filming schedule day 2 ig2_

1
Filming Schedule Date: 04.05.12 Filming Time: 8pm onwards Crew: Ashleigh Darlington, Charlotte Bracken, Carrie Deans, Cesca Haig and Liam Belch. Equipment: Camera, Tripod, lighting Location #4 Tabitha’s Bathroom Characters needed: Tabitha, young girl Interior or Exterior: INT. Day or Night: Costume/Props Needed: Night Tabitha – pyjamas. Young girl – pyjamas. Props – tooth brush, mirror Location #5 Tabitha’s garden Characters needed: young girl Interior or Exterior: EXT. Day or Night: Costume/Props Needed: Middle of the night props – bread knife Location #6 Tabitha’s bedroom Characters needed: Tabitha, young girl Interior or Exterior: INT. Day or Night: Costume/Props Needed: Middle of the night Props: mirror, bed, rope

Upload: snailguinproductions

Post on 14-Apr-2017

71 views

Category:

Entertainment & Humor


0 download

TRANSCRIPT

Page 1: Filming schedule day 2 ig2_

Filming Schedule

Date: 04.05.12

Filming Time: 8pm onwardsCrew: Ashleigh Darlington, Charlotte Bracken, Carrie Deans, Cesca Haig and Liam Belch.Equipment: Camera, Tripod, lighting

Location #4 Tabitha’s BathroomCharacters needed: Tabitha, young girlInterior or Exterior: INT.Day or Night:Costume/Props Needed:

NightTabitha – pyjamas. Young girl – pyjamas.Props – tooth brush, mirror

Location #5 Tabitha’s gardenCharacters needed: young girlInterior or Exterior: EXT.Day or Night:Costume/Props Needed:

Middle of the nightprops – bread knife

Location #6 Tabitha’s bedroomCharacters needed: Tabitha, young girlInterior or Exterior: INT.Day or Night:Costume/Props Needed:

Middle of the nightProps: mirror, bed, rope