Download - Filming schedule day 2 ig2_
Transcript
Filming Schedule
Date: 04.05.12
Filming Time: 8pm onwardsCrew: Ashleigh Darlington, Charlotte Bracken, Carrie Deans, Cesca Haig and Liam Belch.Equipment: Camera, Tripod, lighting
Location #4 Tabitha’s BathroomCharacters needed: Tabitha, young girlInterior or Exterior: INT.Day or Night:Costume/Props Needed:
NightTabitha – pyjamas. Young girl – pyjamas.Props – tooth brush, mirror
Location #5 Tabitha’s gardenCharacters needed: young girlInterior or Exterior: EXT.Day or Night:Costume/Props Needed:
Middle of the nightprops – bread knife
Location #6 Tabitha’s bedroomCharacters needed: Tabitha, young girlInterior or Exterior: INT.Day or Night:Costume/Props Needed:
Middle of the nightProps: mirror, bed, rope