Download - Creating Alternates SPD
-
8/14/2019 Creating Alternates SPD
1/14
System Process DocumentCreating Alternates
Department
Responsibility/Role
File Name 27761350.docRevision
Document Generation Date 18/01/2010 09:34:00
Date Modified 1/18/2010 09:34:00 AM
Last Changed by
Status
Creating Alternates
Trigger:
Concept
The Alternates page enables you to create an alternate bill, which describes a list of alternate
component items that produce an assembly. An alternate routing describes an alternate
manufacturing process that produces an assembly.
In this topic, you will create an alternate component.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/18/2010 09:34:00 AM Page 1
-
8/14/2019 Creating Alternates SPD
2/14
System Process DocumentCreating Alternates
Procedure
Step Action
1. Begin by navigating to the Alternates page.
Click the vertical scrollbar.
Page 2 Last changed on: 1/18/2010 09:34:00 AM
-
8/14/2019 Creating Alternates SPD
3/14
System Process DocumentCreating Alternates
Step Action
2. Click the Manufacturing and Distribution Manager link.
Last changed on: 1/18/2010 09:34:00 AM Page 3
-
8/14/2019 Creating Alternates SPD
4/14
System Process DocumentCreating Alternates
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Alternates link.
Page 4 Last changed on: 1/18/2010 09:34:00 AM
-
8/14/2019 Creating Alternates SPD
5/14
System Process DocumentCreating Alternates
Step Action
5. Use the Organizations page to select your organization.
Last changed on: 1/18/2010 09:34:00 AM Page 5
-
8/14/2019 Creating Alternates SPD
6/14
System Process DocumentCreating Alternates
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OKbutton.
orPress [Alt+O].
Page 6 Last changed on: 1/18/2010 09:34:00 AM
-
8/14/2019 Creating Alternates SPD
7/14
System Process DocumentCreating Alternates
Step Action
8. Use the Alternates page to describe an alternate list of component items that
produce an assembly.
Last changed on: 1/18/2010 09:34:00 AM Page 7
-
8/14/2019 Creating Alternates SPD
8/14
System Process DocumentCreating Alternates
Step Action
9. Click the New button.
Step Action
10. Enter the desired information into the Alternate field. Enter "MALT".
Page 8 Last changed on: 1/18/2010 09:34:00 AM
-
8/14/2019 Creating Alternates SPD
9/14
System Process DocumentCreating Alternates
Step Action
11. Enter the desired information into the Description field. Enter "Manufacturing
Alternative".
Last changed on: 1/18/2010 09:34:00 AM Page 9
-
8/14/2019 Creating Alternates SPD
10/14
System Process DocumentCreating Alternates
Step Action
12. The Inactive On field enables you to set a date, on which you can no longer assign
the alternate to a bill of material or routing.
Click in the Inactive On field.
Step Action
13. Click the Inactive On button.
Page 10 Last changed on: 1/18/2010 09:34:00 AM
-
8/14/2019 Creating Alternates SPD
11/14
System Process DocumentCreating Alternates
Step Action
14. Use the Calendar to set a future inactive date.
Last changed on: 1/18/2010 09:34:00 AM Page 11
-
8/14/2019 Creating Alternates SPD
12/14
System Process DocumentCreating Alternates
Step Action
15. Click the 23 button.
Step Action
16. Click the OKbutton.
Page 12 Last changed on: 1/18/2010 09:34:00 AM
-
8/14/2019 Creating Alternates SPD
13/14
System Process DocumentCreating Alternates
Step Action
17. Click the Save button.
Last changed on: 1/18/2010 09:34:00 AM Page 13
-
8/14/2019 Creating Alternates SPD
14/14
System Process DocumentCreating Alternates
Step Action
18. You have completed the Creating Alternates procedure.
End of Procedure.
Page 14 Last changed on: 1/18/2010 09:34:00 AM