Page 1: Dansko Phase III West Grove, PA

Dansko Phase IIIDansko Phase III

West Grove, PAWest Grove, PA

David RosenbergerLighting/ElectricalLighting Advisor: Dr. MistrickElectrical Advisor: Ted Dannerth

Page 2: Dansko Phase III West Grove, PA

Project Team

Owner: Dansko, Inc.

Architect: Bernardon Haber Holloway

MEP/Lighting Design: Brinjac Engineering, Inc.

Structural: Baker, Ingram & Associates

Civil: Gilmore & Associates

Interior: Contract Environments

Geotech: Advanced GeoServices

Construction Management: W.S. Cumby & Son, Inc.

Data/Comm: Tangent Cable

Page 3: Dansko Phase III West Grove, PA

LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

Page 4: Dansko Phase III West Grove, PA

LIGHTING DEPTHLIGHTING DEPTHAtrium Lighting DesignAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

Page 5: Dansko Phase III West Grove, PA

Atrium Lighting Design

Page 6: Dansko Phase III West Grove, PA

…through the space…

Atrium

…draw attention to your feet…

Design Intent – Direction

Page 7: Dansko Phase III West Grove, PA

Atrium

Page 8: Dansko Phase III West Grove, PA

Recessed Perimeter Wallwash

“Ribbons of Light”

Diffusing Lens

Recessed “Basket”

Style Direct/Indirect

StriplightsTranslucent

Acrylic “Shoebox”

Page 9: Dansko Phase III West Grove, PA

Elliptical Reflector Uplight

Square Downlight

Handrail-IntegratedLED Strip

Page 10: Dansko Phase III West Grove, PA

Atrium

Average Illuminance:

16 fc

Maximum/Minimum Illuminance Ratio:

3.25:1

Page 11: Dansko Phase III West Grove, PA

Atrium

Average Illuminance:

16 fc

Maximum/Minimum Illuminance Ratio:

1.57:1

Page 12: Dansko Phase III West Grove, PA

Atrium

Average Illuminance on Task Plane:

31 fc

Maximum/Minimum Illuminance Ratio:

2.25:1

Page 13: Dansko Phase III West Grove, PA

Atrium

Page 14: Dansko Phase III West Grove, PA

LIGHTING DEPTHLIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

Page 15: Dansko Phase III West Grove, PA

Open Office Lighting Design

Page 16: Dansko Phase III West Grove, PA

Open Office

Design Intent – Focus

Production

Design

Presentation

Page 17: Dansko Phase III West Grove, PA

Indirect T5HO Luminaires Integrated

into Furniture

Recessed T5 Downlights with Blade Louvers

Recessed Adjustable MR-16 Downlights

Page 18: Dansko Phase III West Grove, PA

Open Office

Average Illuminance on Task Plane:

36 fc

Maximum/Minimum Illuminance Ratio:

1.56:1

Page 19: Dansko Phase III West Grove, PA

Open Office

Average Illuminance on Ceiling:

78 fc

Maximum/Minimum Illuminance Ratio:

5.42:1

Page 20: Dansko Phase III West Grove, PA

Open Office

Average Illuminance on Task Plane:

34 fc

Maximum/Minimum Illuminance Ratio:

1.19:1

Page 21: Dansko Phase III West Grove, PA

LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHMECHANICAL BREADTHOpen Office Energy Analysis with Open Office Energy Analysis with High Light Reflectance CeilingHigh Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

Page 22: Dansko Phase III West Grove, PA

Open Office

High Light Reflectance Ceiling

15% Higher Reflectance than Average Lay-in Ceiling Tile

Allows for a reduction in Lighting Power Density

Page 23: Dansko Phase III West Grove, PA

Component

New Building

($)

Air System Fans 724

Cooling 1,074

Heating 3,998

Pumps 0

Cooling Tower Fans 0

HVAC Sub-Total 5,796

Lights 1,668

Electric Equipment 0

Misc. Electric 0

Misc. Fuel Use 0

Non-HVAC Sub-Total

1,668

Grand Total 7,465

Component

Original Building

($)

Air System Fans 881

Cooling 1,448

Heating 1,336

Pumps 0

Cooling Tower Fans 0

HVAC Sub-Total 3,666

Lights 3,337

Electric Equipment 0

Misc. Electric 0

Misc. Fuel Use 0

Non-HVAC Sub-Total

3,337

Grand Total 7,002

High Light Reflectance Ceiling-Reduced Number of Luminaires

Exposed Structural Ceiling-Standard Layout of Indirect Pendants

Page 24: Dansko Phase III West Grove, PA

LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

Page 25: Dansko Phase III West Grove, PA

Emergency Generator vs.Battery Ballasts

Page 26: Dansko Phase III West Grove, PA

LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

Page 27: Dansko Phase III West Grove, PA

Feeder Material: Copper vs. Aluminum

Page 28: Dansko Phase III West Grove, PA

LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHCONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into FurnitureIntegrating Luminaires into Furniture

Outline

Page 29: Dansko Phase III West Grove, PA

Custom integration of indirect luminaire into office workstation

10-12 week lead time to be UL safety certified

Two Electricians 6.5 hours$527

Page 30: Dansko Phase III West Grove, PA