PROJECT OVERVIEW AND CHALLENGES
Enerflex was awarded the contract for the expansion of the LPG Brown Field Plant in order to increase LPG recovery to 94%, while increasing LPG production to approximately 191 mt/d.
UNIT LOCATION
Palembang, Indonesia
ENERFLEX SOLUTION
Enerflex supplied equipment to expand the natural gas liquids processing and compression facility originally completed by the Company in 2006. The facility separates propane, butane and condensate from liquids-rich gas produced locally and processes the propane and butane into petrochemical - and consumer - grade LPG. The purpose of the facility is to increase the proportion of liquids recovered from the gas stream from 60% to 90-95%. Enerflex Kuala Lumpur and Jakarta offices provided engineering and commissioning services. Equipment was manufactured and provided by the Canadian and US facilities.
DEEP CUT TURBO-EXPANDER LPG PROCESSING FACILITY, INDONESIALPG Facility and Expansion of the LPG Brown Field Plant
G A S P R O C E S S I N G
The Single Source
[email protected] www.enerflex.com
CONTACT DETAILS
ENERFLEX1205 Rasa Tower II555 Phahonyothin RoadChatuchak, Bangkok 10900Thailand