ENHANCED STATION INITIATIVEPACKAGE 3
William Montanile, P.E.Program Manager
February 13, 2018Community Board 7
![Page 2: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/2.jpg)
Contract Information1. Award date
2. Duration
Contractor
Designer
cost
2
General Information
Contractor ECCO III with Hardesty & Hanover/Lee Harris Pomeroy
Award October 25, 2017
Substantial Completion December 2018
Construction Cost $111,190,000
Stations 163 Street - Amsterdam Avenue CCathedral Parkway (110 Street) BC86 Street BC72 Street BC
![Page 3: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/3.jpg)
3
Package 3 Summary 163 Street
Underground, two side platformsCentral large mezzanine, building entrance
Cathedral Parkway (110 Street)Underground, two side platformsSmall mezzanine, exposed express lanes
86 StreetUnderground, two level stacked platformsNo mezzanine, no connections
72 StreetUnderground, two level stacked platformsNo mezzanine, no connections
![Page 4: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/4.jpg)
Scope & Key Elements1. Station Repairs
1. Waterproofing
2. Repair/replace floor topping
3. Concrete spall repair
2. Rehabilitated Station Entrances
1. Guardrail integrated or freestanding totem
2. Countdown clocks
3. Illuminated handrails
3. Improved Mezzanines
4. Improved Platforms
4
![Page 5: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/5.jpg)
Scope & Key Elements5. Other Improved Customer Amenities
1. Countdown clocks
2. Wi-Fi
3. Help Points
4. LED lighting
5. Consolidated wireway
6. Design-build Contracting
5
![Page 6: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/6.jpg)
Station Closures1. Award date
2. Duration
Contractor
Designer
cost
6
Scheduled datesStation Close Re-open Allowable Duration
Cathedral Parkway (110 Street) BC
April 9, 2018 September 2018 Less than 6 months
86 Street BC June 4, 2018 October 2018 Less than 6 months
72 Street BC May 7, 2018 October 2018 Less than 6 months
![Page 7: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/7.jpg)
Diversions1. Award date
2. Duration
Contractor
Designer
cost
7
Weeknight Weekend
Station Northbound Southbound Northbound Southbound
CathedralParkway (110 Street) BC
86 Street BC
72 Street BC
20 20 9 9
110 St/86 St/72 St – 40 weeknight and 18 weekend diversions
![Page 8: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/8.jpg)
Cathedral Parkway (110 Street)
![Page 9: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/9.jpg)
110 Street Existing Entry
9
![Page 10: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/10.jpg)
110 Street Proposed Canopy Entry
10
![Page 11: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/11.jpg)
110 Street Existing Entry
11
![Page 12: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/12.jpg)
110 Street Proposed Central Park Entry
12
![Page 13: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/13.jpg)
110 Street Existing Entrance Adjacent to Building
13
![Page 14: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/14.jpg)
110 Street Proposed Entry Adjacent to Building
14
![Page 15: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/15.jpg)
110 Street Existing Mezzanine
15
![Page 16: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/16.jpg)
110 Street Proposed Mezzanine
16
![Page 17: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/17.jpg)
110 Street Existing Platform
17
![Page 18: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/18.jpg)
110 Street Proposed Platform
18
![Page 19: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/19.jpg)
86 Street
![Page 20: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/20.jpg)
86 Street Existing Entrance Adjacent to Building
20
![Page 21: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/21.jpg)
86 Street Proposed Entry Adjacent to Building
21
![Page 22: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/22.jpg)
86 Street Existing Control Area
22
![Page 23: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/23.jpg)
86 Street Proposed Control Area
23
![Page 24: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/24.jpg)
86 Street Existing Platform
24
![Page 25: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/25.jpg)
86 Street Proposed Platform
25
![Page 26: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/26.jpg)
72 Street
![Page 27: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/27.jpg)
Existing Station Entrance
27
![Page 28: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/28.jpg)
72 Street Proposed Entry at Adjacent Building
28
![Page 29: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/29.jpg)
72 Street Existing Control Area
29
![Page 30: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/30.jpg)
72 Street Proposed Control Area
30
![Page 31: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/31.jpg)
31
BRO
ADW
AY
72 Street Existing Platform
![Page 32: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/32.jpg)
72 Street Proposed Platform
32
![Page 33: ENHANCED STATION INITIATIVE PACKAGE 3...Feb 13, 2018 · 3. Concrete spall repair 2. Rehabilitated Station Entrances 1. Guardrail integrated or freestanding totem 2. Countdown clocks](https://reader034.vdocuments.us/reader034/viewer/2022052017/602fc1607fe8540a97077532/html5/thumbnails/33.jpg)
Thank You
33