Dansko Phase IIIDansko Phase III
West Grove, PAWest Grove, PA
David RosenbergerLighting/ElectricalLighting Advisor: Dr. MistrickElectrical Advisor: Ted Dannerth
![Page 2: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/2.jpg)
Project Team
Owner: Dansko, Inc.
Architect: Bernardon Haber Holloway
MEP/Lighting Design: Brinjac Engineering, Inc.
Structural: Baker, Ingram & Associates
Civil: Gilmore & Associates
Interior: Contract Environments
Geotech: Advanced GeoServices
Construction Management: W.S. Cumby & Son, Inc.
Data/Comm: Tangent Cable
![Page 3: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/3.jpg)
LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design
MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling
ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material
CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture
Outline
![Page 4: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/4.jpg)
LIGHTING DEPTHLIGHTING DEPTHAtrium Lighting DesignAtrium Lighting DesignOpen Office Lighting Design
MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling
ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material
CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture
Outline
![Page 5: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/5.jpg)
Atrium Lighting Design
![Page 6: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/6.jpg)
…through the space…
Atrium
…draw attention to your feet…
Design Intent – Direction
![Page 7: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/7.jpg)
Atrium
![Page 8: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/8.jpg)
Recessed Perimeter Wallwash
“Ribbons of Light”
Diffusing Lens
Recessed “Basket”
Style Direct/Indirect
StriplightsTranslucent
Acrylic “Shoebox”
![Page 9: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/9.jpg)
Elliptical Reflector Uplight
Square Downlight
Handrail-IntegratedLED Strip
![Page 10: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/10.jpg)
Atrium
Average Illuminance:
16 fc
Maximum/Minimum Illuminance Ratio:
3.25:1
![Page 11: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/11.jpg)
Atrium
Average Illuminance:
16 fc
Maximum/Minimum Illuminance Ratio:
1.57:1
![Page 12: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/12.jpg)
Atrium
Average Illuminance on Task Plane:
31 fc
Maximum/Minimum Illuminance Ratio:
2.25:1
![Page 13: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/13.jpg)
Atrium
![Page 14: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/14.jpg)
LIGHTING DEPTHLIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting DesignOpen Office Lighting Design
MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling
ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material
CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture
Outline
![Page 15: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/15.jpg)
Open Office Lighting Design
![Page 16: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/16.jpg)
Open Office
Design Intent – Focus
Production
Design
Presentation
![Page 17: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/17.jpg)
Indirect T5HO Luminaires Integrated
into Furniture
Recessed T5 Downlights with Blade Louvers
Recessed Adjustable MR-16 Downlights
![Page 18: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/18.jpg)
Open Office
Average Illuminance on Task Plane:
36 fc
Maximum/Minimum Illuminance Ratio:
1.56:1
![Page 19: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/19.jpg)
Open Office
Average Illuminance on Ceiling:
78 fc
Maximum/Minimum Illuminance Ratio:
5.42:1
![Page 20: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/20.jpg)
Open Office
Average Illuminance on Task Plane:
34 fc
Maximum/Minimum Illuminance Ratio:
1.19:1
![Page 21: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/21.jpg)
LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design
MECHANICAL BREADTHMECHANICAL BREADTHOpen Office Energy Analysis with Open Office Energy Analysis with High Light Reflectance CeilingHigh Light Reflectance Ceiling
ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material
CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture
Outline
![Page 22: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/22.jpg)
Open Office
High Light Reflectance Ceiling
15% Higher Reflectance than Average Lay-in Ceiling Tile
Allows for a reduction in Lighting Power Density
![Page 23: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/23.jpg)
Component
New Building
($)
Air System Fans 724
Cooling 1,074
Heating 3,998
Pumps 0
Cooling Tower Fans 0
HVAC Sub-Total 5,796
Lights 1,668
Electric Equipment 0
Misc. Electric 0
Misc. Fuel Use 0
Non-HVAC Sub-Total
1,668
Grand Total 7,465
Component
Original Building
($)
Air System Fans 881
Cooling 1,448
Heating 1,336
Pumps 0
Cooling Tower Fans 0
HVAC Sub-Total 3,666
Lights 3,337
Electric Equipment 0
Misc. Electric 0
Misc. Fuel Use 0
Non-HVAC Sub-Total
3,337
Grand Total 7,002
High Light Reflectance Ceiling-Reduced Number of Luminaires
Exposed Structural Ceiling-Standard Layout of Indirect Pendants
![Page 24: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/24.jpg)
LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design
MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling
ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material
CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture
Outline
![Page 25: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/25.jpg)
Emergency Generator vs.Battery Ballasts
![Page 26: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/26.jpg)
LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design
MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling
ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material
CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture
Outline
![Page 27: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/27.jpg)
Feeder Material: Copper vs. Aluminum
![Page 28: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/28.jpg)
LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design
MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling
ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material
CONSTRUCTION MANAGEMENT BREADTHCONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into FurnitureIntegrating Luminaires into Furniture
Outline
![Page 29: Dansko Phase III West Grove, PA](https://reader036.vdocuments.us/reader036/viewer/2022062314/5681372e550346895d9eba9d/html5/thumbnails/29.jpg)
Custom integration of indirect luminaire into office workstation
10-12 week lead time to be UL safety certified
Two Electricians 6.5 hours$527