City of New Orleans – Capital Improvement Program
Desire Group A
May 24, 2018
![Page 2: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/2.jpg)
1
Agenda
• WelcomeLisbeth Pedroso, Mayor’s Office of Neighborhood Engagement
• Project OverviewAustin Wolfson, Department of Public Works
• What to Expect During ConstructionCheryn Robles, Community Outreach Manager
• DiscussionLisbeth Pedroso, Office of Neighborhood Engagement
![Page 3: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/3.jpg)
2
Ground Rules
Presentation will precede public comment
Please limit questions to the project area
Please fill out a comment card to provide a
comment/ask a question
Please raise your hand and your comment card will be
collected by a staff member
There is a two-minute time limit on questions
A staff member will hold the microphone for you
You may not yield time to another speaker
![Page 4: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/4.jpg)
3
Capital Improvement Program Highlights
More than $2.3B worth of DPW / SWB work
Most comprehensive infrastructure program our region has seen in a generation.
More than 200 individual projects - every neighborhood will feel a positive impact.
Multiple Funding Sources: FEMA-funded road / waterline work, FEMA-funded Hazard Mitigation Grant Program (HMGP) projects, HUD-funded National Disaster Resiliency Competition (NDRC) grant projects, SWB-funded Sewer System Evaluation and Rehabilitation Program (SSERP) (sewer consent decree) work and City-funded bond project work.
Aggressive project schedules coordinated to minimize construction-related impacts.
Work will create thousands of construction jobs across the city and
maximize economic opportunity for the City’s small and
disadvantaged businesses.
![Page 5: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/5.jpg)
4
Desire Neighborhood - Planned ConstructionDesire construction is split into four construction contracts:
1. Desire Group A (VAR) – Scheduled start: June 5, 2018,
approximately six month duration
2. Desire Group B (PMOPC) – Scheduled start: Late 2019
3. Desire Group C (FRC) – Scheduled to start: Summer 2021
4. Desire Group D (FRCPC) - Scheduled to start: Late 2020
This first project has a construction value of approximately
$2 M
Total combined value of all four contracts is estimated to
be approximately $24 M
![Page 6: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/6.jpg)
5
• Designer:
Phoenix Global Engineering and
Construction, Inc. Construction
Contractor:
Hard Rock Construction, LLC
• Cost: Approx. $2 M project
• Schedule: Construction will begin
in June 2018 and last for
approximately six months
Desire – Group A
![Page 7: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/7.jpg)
6
Desire– Group AProject Limits
![Page 8: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/8.jpg)
7
Typical Roadway Cross-Section
7
Southbound Northbound
26-feet wide
Drainage
Sewer Line
Water LineOther Underground Utility
Man Hole
Catch
BasinCatch Basin
NOT TO SCALE
![Page 9: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/9.jpg)
8
Existing Conditions
Existing condition 2800 block of Feliciana St. – Pavement Condition Index - Very Poor
![Page 10: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/10.jpg)
9
Existing Conditions
Existing condition 3300 block of Pleasure St. – Pavement Condition Index – Fair
![Page 11: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/11.jpg)
10
Scope of Work
Patch Concrete: Replacing one or more damaged concrete panels
Patch Mill / Overlay: Repaving the asphalt roadway from curb to
curb and repairing damaged sidewalks
Incidental Road Repairs: Removing damaged portions of the
asphalt roadway and replacing it with new smooth pavement.
Non-Paving Incidentals: Repairing damaged sidewalks, driveway
aprons and curbs within the public right-of-way.
![Page 12: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/12.jpg)
11
Patch Concrete
• Replacing one or multiple damaged concrete panels in
the roadway
• Repairs may be made to some damaged curbs, sidewalks
and driveway aprons
After
Before
![Page 13: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/13.jpg)
12
Patch Mill / Overlay
• Roadway will be re-
surfaced with asphalt
• Repairs may be made to
some damaged curbs,
sidewalks and driveway
aprons After
Before
![Page 14: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/14.jpg)
13
Incidental Road Repairs
• Roadway patches will be re-
surfaced with asphalt
• Repairs may be made to
some damaged curbs,
sidewalks and driveway
aprons
Before
After
![Page 15: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/15.jpg)
14
Non-Paving Incidentals
• Eligible damaged or missing
sidewalks will be removed and
replaced
• New sidewalks meet
Americans with Disability Act
requirements
Before
After
![Page 16: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/16.jpg)
15
Americans with Disabilities Act-Compliant Curb Ramps
Before
After
Curb ramps at sidewalk
corners ensure accessibility
for people who are visually
or physically impaired,
using wheelchairs or
strollers.
![Page 17: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/17.jpg)
16
Construction Sequencing
Crews are authorized to work from 7 a.m. to 5:30 p.m. Monday through
Friday. Permission for weekend work may be granted, when necessary.
![Page 18: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/18.jpg)
17
Schedule
Milestone Date
Construction Start Date June 4, 2018
Construction Completed January 2019
* Please note that all schedules are subject to change and weather delays.
![Page 19: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/19.jpg)
18
What to Expect During Construction
Temporary construction impacts
• Additional construction equipment
• Limited parking availability
• Sounds
• Dust
Efforts to minimize construction impacts
• Construction signage placed around the sites.
• Any temporary closures will be communicated in advance.
• Any changes to garbage and US Postal services will be
communicated in advance.
• Residents will be informed throughout construction.
Regular work hours are Monday-Friday 7:00 a.m. to 5:30 p.m.
Permission for occasional weekend work may be granted, if required.
Road
Construction
Ahead
![Page 20: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/20.jpg)
19
Keeping You Informed Roadwork.nola.gov
![Page 21: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/21.jpg)
20
Stay Connected
504.658.ROAD (7623)Facebook.com/roadworkNOLA
@roadworkNOLA
@roadworkNOLA
We have joined NextDoor!
Monthly Newsletter Updates
![Page 23: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/23.jpg)
22
Questions / Discussion
![Page 24: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/24.jpg)
23
Westbank – Group AProject Limits
![Page 25: Desire Group A - Roadwork Nola...2018/05/24 · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to](https://reader033.vdocuments.us/reader033/viewer/2022052006/601a2fe544b84c3c2130ddd5/html5/thumbnails/25.jpg)
24
Westbank – Group BProject Limits