PROJECT OVERVIEW AND CHALLENGES Enerflex was awarded the contract for the expansion of the LPG Brown Field Plant in order to increase LPG recovery to 94%, while increasing LPG production to approximately 191 mt/d. UNIT LOCATION Palembang, Indonesia ENERFLEX SOLUTION Enerflex supplied equipment to expand the natural gas liquids processing and compression facility originally completed by the Company in 2006. The facility separates propane, butane and condensate from liquids-rich gas produced locally and processes the propane and butane into petrochemical - and consumer - grade LPG. The purpose of the facility is to increase the proportion of liquids recovered from the gas stream from 60% to 90- 95%. Enerflex Kuala Lumpur and Jakarta offices provided engineering and commissioning services. Equipment was manufactured and provided by the Canadian and US facilities. DEEP CUT TURBO-EXPANDER LPG PROCESSING FACILITY, INDONESIA LPG Facility and Expansion of the LPG Brown Field Plant GAS PROCESSING The Single Source +66.2.937.1201 info@enerflex.com www.enerflex.com CONTACT DETAILS ENERFLEX 1205 Rasa Tower II 555 Phahonyothin Road Chatuchak, Bangkok 10900 Thailand

Upload: dinhkhuong

Post on 04-May-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: DEEP CUT TURBO-EXPANDER LPG PROCESSING …enerflex.com/...Cut-Turbo-Expander-LPG-Processing-Facility_PRESS.pdfDEEP CUT TURBO-EXPANDER LPG PROCESSING FACILITY, INDONESIA LPG Facility

PROJECT OVERVIEW AND CHALLENGES

Enerflex was awarded the contract for the expansion of the LPG Brown Field Plant in order to increase LPG recovery to 94%, while increasing LPG production to approximately 191 mt/d.

UNIT LOCATION

Palembang, Indonesia

ENERFLEX SOLUTION

Enerflex supplied equipment to expand the natural gas liquids processing and compression facility originally completed by the Company in 2006. The facility separates propane, butane and condensate from liquids-rich gas produced locally and processes the propane and butane into petrochemical - and consumer - grade LPG. The purpose of the facility is to increase the proportion of liquids recovered from the gas stream from 60% to 90-95%. Enerflex Kuala Lumpur and Jakarta offices provided engineering and commissioning services. Equipment was manufactured and provided by the Canadian and US facilities.

DEEP CUT TURBO-EXPANDER LPG PROCESSING FACILITY, INDONESIALPG Facility and Expansion of the LPG Brown Field Plant