da i 2002 - strathfield council · bp b ag edp int b ric kwo ... 11/09/15 b issue for consultant...
TRANSCRIPT
issue
integratedDESIGNgrouparchitects | bathurst penrith sydney
bathurst02 6332 6206 t02 6332 6216 f
sydney02 9764 6100 t02 9764 6111 f
copyrightintegratedDESIGNgroup p/l
abn 84 115 006 329
nominated architectstony mcburney reg. no. 5273
simon thorne reg. no. 7093
north elevation
strathfield squarecommercial developmentesperia courty pty ltd court p/l |strathfield
ESP13059DH | JB | SL
ST | AE @ a1
project reference:drawn:checked:scale:
figured dimensions take precedence over scaleddrawings | contractors to check and verify all levelsdatum and dimensions on site | all materials andworkmanship to be in accordance with current writtenmanufacturers instructions local regulations and SAAcodes | conflicting information to be brought to noticeof the architect and clarification sought beforeproceeding with any works | all drawings are not forconstruction and are subject to further designdevelopment, consultant input, council and legislativerequirements.
p r e l i m i n a r y n o t f o r c o n s t r u c t i o n
2 0 0 2D A
legend
fittings & finishesBDRY boundaryBOE brick on edgeBPB bagged painted
brickworkCCR colorbond corrugated roof sheetingCF colorbond fasciaCFC compressed fibre
cementCONC concreteCJ control jointCT ceramic tileCPT carpetCRT concrete roof tileCQG colorbond quad gutterDP downpipeDP&S downpipe & spreaderEGL existing ground lineEMB electrical meterboardFB face brickFC fibre cementFFL finished floor levelF fixed glassFGL finished ground lineGM gas meterHWS hot water servicePB plasterboardPCR painted cement renderPFB painted face brickPFC painted fibre cementPWB painted weatherboardSC soldier courseTFB timber floor boardsTRC terracotta roof tilesWM water meter
b basinb/head bulkheadcs cavity sliding doordry dryerdw dishwasherexh exhaust fanfr freezerfw floor wastehc hollow core doorhr handraillb letterboxm mirrormw microwaveo/h overheadp pantryref refrigeratorrh rangehoodsc solid core doorsh soap holderss stainless steel sinkst stoveshwr showert tubtr towel railtrh toilet roll holdertyp. typicalwc water closetwm washing machinev vinylvp vent pipeuo under bench ovenwo wall oven
rl reduced levelffl finished floor levelssl structural slab leveltow top of walltyp typical
RL 24,600
RL 21,200
RL 17,200
RL 28,000
RL 31,400
RL 34,800
RL 38,200
RL 41,600
RL 45,000
RL 48,400
RL 51,800
RL 54,200
4,00
04,
000
3,40
03,
400
3,40
03,
400
3,40
03,
400
3,40
03,
400
3,40
02,
400
external steel exoskeletonstructure
level 2 terrace - refer tolandscape architects details
external aluminium louvres(refer to finishes schedule)
solid composite wall panels(refer to finished schedule)
roof lobby and lift overrun
glass louvres tocommercial balconies(refer to finishes schedule)
glass curtain wall(refer to finishes schedule)
ground floor
first floor
second floor
third floor
fourth floor
fifth floor
sixth floor
seventh floor
eighth floor
nineth floor
tenth floor
roof level
lift overrun
RL 13,200
glass louvres tocommercial balconies(refer to finishes schedule)
glass curtain wall(refer to finishes schedule)
the boulevarde8 the boulevarde 12 churchill avenuesubject site
pedestrian entryvehicle entry
I
21/12/16 i REVISED ISSUE FOR DA01/06/16 h revised page layout10/02/16 g DA ISSUE17/12/15 f screens added09/12/15 e issue for final co-ordination23/11/15 d issue for client approval (revised)14/11/15 c issue for client approval11/09/15 b issue for consultant co-ordination21/05/15 a preliminary issue for consultant co-ordination
not applicable