1
J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014
![Page 2: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/2.jpg)
2
– Renewed Culture that Focuses on Accountability,
Consistency, Transparency and Building Relationships
– Focus on streamlined process and continuous improvement
– Total Project Delivery - 3 Sections – Technical Programs – Mark Nagel – Infrastructure and Quality Assurance (Civil
Projects) – New Director – Glenn Frieler
– Facility Services (Building Projects) – New Director – David Mashburn
DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION
![Page 3: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/3.jpg)
3
DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION
![Page 4: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/4.jpg)
BEST PRACTICES
Partners in Leadership
![Page 5: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/5.jpg)
A NEW, LEANER WAY OF DOING BUSINESS
With the development of the Project Management Guidelines (PMG), available on at www.flydenver.com , process maps illustrate a more efficient understanding on necessary steps for successful DIA project management.
Future Guideline Updates: Design Standard Manuals (DSM) January 2015 Tenant Development Guidelines (TDG) January 2015
![Page 6: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/6.jpg)
PMG Guidelines
– Governing Entities and Document References: – State and Federal requirements provide a firm foundation as a baseline of
minimum objective criteria to build by. – TSA, FAA, EPA, USFW, etc – CDPHE, SHPO, CDOT, etc – Federal Codes - 49 CFR, Parts 23 & 26
– CCD Ordinances – Ordinance 760
– CCD Building Codes – Contract and General Contract Conditions (The Yellow Book) Title 17,
Inspection and Defects – DEN Design Standard Manual and Construction Specifications
– 24 hour/7 days a week Critical Infrastructure
– Meet the Operational and Financial Needs of our Airline Partners and Traveling Public – DEN Airside/Terminal/Landside Operations – Keep Airline Costs Low
6
![Page 7: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/7.jpg)
7
PROCESS MAP – Ex. Bidding Projects
Appendix A – in the PMG Consists of 38 Process maps. This map shows page 1 of the process to hire Contractors through bids for specific projects at the airport.
![Page 8: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/8.jpg)
8
PROCESS MAP – Ex. Bidding Projects
Appendix A – in the PMG Consists of 38 Process maps. This map shows page 2 of the process to hire Contractors through bids for specific projects at the airport.
![Page 9: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/9.jpg)
9
AIM - Business Education Courses
![Page 10: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/10.jpg)
Business Opportunities http://business.flydenver.com/
–Registration
Page
10
Future Opportunities Page
![Page 11: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/11.jpg)
AIM Development – Project Delivery
11
– Project Delivery Methods – Collaboration with our Business Partners,
Project Understanding and Scope Definition, and Risks Determine the best Delivery Method for the Project
– New and Old Methods for DIA:
– Design Build: Lump Sum, GMAX – Hard Bid – On Calls – Hard Bid/Negotiated – CMR/CMGC – Stipends
![Page 12: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/12.jpg)
AIM Development
12
Capital Improvement Program 2014-19 (Infrastructure Program)
– Airfield Pavement Annual Rehabilitation (annual program)
– Rehab 17L-35R Pavement – Gate Pavement Replacement and Drainage Improvement
Program – CMGC w/ Negotiated Fee
– Airfield Drainage Improvements (annual program) – Terminal Taxiway and Apron Slab Rehab (annual program) – Pena Blvd Erosion Control (annual program) – Roadway Pavement Rehabilitation (annual program) – Parking Lot Improvements
![Page 13: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/13.jpg)
AIM Development
13
Capital Improvement Program 2014-19 (Facility Services Program)
– Storm and Sewer Repairs – Piping Repairs – Soil Heaving Foundation Repairs – HVAC Controls Upgrade – Boiler Replacement – Cooling Tower Lining Repair Program – Conveyance Replacement Program – Jetbridge Replacement Program – Concourse B PC Air Replacement
– Baggage System Security Upgrades
![Page 14: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/14.jpg)
14
Questions?
![Page 15: DIA AIM - A NEW, ACCOUNTABLE ORGANIZATION · PDF file1 J. Somer Shindler The New DIA AIM Development DIA Day October 7, 2014](https://reader031.vdocuments.us/reader031/viewer/2022030411/5a9df2627f8b9ae0108dce4f/html5/thumbnails/15.jpg)
15