DAILY WELDING MACHINE INSPECTION CHECKLIST

Contractor : Welding machine no. : Location : Month : Year

Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Remarks

WELDING MACHINE

In good working condition

Provided with earthing or grounding

Provided with drip tray (Dry)

Fire extinguisher is available

Fire extinguisher is available

TERMINALS /JOINTS

In good working condition

Secured and effectively insulated

CABLES

Properly insulated and no exposed cables

Size of cable suitable for voltage supply

Hang up to prevent tripping hazard

Hang on insulated hook or material

Cables and joints are proper and in good condition

ELECTRODE HOLDER / CLAMP

Electrode holder is free from defects

Return cable clamp is free from defects

Detach electrodes when not in use

WORK AREA

No combustible or flammable materials

Fire blanket is provided

Maintain good housekeeping

ForemanSignature

Supervisor Signature