Transcript

issue

integratedDESIGNgrouparchitects | bathurst penrith sydney

bathurst02 6332 6206 t02 6332 6216 f

[email protected] e

sydney02 9764 6100 t02 9764 6111 f

[email protected] e

copyrightintegratedDESIGNgroup p/l

abn 84 115 006 329

nominated architectstony mcburney reg. no. 5273

simon thorne reg. no. 7093

north elevation

strathfield squarecommercial developmentesperia courty pty ltd court p/l |strathfield

ESP13059DH | JB | SL

ST | AE @ a1

project reference:drawn:checked:scale:

figured dimensions take precedence over scaleddrawings | contractors to check and verify all levelsdatum and dimensions on site | all materials andworkmanship to be in accordance with current writtenmanufacturers instructions local regulations and SAAcodes | conflicting information to be brought to noticeof the architect and clarification sought beforeproceeding with any works | all drawings are not forconstruction and are subject to further designdevelopment, consultant input, council and legislativerequirements.

p r e l i m i n a r y n o t f o r c o n s t r u c t i o n

2 0 0 2D A

legend

fittings & finishesBDRY boundaryBOE brick on edgeBPB bagged painted

brickworkCCR colorbond corrugated roof sheetingCF colorbond fasciaCFC compressed fibre

cementCONC concreteCJ control jointCT ceramic tileCPT carpetCRT concrete roof tileCQG colorbond quad gutterDP downpipeDP&S downpipe & spreaderEGL existing ground lineEMB electrical meterboardFB face brickFC fibre cementFFL finished floor levelF fixed glassFGL finished ground lineGM gas meterHWS hot water servicePB plasterboardPCR painted cement renderPFB painted face brickPFC painted fibre cementPWB painted weatherboardSC soldier courseTFB timber floor boardsTRC terracotta roof tilesWM water meter

b basinb/head bulkheadcs cavity sliding doordry dryerdw dishwasherexh exhaust fanfr freezerfw floor wastehc hollow core doorhr handraillb letterboxm mirrormw microwaveo/h overheadp pantryref refrigeratorrh rangehoodsc solid core doorsh soap holderss stainless steel sinkst stoveshwr showert tubtr towel railtrh toilet roll holdertyp. typicalwc water closetwm washing machinev vinylvp vent pipeuo under bench ovenwo wall oven

rl reduced levelffl finished floor levelssl structural slab leveltow top of walltyp typical

RL 24,600

RL 21,200

RL 17,200

RL 28,000

RL 31,400

RL 34,800

RL 38,200

RL 41,600

RL 45,000

RL 48,400

RL 51,800

RL 54,200

4,00

04,

000

3,40

03,

400

3,40

03,

400

3,40

03,

400

3,40

03,

400

3,40

02,

400

external steel exoskeletonstructure

level 2 terrace - refer tolandscape architects details

external aluminium louvres(refer to finishes schedule)

solid composite wall panels(refer to finished schedule)

roof lobby and lift overrun

glass louvres tocommercial balconies(refer to finishes schedule)

glass curtain wall(refer to finishes schedule)

ground floor

first floor

second floor

third floor

fourth floor

fifth floor

sixth floor

seventh floor

eighth floor

nineth floor

tenth floor

roof level

lift overrun

RL 13,200

glass louvres tocommercial balconies(refer to finishes schedule)

glass curtain wall(refer to finishes schedule)

the boulevarde8 the boulevarde 12 churchill avenuesubject site

pedestrian entryvehicle entry

I

21/12/16 i REVISED ISSUE FOR DA01/06/16 h revised page layout10/02/16 g DA ISSUE17/12/15 f screens added09/12/15 e issue for final co-ordination23/11/15 d issue for client approval (revised)14/11/15 c issue for client approval11/09/15 b issue for consultant co-ordination21/05/15 a preliminary issue for consultant co-ordination

not applicable

Top Related