Enhanced Vapor Recovery
AmendmentsWorkshop
June 18, 2002Air Resources Board
California Environmental Protection Agency
![Page 2: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/2.jpg)
2
Agenda
• Introductions• EVR Tech Review and EVR
Amendments• Discussion of Comments Received• Proposed EVR Amendments• In-Station Diagnostics• Cost-Effective Analysis Update• Schedule
![Page 3: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/3.jpg)
3
Tech Review Direction from March 2000
Resolution • Feasibility of standards with future effective or operative dates
• Comprehensive, thorough and rigorous• Evaluate practical alternatives• Hold workshops• Complete tech review by April 1, 2002• Submit final report to Board for
consideration at a public meeting
![Page 4: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/4.jpg)
4
EVR Amendments
• Propose changes to EVR regulation based on tech review findings
• Improve certification process for Phase II and ISD combinations
• Define “rigid” vapor piping • Revised and new test procedures• General clean-up and clarification
![Page 5: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/5.jpg)
5
Comments ReceivedTech Review Other
EVR• EVR alternatives• Phase II
standards• Nozzle standards• ISD• Cost Analysis
• EVR implementation schedule
• Certification process
• Sole source• In-use VR systems• ISD Enforceability
![Page 6: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/6.jpg)
6
EVR Implementation Schedule
Concerns:• One certified Phase I system• No certified Phase II systems• No certified ISD systemsResponse• will not lower bar just to certify
multiple systems
![Page 7: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/7.jpg)
7
Phase I EVR Status
• 17 system applications• 14 test sites sealed• 9 systems failed• 3 systems currently on test• 1 system withdrawn• 1 system certified
![Page 8: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/8.jpg)
8
Phase II EVR Status
• 2 system applications• 0 test sites sealed• 0 systems currently on test
![Page 9: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/9.jpg)
9
The Enhanced Vapor Recovery Timeline
2007 20082001 2002 2003 2004AprilApril
2005 2006AprilAprilJuly April April April
In-Station Diagnostics ( > 1.8 million gal/yr)
Phase II EVR System
ORVR Compatibility
Phase I EVR System
100ml/1000gal
Spitting (<1ml)
Liquid Retention (350ml/1000gal)
2/1/2001
April 1, 2002
Complete Technical
Review
Dripless Nozzle (<1 drop/fueling)
In-Station Diagnostics ( >160,000 gal/year)
Spillage
![Page 10: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/10.jpg)
10
Phase II and ORVR
Comment:• Extend ORVR compliance date to
April 2007 to align with Phase IIResponse:• Excess emissions of 3.4 tons/day
in 2005 would not be controlled. No delay in ORVR requirements.
![Page 11: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/11.jpg)
11
EVR for Attainment Areas
Comment:• Request delayed
implementation for districts in attainment areas
Response:• EVR needed to minimize
benzene exposure
![Page 12: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/12.jpg)
12
Certification Process: Encourage R&D
Comment:• Expedite/simplify application
process for research projectsResponse:• Have approved 12 R&D sites
over 18 months, usually within weeks of request
![Page 13: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/13.jpg)
13
Certification Process:Provide Funding
Comment:• Provide grants for development
where industry options are limitedResponse:• ARB Innovative Clean Air
Technology (ICAT) grants are available
![Page 14: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/14.jpg)
14
Certification Process:Test Stations
Comment:• Require a minimum of 300,000 or
400,000 gal/monthResponse:• Hard to get test sites now at
150,000 gal/month. No change.• Evaluate performance for higher
throughputs
![Page 15: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/15.jpg)
15
Certification Process:Test Stations
Comment:• Expand or eliminate 100-mile
radius from SacramentoResponse:• Need sites close to Sacto
certification staff. Will consider exceptions for good cause.
![Page 16: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/16.jpg)
16
Certification Process:Nozzles
Comment:• Certify nozzles separately to
meet spillage and drip standardsResponse:• Nozzles are system-specific
component and cannot be separated from Phase II system
![Page 17: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/17.jpg)
17
Certification Process:Processors
Comment:• Certify processors by system
typeResponse:• We are considering this change
![Page 18: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/18.jpg)
18
Sole Source for EVR Systems
Comment:• One option leads to higher cost and
inadequate supplyResponse:• Additional systems should be
available before EVR deadlines for existing stations. Unfair to penalize system that meets requirements.
![Page 19: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/19.jpg)
19
In-use VR SystemsComment:• Address deficiencies in balance
systems. Develop test procedures for in-use components
Response:• EVR balance systems will address
deficiencies. Suggest districts take lead in developing inspection test methods.
![Page 20: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/20.jpg)
20
• EVR alternatives• Phase II
standards• Nozzle standards
• ISD• Cost Analysis
• EVR implementation schedule
• Certification process• Sole source• In-use VR systems
Tech Review Comments
• ISD Enforceability
![Page 21: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/21.jpg)
21
EVR Alternatives
Comment:• Report does not provide thorough and
rigorous review of alternativesResponse:• Staff evaluated all alternatives
identified by stakeholders. No alternatives sought for standards characterized as feasible
![Page 22: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/22.jpg)
22
Phase II standards
• Maximum A/L ratio• Pressure-related fugitives• Balance component pressure
drops• Nozzle/dispenser compatibility• Processors
![Page 23: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/23.jpg)
23
Maximum A/L ratio
Comment:• Max A/L should be based on system
specific failure mode risk.Response:• Allowable A/L ranges established during
certification. Max A/L limits ensure excess emissions do not exceed EVR system limits in the event of system failure.
![Page 24: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/24.jpg)
24
Pressure-related fugitives
Comments:• Standardize to allowable leak rate.• Don’t combine allowable leak with
actual operating test pressures Response:• Considering introducing a controlled
largest allowable leak during a portion of the operational test
![Page 25: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/25.jpg)
25
Balance component pressure drops
Comment:• Include allowance for ISD flow sensor by
increasing total allowable pressure dropResponse:• No increase in total pressure drop• Use balance components that meet lower
than max for systems with ISD flow sensors
![Page 26: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/26.jpg)
26
Nozzle/dispenser Compatibility
Comment:• How will compatibility be
determined for grandfathered six-pack dispensers?
Response:• Will provide guidance on
compatible EVR nozzles for existing dispensers
![Page 27: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/27.jpg)
27
Processors
Comment:• Not true that complete redesign of
processor systems necessary to meet EVR
Response:• Will modify report to reflect manufacturer
claim that existing system meets max A/L and processor flowrate limits
![Page 28: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/28.jpg)
28
Nozzle standards:Post-Fueling Drips
Comment:• Manufacturer claims can meet 3 drop
averageResponse:• Propose 3 drop average over total
station (10 runs/nozzle) with maximum of 10 drops for any one fueling. Verify 3 drops feasibility by Sept. 2002
![Page 29: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/29.jpg)
29
Agenda
• Introductions• EVR Tech Review and EVR
Amendments• Discussion of Comments Received• Proposed EVR Amendments• In-Station Diagnostics• Cost-Effective Analysis Update• Schedule
![Page 30: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/30.jpg)
30
Proposed EVR Amendments
• “Dripless” nozzle standard• CP-201 revisions• Test procedure changes• Certification of ISD by system
type• ISD-based maintenance during
certification testing
![Page 31: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/31.jpg)
31
“Dripless” nozzle standard
• Currently “1 drop per refueling”
• Only EVR standard determined not to be feasible in tech review
• 3 drop average with 10 drop max is proposed
![Page 32: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/32.jpg)
32
CP-201 revisions
• Processor HC rate• Efficiency for ORVR fuelings• Vapor piping definitions• Hand pump specifications• Certification process changes
![Page 33: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/33.jpg)
33
Processor HC rate
Propose:“maximum hydrocarbon
feedrate from to the processor shall not exceed 5.7 lbs/1000 gallons”
![Page 34: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/34.jpg)
34
Efficiency for ORVR fuelings
• Efficiency calculation not valid for ORVR fueling
• Modify CP-201 to calculate efficiency for non-ORVR vehicles only
![Page 35: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/35.jpg)
35
Vapor piping definitions
• Need definition for “rigid” pipe• Options
– minimum bend radius– bulk modulus– pipe deflection test procedure
![Page 36: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/36.jpg)
36
Hand pump specifications
• Evaluate hand pumps to be used in place of spill container drain valves
• Certify that hand-pumps are durable and remove liquid as well as drain valve
![Page 37: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/37.jpg)
37
Dispenser standard
• Dispenser vapor piping for balance systems already designated as a non-system specific component
• Propose to remove “balance” to allow all dispenser vapor piping to be non-system specific
![Page 38: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/38.jpg)
38
Daily high pressure• Clarify calculation in CP-201• Intent:
– Calculate the average pressure reading for each hour.
– Identify the highest one-hour pressure average over a 24 hour period. This is the daily high pressure.
– Compute rolling 30-day average of daily high pressures - may not exceed +1.5 inches water.
![Page 39: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/39.jpg)
39
Certification process changes
• innovative system• throughput for sixpack dispenser• Phase I systems
• certify ISD by system type• ISD-based maintenance
![Page 40: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/40.jpg)
40
Innovative system
• Intent was to allow flexibility for systems which emit much less than allowed by current standards
• In practice - viewed as way to avoid compliance with some EVR requirements
• Language to be modified to better reflect intent
![Page 41: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/41.jpg)
41
Test site throughput for sixpack dispensers
• Unihose: Minimum throughput of 150,000 gal/month
• Six-pack: Minimum throughput of 150,000 gal/month for one grade of gasoline
![Page 42: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/42.jpg)
42
Phase I systems
• Operational test of < 180 days for new Phase I systems composed entirely of previously certified Phase I components to be considered
![Page 43: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/43.jpg)
43
Test procedure changes
TP-201.1 Phase I EfficiencyTP-201.2B Component LeakratesTP-201.2D Post-Fueling DripsTP-201.2F Pressure-related
Fugitives
![Page 44: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/44.jpg)
44
Proposed test procedures
TP-201.2? Balance componentspressure drops
TP-201.1? Continuous pressuremonitoring
TP-201.2? ISD certification
![Page 45: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/45.jpg)
45
TP-201.1 Phase I Efficiency
• Current procedure assumes volume of vapor returned to cargo tank is same as volume of gallons dispensed
• Revised procedure measure vapor volume directly using meter to improve accuracy
![Page 46: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/46.jpg)
46
TP-201.2B Component leakrates
• Current procedure for P/V valve leak measurement uses rotameters
• Revised procedure allows option for mass flow controller to improve accuracy
![Page 47: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/47.jpg)
47
TP-201.2D Dripless nozzle
• Modifications suggested to improve method consistency
• 15 drops/ml to be changed to 20 drops/ml to be consistent
with spillage procedure
![Page 48: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/48.jpg)
48
TP-201.2F Pressure-related
fugitives• Current procedure has missing
equations• Change time for pressure
decay from 20 minutes to 5 minutes
![Page 49: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/49.jpg)
49
Balance component pressure drop
• New procedure • Bench test to determine
pressure drop for balance components
![Page 50: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/50.jpg)
50
Continuous pressure monitoring
• New procedure• Describes equipment and
procedure for pressure monitoring required for certification operational tests
![Page 51: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/51.jpg)
51
ISD Performance
• Describes certification tests to determine compliance with ISD standards
![Page 52: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/52.jpg)
52
Agenda
• Introductions• EVR Tech Review and EVR
Amendments• Discussion of Comments Received• Proposed EVR Amendments• In-Station Diagnostics• Cost-Effective Analysis Update• Schedule
![Page 53: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/53.jpg)
53
Certification Process:ISD
Comment:• Certify ISD by system typeResponse:• ISD system type certification
will be proposed in the EVR amendments
![Page 54: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/54.jpg)
54
ISD Enforceability
Comment:• ISD A/L failures should be
equivalent to Executive Order requirements
Response:• ISD is a diagnostic tool to correct
gross failures - it is not a Continuous Emission Monitor!
![Page 55: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/55.jpg)
55
ISD Enforceability
Comment:• Lack of corrective action is a
violation• Tamper-proof ISD systems• Require shut-down for gross failuresResponse:• Agree
![Page 56: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/56.jpg)
56
ISD Compatibility
Comment:• ISD systems must be compatible
with existing UST tank monitors Response:• Use stand-alone ISD systems where
there are compatibility issues. Costs are reflected in economic analysis.
![Page 57: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/57.jpg)
57
In-Station Diagnostics
Comment:• A less elaborate ISD system could
meet goals and cost lessResponse:• Less elaborate ISD systems
reviewed did not achieve same emission reductions
![Page 58: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/58.jpg)
58
In-Station Diagnostics
Comment:• ISD is a non-invasive, passive system.
Only one certification is necessary for any type system
Response:• ISD systems may not be completely
independent of Phase II. • Proposing certification by “system-type”
![Page 59: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/59.jpg)
59
In-Station Diagnostics
Comment:• ORVR penetrations >80% may
affect performance of ISD systems Response:• ISD systems will be evaluated at
high ORVR penetration during certification testing
![Page 60: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/60.jpg)
60
In-Station Diagnostics
Comment:• ISD pressure integrity standard too
vague Response:• Will remove reference to orifice
and leave the 2X allowable leak requirement
![Page 61: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/61.jpg)
61
In-Station Diagnostics
Comment:• Request for ISD pilot study
dataResponse:• Data can be made available
![Page 62: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/62.jpg)
62
Certification of ISD by system type
• Three certification options considered:
– ISD certify once with one Phase II system– ISD certify with every Phase II system– ISD certify with each Phase II system type
![Page 63: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/63.jpg)
63
Proposed ISD System Types
• Balance• Balance with Processor• Vacuum assist (dispenser-based)• Vacuum assist (dispenser-based
with processor)• Central vacuum• Central vacuum with processor
![Page 64: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/64.jpg)
64
ISD-based maintenance during certification
testing• ISD benefit is immediate
identification of system failures• Recognize that ISD will make it
harder for Phase II systems to pass operational test
• Provide limited repair of failures identified by ISD during certification
![Page 65: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/65.jpg)
65
ISD-Maintenance Criteria
• No failure for 90 days• ISD-detected failures identified in
maintenance manual• Maximum 5% of allowable downtime
for to ISD-detected failures• Manual field test failures are
grounds for test termination
![Page 66: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/66.jpg)
66
If ISD-Detected Failure Occurs
• System certification will require use of ISD system
• Executive Order is non-renewable thus complete certification tests would be required after 4 years
![Page 67: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/67.jpg)
67
If No ISD-Detected Failures
• System may be certified for use both with and without ISD
• Certification may renewed after four years with no additional certification testing unless deficiencies are identified
![Page 68: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/68.jpg)
68
Agenda
• Introductions• EVR Tech Review and EVR
Amendments• Discussion of Comments Received• Proposed EVR Amendments• In-Station Diagnostics• Cost-Effective Analysis Update• Schedule
![Page 69: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/69.jpg)
69
Cost Methodology
• Comments received• Updates to cost analysis since
tech review report• Current cost-effectiveness
![Page 70: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/70.jpg)
70
Cost Changes based on Comments
• ISD installation costs depend on station size
• ISD maintenance/calibration/repair costs vary by station size
• Include annual field test costs for balance systems
![Page 71: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/71.jpg)
71
ISD installation costs
• EVR ISOR - $1280 per dispener• Tech Review - $2560 per dispenser• Update based on pilot site
experience for retrofit installation:– Base install for each site = $300– Unit cost for each dispenser = $200
![Page 72: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/72.jpg)
72
GDF Model StationsGroup GDF 1 GDF 2 GDF 3 GDF 4 GDF 5Typical
throughputgal/mo
13,233 37,500 75,000 150,000 300,000
Throughputrange
gal/mo
Up to25,000
25,001–50,000
50,001–100,000
100,001–200,000
200,001and up
%throughput
0.6 5.3 34.3 47.1 12.7
% stations 4.7 14.1 45.7 31.3 4.2Number ofdispensers
1 1.5 3 4.5 6
![Page 73: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/73.jpg)
73
ISD Installation Costs
GDF 1 GDF 2 GDF 3 GDF 4 GDF 5EVRISOR
$1,230 $1,230 $1,230 $1,230 $1,230
TechReview
$2,560 $2,560 $2,560 $2,560 $2,560
ISDPilot
$500 $600 $900 $1,200 $1,500
![Page 74: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/74.jpg)
74
ISD maintenance/calibration/repair
costs per facility• EVR ISOR - not included• Tech Review - $1200/yr• Update based on # components
with vendor estimated costs:– A/L sensor = $300– Pressure sensor = $200– Datalogger = $50– Contractor training/certification = $20
![Page 75: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/75.jpg)
75
ISD maintenance/calibration/repair
costs per facility
GDF 1 GDF 2 GDF 3 GDF 4 GDF 5EVRISOR
Notincluded
Notincluded
Notincluded
Notincluded
Notincluded
TechReview
$1,200 $1,200 $1,200 $1,200 $1,200
Veeder-Root
$520 $720 $1,170 $1,620 $2,070
![Page 76: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/76.jpg)
76
Include annual field test costs for balance systems
• Existing balance system Executive Orders require testing every 5 years
• EVR systems will require annual testing
• Need to add costs associated with balance system increased testing
• Will do after review of district requirements for balance systems
![Page 77: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/77.jpg)
77
Other Cost Analysis Updates
• Corrected annual equipment cost for cost-effectiveness calculation
• Reduced projected number of certified EVR systems
• Increased “worst case” ISD system cost
• Revised ISD emission reductions
![Page 78: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/78.jpg)
78
Corrected Cost-effectiveness Factor
• Error in February 2000 cost analysis in spreading cost over 4-year period
• Increases equipment costs in summary table by a factor of 3.5
• Total annual equipment costs in GDF tables do not change
![Page 79: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/79.jpg)
79
Reduced projected number of EVR systems
EVRISOR
TechReview
RevisedProjection
Phase I 14 14 7
Phase II 64 64 32
ISD 16 16 8
![Page 80: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/80.jpg)
80
ISD “Worst Case” Equipment Cost Update
tech rev now$3,995$670
$750 $595$900 $885
not incl $1,095
$4,500TLS-350ISD
Dispenser Interface
Inventory sensor
Pressure sensorFlow sensor
![Page 81: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/81.jpg)
81
ISD Equipment Only Cost Comparison
GDF1 GDF2 GDF3 GDF4 GDF5Tech Rev $6,150 $6,600 $7,950 $9,300 $10,650Update $8,883 $9,625 $10,656 $11,980 $13,308
![Page 82: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/82.jpg)
82
Revised ISD emission reductions
• Revisions described in EVR Technology review report but were not applied in cost analysis
• ISD emission reductions increase from 6.6 to 8.5 tons/day of 2010 ROG
![Page 83: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/83.jpg)
83
Feb 2000 EVR Costs33 million annually
R&D38%
Certification26%Equipment
36%
![Page 84: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/84.jpg)
84
June 2002 EVR Costs88 million annually
Certification5%
R&D7%
Equipment88%
![Page 85: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/85.jpg)
85
EVR Total Equipment and Installation Costs
$0$5,000
$10,000$15,000$20,000$25,000$30,000$35,000$40,000$45,000$50,000
GDF 1 GDF 2 GDF 3 GDF 4 GDF 5
ISDLiq RetSpillageORVRPhase I IPhase I
![Page 86: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/86.jpg)
86
Overall Cost-Effectiveness as of June
2002 $88,000,000/yr 1 ton 1 yr 27 tons/day 2000 lb 365 days
= $4.46/lb
![Page 87: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/87.jpg)
87
EVR Cost Effectiveness as of June 2002
Group GDF 1 GDF 2 GDF 3 GDF 4 GDF 5gal/mo 13,233 37,500 75,000 150,000 300,000
% 4.7 14.1 45.7 31.3 4.2EVR
em red(tpd)
0.17 1.43 9.27 12.71 3.43
C.E.*($/lb)
$24.22$15.37
$9.10 $5.74 $3.40 $1.95
*Overall Cost-Effectiveness = $4.46/lb
![Page 88: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/88.jpg)
88
EVR Cost Effectiveness Development ($/lb)
GDF 1 GDF 2 GDF 3 GDF 4 GDF 5ISOR
Feb 2000$12.49 $4.42 $2.41 $1.24 $0.63
Tech RevApr 2002
$15.25$10.11
$5.46 $3.04 $1.61 $0.81
WorkshopJun 2002
$24.22$15.37
$9.10 $5.74 $3.40 $1.95
Bd MtgSept 2002
?? ?? ?? ?? ??
![Page 89: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/89.jpg)
89
Cost Effectiveness of Major RegulationsMobile Sources and Fuel
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002
Board Hearing Year
Do
lla
rs p
er
Po
un
d
0.4 NOx LDV
5 g HDD 4-Stroke Lawn
2-Stroke Lawn
LEV
0.25 HC LDV
OBD 1
RFG 2
Off-Road Diesel
Off-Road Motorcycles
Medium TruckOff-Cycle LDT
2.4 HDDE
PWC/Outboard
On-Road Motorcycles
Aerosol Adhesives
Inboard/Sterndrive
EnhancedVapor Recovery
![Page 90: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/90.jpg)
90
Schedule for EVR Regulation Amendments• Comments by July 5, 2002• Notice and ISOR release on August 9, 2002 (start of 45-day comment period)• September 26, 2002 Board
meeting
![Page 91: Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency](https://reader030.vdocuments.us/reader030/viewer/2022032708/56649e6c5503460f94b6b95f/html5/thumbnails/91.jpg)
91
EVR Contacts
• EVR Amendments - Cindy Castronovo– [email protected] (916) 322-8957
• In-Station Diagnostics - Joe Guerrero– [email protected] (916) 324-9487
• EVR Certification - Laura McKinney– [email protected] (916) 327-0900
www.arb.ca.gov/vapor/vapor.htm