Transcript

Dumont Parcel Update

May 2016

City Center Park Update(Dumont Parcel)

Project Status:

60% Engineered

Project Team:

• Landworks

• Engineering Ventures

• Northwoods Environmental

• City

City Council Resolution 2015

60% Engineering

Paths

Discovery

Water Quality

Landscaping

Project Look Ahead

• Meet with adjacent neighbors

• Pursue easement

• Work with VYCC to schedule invasive removal

• Finalize engineering

• Funding vote

• Bid out project

• Construct


Top Related