Monthly operating rept for Dec 1980.,
* Notes1. Unit Hanet E.I. Hatch Huclear # tant Unit 2 * *
2. Reporting Periodt 12-80 * *
5. Design Electrical Rating (Het MWe): 784.0 * *
6. Maxinun Dapendable Capacity (Cross MWe)I 805.7 * *.
7. Maxinun Dependable Capacity (Het MWe): 772.7 ******************************************************* *
8 If Changes Occur, in Capacity Ratings (Itens Henber 3 Through 7) Since Last Report, CIve Reasonst *
\ 9. Pouer Level To Which Restricted, If Ang (Het NWe):
10 Reasons For Restrictions, If Anyt
! .
This Month Yr.-to-Date Cunulative it. Hours In Reporting Period 744 8784 1161712. Hunber Of Hours Reactor Was Critical 0.0 5570.3 8233.813. Reactor Reserve Shutdown Hours 0.0 0.0 0.014 Hours Generator On-Line 0.0 5273.8 7688.315. Unit Reserve Shutdown Hours 0.0 0.0 0.016. Cross Thernal Energy Generated (MWH) 0 11603836 1709789817. Cross Electrical Energy.Cenerated (MWH) 0 3831320 566728018. Het Electrical Energy Generated (MWH) -2412 3644977 540211419. Unit Service Factor '
0.0 60.0 66.2 ,
20. Unit Availability Factor' O.0 60.0 66.221. Unit Capacity Factor (Using MDC Het) -0.4 53.7 60.222. Unit Capacity Factor ( Usi ng DER Het) -0.4 52.9 59.323. Unit Forced Outage Rate 0.0 12.4 11.824. Shutdouns Scheduled Over Hext 6 Months (Type, Date, and Duration of Each): Tw c4
25. If Shut Down At End or Report Period, Estinated Date of Startupt Ek26. Units In Test Status (Prior to Connercial Operation)8 Forecast Achieved '[v
INITIAL CRITICALITY CIIHITIAL ELECTRICITY _______________ _______________ _______________ '"COMMERCIAL OPERATIDH _______________
C;_______________ _______________
m -
. -
COMPLETED BY J.H. KAMISHLIAH ,
MONTH 12-80
DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MUe-Met) { (MUe-Het)
1 -3 17 -4 ,
2 -3 ' 18 -3*
3 -3 19 -3 4 -3 20 -3 5 -3 21 -3 6 -3 1 22 - -3 7 -3 23 -3 3 -3 24 -3+
9 -3 25 -3 to -4 j 26 -3
*
.
UNIT N AME llatch 2 DATE l-10-81.
.
COMPLETED BY J. f1 Kami5hIian REPORT MONTH December TELEPilONE 912-367-7781
3 E -
f -
.
80-54 801201 - S 744 C 1 NA 'ZZ ZZZZZZ Shutdown for refueling 4
i W-
F: Forced Reason: Method: Exhibit C Instruction
5: Scheduled A Eiguipment Failure (Explain) 1 Manust for Preparation of Data,
B41aintenance of Test 2 Manual Scram. Entry Sheets for Licenser
C Refueling 3 Automatic Scram. Event Report (LERI File (NUREG- .
D Regulatory Restriction 4 -Continuations 0161)*
* .
i 4
,
.
~ ,
* -
., '
.
.
NUMBER DATE COMPLETED DESCRIPTION 80-2949 11-21-80 Replaced SBM switch stop plates
on valves 2BM-F022A-D, 2B21-F028A-D,, and PN22-F249A-D*
with new stop plate GE P/N 127A6753P1
'
79-3357 11-25-80. Replaced diodes in ion chamber power supplies 2C51-K605 per GE_
field engineering memo #79-03
80-3446 12-17-80 Replaced flange gasket on N2 storage tank 2Ty8-A001 with 1/8" teflon gasket
80-3493 12-18-80 Replaced asphalt drain ditch and railroad as were after damage due to water errosion
'
repaired parts according to original specs
80-3839 12-4-80 Repaired loose connection in the 2B21-J002 panel which was connected to thermocouple 2B21-N004F
80-4059 12-11-80 Removed defective solenoid off PSW outlet valve 2P41-4339A and replaced with pilot solenoid off of 2P41-4339B
80-4126 11-14-80 Made adjustments on R45 on main chasis and power supply bd. of reactor building vent monitor 2D11K636B, also adjusted R3 on log ratemeter board
.
,- .
. . , . .
* .
80-4291 12-5-80 Stand by plant service water pump 2P41-C002 was disassembled and serviced so as to pump at rated pressure; pump and motor were reinstalled and proc. HNP-6951 performed
80-4320 11-19-80 Backfilled 2E11-N015B, flow indicator 2E.11-R603B now reads*
correctly
80-4340 11-19-80 Cleaned and lubricated HPCI turb. control valve 2E41-TCV limit" - - - - -
switch plunger with C.R26
80-4351 11-27-80 Replaced bad GM tube in ARM 2D2-P600 in the sensor and converter
80-4456 12-15-80 R e p la'c e'd one min-3 fuse in "A" RPS scram pilot valve to control rod 2C11-26-03
80-4537 11-15-80 Removed and functionally tested per Tech Specs hyraulic snubber 2E11-RHR-R86
80-4538 11-15-80 Removed and functionally tested per Tech Specs hydraulic enubber.
2B31-55B-17
80-4539 11-15-80 Removed and functionally tested per Tech Specs hydraulic snubber 2B31-55A-17
80-4540 11-13-80 Removed and functionally tested per Tech Specs hydraulic snubber 2E21-R40
80-4541 11-13-80 Removed and functionally tested per Tech Specs hydraulic snubber 2E21-R87
80-4542 11-15-80 Removed and functionally tested per Tech Specs hydraulic snubber 2E21-R107P
80-4543 11-13-80 Removed and functionally tested per Tech Specs hydraulic anubber 2E11-RHR-R15B
80-4544 11-13-80 Removed and functionally tested i per Tech Specs hydraulic snubber
2E21-R72B
l
o
*
'
80-4546 11-13-80 Removed and functionally tested per Tech Specs hydraulic snubber 2T46-R68A
~
80-4571 11-20-80 Removed and functionally tested per Tech Specs hydraulic snubber 2B31-SSA3
80-4573 11-22-80 Removed and functionally tested per Tech Specs hydraulic snubber 2B31-SSA8
80-4574 11-22-80 Removed and functionally tested per Tech Specs hydraulic snubber 2B31-SSA7
80-4575 12-6-80 Removed and functionally tested per Tech Specs hydraulic snubber 2E11-RHR-R238A
80-4576 12-6-80 Removed and functionally tested per Tech Specs hydraulic snubber 2E11-RHR-R241A
80-4577 12-6-80 Removed and functionally tested per Tech Specs hydraulic snubber 2E11-RHR-R245A
80-4578 12-6-80 Removed and functionally tested per Tech Specs hydraulic snubber 2E21-R53A
80-4579 12-6-80 Removed and functionally tested per Tech Specs hydraulic anubber 2E11-RHR-R250
80-4580 12-8-80 Removed and functionally tested per Tech Specs hydraulic snubber 2T46-SGTS-R67
-
RWCU pump 2631-C0013 in order to stop leak
80-4664 12-11-80 Replaced sheared off spring pins in Unit 1 to Unit 2 fuel pool cooling crosstie valve 2641-F037
80-4666 11-27-80 Changed setpoints on recorder 2D11-R619 for Rx b1dg. vent exh. hi radiation alarm 2H11-P601
80-4702 NA Calibrated under RPT breaker' ~~
under voltage ' monitors.-
2C71-K25A-F according to DCR 80-227 ad H-27605
80-4708 12-9-80 Bore all inter bowls and suction bowls to 6.100", interpellers wear, rings fabricated to .005", cut interference pr sed on impeller to 6.084" on standby service water pump 2P41-C002
80-4710 11-23-80 Adjusted spring charging switch on PSW pump 2P41-C001D
80-4714 11-20-80 Replaced RWCU pump 2631-C001A backup ring with a TEFZEL 280 backup ring per DCR 80-408
80-4725 12-9-80 Inspected station service battery chargers 2R42-5026, 5027, 5028, 5029, 5030, 2051 while performing charger load test per HNP-2-3905
80-4790 12-17-80 Tightened and adjusted operator and limit switch on vessel outlet isolation valve EBB 2G31-F.056B
80-4845 12-11-80 Adjusted, cleaned, and lubricated | torque switch on RHR drywell
isolation valve 2E11-F040
80-4856 12-23-80 Replaced solenoid and valve of chem, waste floor drain tank recire valve 2G11-F413
80-4860 12-17-80 Readjusted limits on fuel pool |
cooling and cleanup panel 2G41-P001 valve lights
|
.
.
. .
.
.., .
recorder 2748-R609 blue pin calibrated
(::2 80-4864 12-16-80 Moved bug source back to proper *
position and tightened all knobs on all indicators and power supplies on control rm area rad monitor indicator 2D21-K601,
80-4859 12-11-80 Pulse preamp for Unit 2 radwaste effluent radiation monitor 2D11-N007 was strapped for 16: 1 attenuation factor
80-4901 12-16-80 Repaired connector and replaced fuse for CMCAM 2D21-R167
( .
|
80-4934 12-9-80 Removed and functionally tested per Tech Specs E-system snubber 2B31-SSA21 *
() 80-4941 NA Installed test. valves P/N-152510-100 on E-system snubbers 2B31-c006 that did not have them
80-4943 NA Adjusted micro-switches on Cable spreading rm iso valve tamper alarm 2Z43-F301E
80-4978 12-9-80 Procedure HNP-2-3167 was performed on RHR pump 2E11-C001A,B,C,D
80-4982 12-16-80 Calibrated press switch on D/G air compressor 2R43-C001C
80-5021 12-17-80 Old SBLC squib valve 2C41F004A was replaced after it had been fired per HNP-2-3703 , J.
80-5022 12-17-80 Old SBLC squib valve 2d41-F004B was preplaced by new valve P/N 1532-162-01 after it had been fired per HNP-2-3702 O
.
80-5039 NA Moved pipe clamp on snubber 2B21-R112 around on pipe to line up with snubber and allow free rotation; also removed paint from shaft
80-5041 NA Moved bracket holding snubber 2R21-R116 in order to allow for free rotation,
80-5050 NA Installed new gall plug, cleaned thread on plug using tap the size of 1 4/16" 12 threads per inch-
on standby liqid centrol squib. valve 2C41-F004B
80-5066 12-16-80 Removed and functionally tested per Tech Specs hydrauic snubber 2B31-SSB6