da i 2002 - strathfield council · bp b ag edp int b ric kwo ... 11/09/15 b issue for consultant...

1
issue integratedDESIGNgroup architects | bathurst penrith sydney bathurst 02 6332 6206 t 02 6332 6216 f [email protected] e sydney 02 9764 6100 t 02 9764 6111 f [email protected] e copyright integratedDESIGNgroup p/l abn 84 115 006 329 nominated architects tony mcburney reg. no. 5273 simon thorne reg. no. 7093 north elevation strathfield square commercial development esperia courty pty ltd court p/l | strathfield ESP13059 DH | JB | SL ST | AE @ a1 project reference: drawn: checked: scale: figured dimensions take precedence over scaled drawings | contractors to check and verify all levels datum and dimensions on site | all materials and workmanship to be in accordance with current written manufacturers instructions local regulations and SAA codes | conflicting information to be brought to notice of the architect and clarification sought before proceeding with any works | all drawings are not for construction and are subject to further design development, consultant input, council and legislative requirements. p r e l i m i n a r y n o t f o r c o n s t r u c t i o n 2002 DA legend fittings & finishes BDRY boundary BOE brick on edge BPB bagged painted brickwork CCR colorbond corrugated roof sheeting CF colorbond fascia CFC compressed fibre cement CONC concrete CJ control joint CT ceramic tile CPT carpet CRT concrete roof tile CQG colorbond quad gutter DP downpipe DP&S downpipe & spreader EGL existing ground line EMB electrical meterboard FB face brick FC fibre cement FFL finished floor level F fixed glass FGL finished ground line GM gas meter HWS hot water service PB plasterboard PCR painted cement render PFB painted face brick PFC painted fibre cement PWB painted weatherboard SC soldier course TFB timber floor boards TRC terracotta roof tiles WM water meter b basin b/head bulkhead cs cavity sliding door dry dryer dw dishwasher exh exhaust fan fr freezer fw floor waste hc hollow core door hr handrail lb letterbox m mirror mw microwave o/h overhead p pantry ref refrigerator rh rangehood sc solid core door sh soap holder ss stainless steel sink st stove shwr shower t tub tr towel rail trh toilet roll holder typ. typical wc water closet wm washing machine v vinyl vp vent pipe uo under bench oven wo wall oven rl reduced level ffinished floor level ssl structural slab level tow top of wall typ typical RL 24,600 RL 21,200 RL 17,200 RL 28,000 RL 31,400 RL 34,800 RL 38,200 RL 41,600 RL 45,000 RL 48,400 RL 51,800 RL 54,200 4,000 4,000 3,400 3,400 3,400 3,400 3,400 3,400 3,400 3,400 3,400 2,400 external steel exoskeleton structure level 2 terrace - refer to landscape architects details external aluminium louvres (refer to finishes schedule) solid composite wall panels (refer to finished schedule) roof lobby and lift overrun glass louvres to commercial balconies (refer to finishes schedule) glass curtain wall (refer to finishes schedule) ground floor first floor second floor third floor fourth floor fifth floor sixth floor seventh floor eighth floor nineth floor tenth floor roof level lift overrun RL 13,200 glass louvres to commercial balconies (refer to finishes schedule) glass curtain wall (refer to finishes schedule) the boulevarde de 1 subject site pedestrian entry vehicle entry I 21/12/16 i REVISED ISSUE FOR DA 01/06/16 h revised page layout 10/02/16 g DA ISSUE 17/12/15 f screens added 09/12/15 e issue for final co-ordination 23/11/15 d issue for client approval (revised) 14/11/15 c issue for client approval 11/09/15 b issue for consultant co-ordination 21/05/15 a preliminary issue for consultant co-ordination not applicable

Upload: lydiep

Post on 17-Sep-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

issue

integratedDESIGNgrouparchitects | bathurst penrith sydney

bathurst02 6332 6206 t02 6332 6216 f

[email protected] e

sydney02 9764 6100 t02 9764 6111 f

[email protected] e

copyrightintegratedDESIGNgroup p/l

abn 84 115 006 329

nominated architectstony mcburney reg. no. 5273

simon thorne reg. no. 7093

north elevation

strathfield squarecommercial developmentesperia courty pty ltd court p/l |strathfield

ESP13059DH | JB | SL

ST | AE @ a1

project reference:drawn:checked:scale:

figured dimensions take precedence over scaleddrawings | contractors to check and verify all levelsdatum and dimensions on site | all materials andworkmanship to be in accordance with current writtenmanufacturers instructions local regulations and SAAcodes | conflicting information to be brought to noticeof the architect and clarification sought beforeproceeding with any works | all drawings are not forconstruction and are subject to further designdevelopment, consultant input, council and legislativerequirements.

p r e l i m i n a r y n o t f o r c o n s t r u c t i o n

2 0 0 2D A

legend

fittings & finishesBDRY boundaryBOE brick on edgeBPB bagged painted

brickworkCCR colorbond corrugated roof sheetingCF colorbond fasciaCFC compressed fibre

cementCONC concreteCJ control jointCT ceramic tileCPT carpetCRT concrete roof tileCQG colorbond quad gutterDP downpipeDP&S downpipe & spreaderEGL existing ground lineEMB electrical meterboardFB face brickFC fibre cementFFL finished floor levelF fixed glassFGL finished ground lineGM gas meterHWS hot water servicePB plasterboardPCR painted cement renderPFB painted face brickPFC painted fibre cementPWB painted weatherboardSC soldier courseTFB timber floor boardsTRC terracotta roof tilesWM water meter

b basinb/head bulkheadcs cavity sliding doordry dryerdw dishwasherexh exhaust fanfr freezerfw floor wastehc hollow core doorhr handraillb letterboxm mirrormw microwaveo/h overheadp pantryref refrigeratorrh rangehoodsc solid core doorsh soap holderss stainless steel sinkst stoveshwr showert tubtr towel railtrh toilet roll holdertyp. typicalwc water closetwm washing machinev vinylvp vent pipeuo under bench ovenwo wall oven

rl reduced levelffl finished floor levelssl structural slab leveltow top of walltyp typical

RL 24,600

RL 21,200

RL 17,200

RL 28,000

RL 31,400

RL 34,800

RL 38,200

RL 41,600

RL 45,000

RL 48,400

RL 51,800

RL 54,200

4,00

04,

000

3,40

03,

400

3,40

03,

400

3,40

03,

400

3,40

03,

400

3,40

02,

400

external steel exoskeletonstructure

level 2 terrace - refer tolandscape architects details

external aluminium louvres(refer to finishes schedule)

solid composite wall panels(refer to finished schedule)

roof lobby and lift overrun

glass louvres tocommercial balconies(refer to finishes schedule)

glass curtain wall(refer to finishes schedule)

ground floor

first floor

second floor

third floor

fourth floor

fifth floor

sixth floor

seventh floor

eighth floor

nineth floor

tenth floor

roof level

lift overrun

RL 13,200

glass louvres tocommercial balconies(refer to finishes schedule)

glass curtain wall(refer to finishes schedule)

the boulevarde8 the boulevarde 12 churchill avenuesubject site

pedestrian entryvehicle entry

I

21/12/16 i REVISED ISSUE FOR DA01/06/16 h revised page layout10/02/16 g DA ISSUE17/12/15 f screens added09/12/15 e issue for final co-ordination23/11/15 d issue for client approval (revised)14/11/15 c issue for client approval11/09/15 b issue for consultant co-ordination21/05/15 a preliminary issue for consultant co-ordination

not applicable