desire group a - roadwork nola...2018/05/24  · lisbeth pedroso, office of neighborhood engagement...

25
City of New Orleans – Capital Improvement Program Desire Group A May 24, 2018

Upload: others

Post on 29-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

City of New Orleans – Capital Improvement Program

Desire Group A

May 24, 2018

Page 2: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

1

Agenda

• WelcomeLisbeth Pedroso, Mayor’s Office of Neighborhood Engagement

• Project OverviewAustin Wolfson, Department of Public Works

• What to Expect During ConstructionCheryn Robles, Community Outreach Manager

• DiscussionLisbeth Pedroso, Office of Neighborhood Engagement

Page 3: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

2

Ground Rules

Presentation will precede public comment

Please limit questions to the project area

Please fill out a comment card to provide a

comment/ask a question

Please raise your hand and your comment card will be

collected by a staff member

There is a two-minute time limit on questions

A staff member will hold the microphone for you

You may not yield time to another speaker

Page 4: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

3

Capital Improvement Program Highlights

More than $2.3B worth of DPW / SWB work

Most comprehensive infrastructure program our region has seen in a generation.

More than 200 individual projects - every neighborhood will feel a positive impact.

Multiple Funding Sources: FEMA-funded road / waterline work, FEMA-funded Hazard Mitigation Grant Program (HMGP) projects, HUD-funded National Disaster Resiliency Competition (NDRC) grant projects, SWB-funded Sewer System Evaluation and Rehabilitation Program (SSERP) (sewer consent decree) work and City-funded bond project work.

Aggressive project schedules coordinated to minimize construction-related impacts.

Work will create thousands of construction jobs across the city and

maximize economic opportunity for the City’s small and

disadvantaged businesses.

Page 5: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

4

Desire Neighborhood - Planned ConstructionDesire construction is split into four construction contracts:

1. Desire Group A (VAR) – Scheduled start: June 5, 2018,

approximately six month duration

2. Desire Group B (PMOPC) – Scheduled start: Late 2019

3. Desire Group C (FRC) – Scheduled to start: Summer 2021

4. Desire Group D (FRCPC) - Scheduled to start: Late 2020

This first project has a construction value of approximately

$2 M

Total combined value of all four contracts is estimated to

be approximately $24 M

Page 6: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

5

• Designer:

Phoenix Global Engineering and

Construction, Inc. Construction

Contractor:

Hard Rock Construction, LLC

• Cost: Approx. $2 M project

• Schedule: Construction will begin

in June 2018 and last for

approximately six months

Desire – Group A

Page 7: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

6

Desire– Group AProject Limits

Page 8: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

7

Typical Roadway Cross-Section

7

Southbound Northbound

26-feet wide

Drainage

Sewer Line

Water LineOther Underground Utility

Man Hole

Catch

BasinCatch Basin

NOT TO SCALE

Page 9: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

8

Existing Conditions

Existing condition 2800 block of Feliciana St. – Pavement Condition Index - Very Poor

Page 10: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

9

Existing Conditions

Existing condition 3300 block of Pleasure St. – Pavement Condition Index – Fair

Page 11: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

10

Scope of Work

Patch Concrete: Replacing one or more damaged concrete panels

Patch Mill / Overlay: Repaving the asphalt roadway from curb to

curb and repairing damaged sidewalks

Incidental Road Repairs: Removing damaged portions of the

asphalt roadway and replacing it with new smooth pavement.

Non-Paving Incidentals: Repairing damaged sidewalks, driveway

aprons and curbs within the public right-of-way.

Page 12: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

11

Patch Concrete

• Replacing one or multiple damaged concrete panels in

the roadway

• Repairs may be made to some damaged curbs, sidewalks

and driveway aprons

After

Before

Page 13: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

12

Patch Mill / Overlay

• Roadway will be re-

surfaced with asphalt

• Repairs may be made to

some damaged curbs,

sidewalks and driveway

aprons After

Before

Page 14: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

13

Incidental Road Repairs

• Roadway patches will be re-

surfaced with asphalt

• Repairs may be made to

some damaged curbs,

sidewalks and driveway

aprons

Before

After

Page 15: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

14

Non-Paving Incidentals

• Eligible damaged or missing

sidewalks will be removed and

replaced

• New sidewalks meet

Americans with Disability Act

requirements

Before

After

Page 16: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

15

Americans with Disabilities Act-Compliant Curb Ramps

Before

After

Curb ramps at sidewalk

corners ensure accessibility

for people who are visually

or physically impaired,

using wheelchairs or

strollers.

Page 17: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

16

Construction Sequencing

Crews are authorized to work from 7 a.m. to 5:30 p.m. Monday through

Friday. Permission for weekend work may be granted, when necessary.

Page 18: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

17

Schedule

Milestone Date

Construction Start Date June 4, 2018

Construction Completed January 2019

* Please note that all schedules are subject to change and weather delays.

Page 19: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

18

What to Expect During Construction

Temporary construction impacts

• Additional construction equipment

• Limited parking availability

• Sounds

• Dust

Efforts to minimize construction impacts

• Construction signage placed around the sites.

• Any temporary closures will be communicated in advance.

• Any changes to garbage and US Postal services will be

communicated in advance.

• Residents will be informed throughout construction.

Regular work hours are Monday-Friday 7:00 a.m. to 5:30 p.m.

Permission for occasional weekend work may be granted, if required.

Road

Construction

Ahead

Page 20: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

19

Keeping You Informed Roadwork.nola.gov

Page 21: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

20

Stay Connected

504.658.ROAD (7623)Facebook.com/roadworkNOLA

@roadworkNOLA

@roadworkNOLA

We have joined NextDoor!

[email protected]

Monthly Newsletter Updates

Page 22: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

21

Contact Information

Cheryn Robles, Outreach Manager

504-658-ROAD (7623)

[email protected]

Page 23: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

22

Questions / Discussion

Page 24: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

23

Westbank – Group AProject Limits

Page 25: Desire Group A - Roadwork Nola...2018/05/24  · Lisbeth Pedroso, Office of Neighborhood Engagement 2 Ground Rules Presentation will precede public comment Please limit questions to

24

Westbank – Group BProject Limits