOTE: Off System Projects require a 20% match from the locl entity. The financial constraint for each funding category includes the local match. For highway projects, Financial Constraint 243.75 757.80 - - - 18.75 401.50 40.00 30.00 3.75 25.00 NA NA 65.59 5.90 18.50 1,610.54 the amount shown in the local column is for Local Contribution which is the amount over and above the required local match. Difference (1.66) (157.73) - - - (0.28) (108.72) 1.72 - (28.25) - 56.31 - 4.25 (234.36)
PM/R
eh P
rev
Mai
nt/R
ehab
Met
ro C
orri
dors
Urb
an C
orri
dors
SC S
tate
wid
e C
orri
dors
AQ
Con
g M
it/A
ir
Qua
l
- BR
Bri
dge
epla
ce/R
ehab
MM
& 1
1 - D
D
tr
o M
obili
ty &
11- D
ist D
isc
-SA
F Sa
fety
H E
nhan
cem
ents
SC M
isce
llane
ous
- SP
Stra
tegi
c Pr
iori
ty
L L
ocal
Fun
ds
peci
al S
tudy
Fede
ral
ra
nsit
- 530
7
Stat
e
ra
nsit
- 530
7
rans
it - L
ocal
TO
TA
L
BONDS
TRANSIT
BONDS
1-P M
2- M
C
3- U
C
4-
5-C
MA 6- Re
7- M
Met 1 8-
9-E
NH
10- M
I
12-
LC
L Sp Tr
Tr
Tr
Printed 11/3/2008 11:23 AMUpdated: 02/23/06
385
HIDALGO COUNTY METROPOLITAN PLANNING ORGANIZATION METROPOLITAN TRANSPORTATION PLAN PROJECT DATA
MT
P#
Proj
ect L
engt
h (m
i)
1999
# L
anes
RO
W W
idth
(ft)
Func
tiona
l C
lass
ifica
tion
1999
mod
eled
vo
lum
e
Bas
e Y
ear
LO
S
% T
ruck
s
2030
# L
anes
2030
No
Bui
ld
Vol
ume
No
Bui
ld L
OS
2030
Vol
ume
2030
LO
S
CT
P R
OW
(ft
)
Typ
ical
Se
ctio
n w
idth
Type of Improvement
Jusi
sdic
tion
City
Pri
ority
Wor
k T
ype
Cos
t
Cos
t inc
30%
Let
ting
Cos
t
1-PM
/Reh
Pre
v M
aint
/Reh
ab
2- M
C M
etro
C
orri
dors
3- U
C U
rban
C
orri
dors
4- S
C S
tate
wid
e C
orri
dors
5-C
MA
Q
6- B
R B
ridg
e R
epla
ce/R
ehab
7- M
M &
11
- D
D
7-
Met
ro
Mob
ilit y
8-SA
F Sa
fety
9-E
NH
E
nhan
cem
ents
10- M
ISC
M
isce
llane
ous
12- S
P St
rate
gic
Prio
rity
Oth
er F
unds
(Loc
al, B
ond,
et
c )Sp
ecia
l Stu
dy
Tra
nsit
- FT
A
5307
Tra
nsit
- Sta
te
5307
Tra
nsit
- Loc
al
TO
TA
L
33
On Bus 83 .2 Mi W of FM 491
0.20 East of Cameron County Line
HC-96 TIP 11 Jul-04 2.8 2 94 P Art 9,300 E 2.00% 4 19,616 F 51,187 F 100 64
Widen to 4 Lane Divided 0039-04-095 Rev TIP 11 '05, Added Project
Mercedes/Co C $ 7,100,000 $ 9,561,924 4.78 $ - $ - $ - $ - $ - 4.78 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9.56
33
On Bus 83 .2 Mi W of FM 491
Cameron County Line
HC-96 TIP 11 Jul-04 2.8 2 94 P Art 9,300 E 2.00% 4 19,616 F 51,187 F 100 64
Widen to 4 Lane Divided 0039-04-095 Rev TIP 11 '05, Added Project
Mercedes/Co C $ 7,100,000 $ 9,561,924 4.78 $ - $ - $ - $ - $ - 4.78 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 9.56
241
Reg. Access MultiModal Center
FM 1016 & SP 115 HC-201 10 0.1
Access to Regional MultiModal Center at FM 1016 & SP 115 0921-02-183
$ 3,200,000 $ 3,200,000 2.00 6.80 $ 2,560,000.00
241
Reg. Access MultiModal Center
FM 1016 & SP 115 HC-201 10 0.1
Access to Regional MultiModal Center at FM 1016 & SP 115 0921-02-183
$ 8,800,000 2.00 6.80 $ 8,800,000.00
7
OnUS 281 (Military Hwy)
US 281 E
Mile 3 E - Cameron County Line
HC-55 SMP 2 - C ? 22.1 2 100 MinArt 7,700 C 15.00% 4 10,976 F 15,956 D 150 84
Widen to 4 Lane Divided Rural 0220-01-901,902,903; 0220-02-900; 0220-01-023
Various C $ 46,444,445 $ 46,444,445 $ - $ 46.44 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 46.44
7
OnUS 281 (Military Hwy)
US 281 ECameron County Line
HC-55 SMP 2 - C ? 22.1 2 100 MinArt 7,700 C 15.00% 4 10,976 F 15,956 D 150 84
Widen to 4 Lane Divided Rural 0220-01-901,902,903; 0220-02-900; 0220-01-023
Various C $ 14,625,000 $ 15,063,750 $ - $ 15.06 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 15.06
8
On FM 2220 (Ware Rd) SH 107 S. FM 1924
(3 mile) HC-19 SMP 2 - C ? 4.6 2 80 M Art 7,090 D 4.60% 6 9,792 F 21,347 E 120 70
Widen to 6 Lane Divided 2094-01-038; 2094-01-039
McAllen C $ 34,150,000 $ 34,150,000 $ - $ 34.15 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 34.15
8
On FM 2220 (Ware Rd) SH 107 S. FM 1924
(3 mile) HC-19 SMP 2 - C ? 4.6 2 80 M Art 7,090 D 4.60% 6 9,792 F 21,347 E 120 70
Widen to 6 Lane Divided 2094-01-038; 2094-01-039
McAllen C $ 8,375,000 $ 8,626,250 $ - $ 8.63 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 8.63
248
Pharr Int'l Bridge
At Pharr/ Reynosa Int'l Bridge
HC-231 10 CBI
Improvements at Pharr/ Reynosa Int'l Bridge REV 9/07 0921-02-911; 0921-02-193
$ 5,600,000 $ 6,850,000 $ 6,850,000.00
248
Pharr Int'l Bridge
At Pharr/ Reynosa Int'l Bridge
HC-231 10 CBI
Improvements at Pharr/ Reynosa Int'l Bridge REV 9/07 0921-02-911; 0921-02-193
$ 5,000,000 $ -
RevisedOriginal
Funding Information (in million $) & Financial ConstraintL
ine
Num
bers
Syst
em S
ort
Roa
dway
From To
Sour
ce o
f Pro
ject
New
Fin
anci
al
Cat
egor
y
Let
Sta
tus
Existing Roadway Data Forecast Roadway Data Proposed Project Data